• Title/Summary/Keyword: parallel tunnel

Search Result 146, Processing Time 0.022 seconds

Field Application of Hydraulic Rock Splitting Technique to Biotite Granite (흑운모화강암 지역에 대한 수압암반절개기술의 현장 적용)

  • Park, Jongoh;Lee, Dal-Heui;Woo, Ik
    • Tunnel and Underground Space
    • /
    • v.27 no.5
    • /
    • pp.263-270
    • /
    • 2017
  • Hydraulic rock splitting is a technique which leads to failure of rockmass by means of water injection with a pressure higher than the tensile strength of rockmass, using straddle packer installed in boreholes drilled from free surface. Field tests were conducted in this study for several slopes of biotite granite according to various designs for borehole layout and water injection. Test results showed that new cracks were generated to connect to adjacent holes or that pre-existed cracks were propagated by injection, finally leading to failure. In particular, this study suggests the possibility of controlling the direction of generated cracks with guide slot, since new cracks were generated parallel to the guide slots carved on a borehole wall before injection. Various types of borehole layout and injection methods should be further developed for the practical uses, considering the factors influencing on crack generation.

Distribution of Wind Force Coefficients on the Single-span Arched House (아치형 단동하우스의 풍력계수 분포에 관한 연구)

  • 이석건;이현우
    • Journal of Bio-Environment Control
    • /
    • v.1 no.1
    • /
    • pp.28-36
    • /
    • 1992
  • The wind pressure distributions were analyzed to provide fundamental criteria for the structural design on e single-span arched house according to the wind directions through the wind tunnel experiment. In order to investigate the wind force distributions, the variation of the wind force coefficients, the mean wind force coefficients, the drag force coefficients and the lift force coefficients were estimated by using the experimental data. The results obtained are as follows: 1. When the wind direction was normal to the wall, the maximum positive wind pressure along the height of the wall occurred approximately at two-thirds of the wall height because of the effects of boundary layer flow. 2. When the wind direction was 30$^{\circ}$ to the wall, the maximum positive wind force occurred at the windward edge of the wall. When the wind direction was parallel to the wall, the maximum negative wind force occurred at the windward edge of the wall. 3. The maximum negative wind force along the width of the roof appeared around the width ratio, 0.4, and that along the length of the roof appeared around the length ratio, 0.5. 4. According to the results of the mean wind force coefficients analysis, the maximum negative wind force occurred on the roof at the wind direction of 30$^{\circ}$. 5. The wind forces at the wind direction of 30$^{\circ}$ instead of 0$^{\circ}$ are recommended in the structural design of supports for a house. 6. To prevent partial damage of a house structure by wind forces, the local wind forces should be considered to the structural design of a house.

  • PDF

A Study on the Status and Major Achievements on Mine Subsidence Prevention Technology (광해방지 지반침하방지 기술개발 추진 현황 및 주요 성과)

  • Yang, In Jae;Lee, Seung Ah
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.357-365
    • /
    • 2017
  • The mine subsidence prevention technology has been promoted based on the field test for design, construction, automation measurement and monitoring optimized for investigation, design and mine-filling efficiency customized in Korean mining environment. Based on the R&D roadmap ('07~'16) of the 1st and 2nd stage, mine reclamation technology development has been focused on developing method of evaluating subsidence stability, development of filling material and optimum filling technology, and development of measuring instrument. In the future, in order to systematic management for the subsidence risk areas, we intend to enhance technological capabilities and strengthen the technological infrastructure for business promotion in parallel with the discovery and introduction of new technology to prevent subsidence in the 4th Industrial Revolution era.

Penetration of Compacted Bentonite into the Discontinuity in the Excavation Damaged Zone of Deposition Hole in the Geological Repository (심층처분장 처분공 주변 굴착손상영역에 존재하는 불연속면으로의 압축 벤토나이트 침투)

  • Lee, Changsoo;Cho, Won-Jin;Kim, Jin-Seop;Kim, Geon-Young
    • Tunnel and Underground Space
    • /
    • v.30 no.3
    • /
    • pp.193-213
    • /
    • 2020
  • A mathematical model to simulate more realistically the penetration of compacted bentonite buffer installed in the deposition hole into the discontinuity in the excavation damaged zone formed at the inner wall of the deposition hole in the geological repository for spent fuel is developed. In this model, the penetration of compacted bentonite is assumed to be the flow of Bingham fluid through the parallel planar rock fracture. The penetration of compacted bentonite is analyzed using the developed model. The results show that the maximum penetration depth of compacted bentonite into the rock fracture is proportioned to the swelling pressure of saturated compacted bentonite and the aperture of rock fracture. However, it is in inverse proportion to the yield strength of compacted bentonite. The viscosity of compacted bentonite dominates the penetration rate of compacted bentonite, but has no influence to the maximum penetration depth.

Formation Mechanism of Recumbent Fold observed in the Bangrim-ri, Pyeongchang-gun, Korea (평창군 방림리에 발달하는 횡와습곡의 형성 기작)

  • Cheon, Youngbeom;Kang, Hee-Cheol;Ha, Sangmin;Lee, Sun-Kap;Son, Moon;Ryoo, Chung-Ryul
    • The Journal of the Petrological Society of Korea
    • /
    • v.28 no.3
    • /
    • pp.217-225
    • /
    • 2019
  • This study describes a large recumbent fold, which occurs at the north entrance slope of the Batjae tunnel, Pyeongchang-gun, Gangwon-do, and interprets its formation mechanism. The several-hundred-meter scale fold, developed in the Jeongseon Limestone of the Paleozoic Joseon Supergroup, has a nearly horizontal axial plane and its head is facing north. Stretching lineations ($L_1$) observed on the composite foliations of bedding and axial plane cleavage plunge southward at about $10^{\circ}$. Small A-type or eye-shaped sheath folds together with S-shaped asymmetrical folds are often observed in the fold limbs and their axes are nearly parallel to the lineations ($L_1$) within center and rear parts of the fold. It is thus interpreted that the recumbent fold is a large sheath fold produced by the top-to-the-north ductile shearing due to the Songrim orogeny during the late Paleozoic to Triassic.

Study for Reducing Safety Distance by Installing Ammunition Storage Facility in Underground (탄약저장시설 지하화에 따른 안전거리 축소방안 연구)

  • Park, Sangwoo;Jun, Jonghoon;Choi, Hangseok;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.3
    • /
    • pp.253-260
    • /
    • 2020
  • With increasing interest in an underground-type ammunition storage facility, several design results have been provided recently. However, since not only experts in the tunnel but also military persons in charge of ammunition have not fully understood the safety distance standard, reliable design results are not being produced. In this study, the effective design method of an underground-type ammunition storage facility was provided by analyzing the current safety distance standard. First, the critical safety distances that dominate the size of construction site for underground-type ammunition storage facilities were evaluated, which are the layout of chambers and the configuration of the entrances. Then, the decreasing effect of inter-chamber distance was studied according to the rock type and the storage density of ammunition. In addition, the method of designing tunnels with parallel lines and two-floors was considered for arranging more chambers while complying with the safety distance standards. In particular, numerical simulations were carried out to determine the satisfaction of the safety distance standards when an underground-type ammunition storage facility is composed of two-floor and the decreasing effect of inter-chamber distance according to the inner explosive pressure reduction. Finally, the method to adjust the size of entrances and the path of pressure were studied for decreasing the safety distance at the entrance.

Building Transparency on the Total System Performance Assessment of Radioactive Repository through the Development of the FEAS Program (FEAS 프로그램 개발을 통한 방사성폐기물 처분장 종합 성능 평가(TSPA) 투명성 증진에 관한 연구)

  • 서은진;황용수;강철형
    • Tunnel and Underground Space
    • /
    • v.13 no.4
    • /
    • pp.270-278
    • /
    • 2003
  • Transparency on the Total System Performance Assessment (TSPA) is the key issue to enhance the public acceptance for a permanent high level radioactive repository. Traditionally, the study on features, events and processes (FEPs) and associated scenarios has been regarded as the starting point to open the communicative discussion on TSPA such as what to evaluate, how to evaluate and how to translate outcomes into more friendly language that many stakeholders can easily understand and react with. However, in most cases, it has been limited to one way communication, because it is difficult for stakeholders outside the performance assessment field to assess the details on the story of the safety assessment, scenario and technical background of it. Fortunately, the advent of the internet era opens up the possibility of two way communication from the beginning of the performance assessment so that every stakeholder can exchange their keen opinions on the safety issues. To achieve it, KAERI develops the systematic approach from the FEPs to Assessment methods flow chart. All information is integrated into the web based program named FEAS (FEp to Assessment through Scenario development) under development in KAERI. In parallel, two independent systems are also under development the web based QA(Quality Assurance) system and the PA(Performance Assessment) input database. It is ideal to integrate the input data base with the QA system so that every data in the system can checked whenever necessary. Throughout the next phase R&D starting from the year 2003, these three systems will be consolidated into one unified system.

Analysis of Slope Stability and Property of Discontinuities Using Square-Inventory Method: The Changri area, Boeun-Gun, Chungbuk (정면적법을 이용한 불연속면의 특성화 및 사면안정해석: 충북 보은군 내북면 창리 지역)

  • Choi, Byoung-Ryol;Cheong, Sang-Won
    • Tunnel and Underground Space
    • /
    • v.18 no.1
    • /
    • pp.20-32
    • /
    • 2008
  • The study shows a method called a square-inventory method, which is a better and faster method than scanline survey and window method for an analysis of slope stability. The study area is located in the Changri area, Boeun-Gun, Chungbuk, and consists of many formations of the Okcheon Supergroup. Various types of failure are observed from the phyllite including the rocks in the study area. The physical properties of meta-sedimentary rocks are that minerals of the rocks are composed of microcrystalline quartz and sericite, which are arranged parallel to bedding (or schistosity) and crenulation cleavage. Therefore, such properties affect geotechnical ones of the rock. The slope stability are analyzed by selecting 3 areas, each of which are divided into 2 or 3 slopes of $1m{\times}1m$ area that represent each of 3 investigation sites. The possibility of wedge and toppling failure is very high in all 3 areas by using square-inventory method. Although possibility of plane failure is weak in the investigation site 2, the plane failures are frequently found from the slope of site 2. The bedding (or schistosity) plane and cleavage, another types of discontinuity coexist in meta-sedimentary rocks uulike igneous rocks, and therefore are important factors to be considered together with joint structures in th ε analysis of slope stability.

A study on the excavation cycle by the drill-and-blast method for a room-and-pillar underground structure (주방식 지하구조물의 발파 굴착공정 분석 연구)

  • Lee, Chul-Ho;Hyun, Young-Hwan;Hwang, Je-Don;Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.6
    • /
    • pp.511-524
    • /
    • 2016
  • Since a room-and-pillar underground structure is characterized by its grid-type array of room and pillar, its economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill-and-blast method as a excavation method for a room-and-pillar underground structure was examined. In addition, the parallel excavation sequence was considered as the main sequence of a room-and-pillar underground structure. Sequences of mucking and support installation were derived to estimate the total excavation cycle by taking the case of a road tunnel into consideration. From the excavation cycle of room-and-pillar underground structure, the relationship between available maximum and minimum numbers of jumbo drill machines depending on the number of faces in operation was suggested.

A New Algorithm for the Interpretation of Joint Orientation Using Multistage Convergent Photographing Technique (수렴다중촬영기법을 이용한 새로운 절리방향 해석방법)

  • 김재동;김종훈
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.486-494
    • /
    • 2003
  • When the orientations of joints are measured on a rock exposure, there are frequent cases that are difficult to approach by the surveyor to the target joints or to set up scanlines on the slope. In this study, to complement such limit and weak points, a new algorithm was developed to interpret joint orientation from analyzing the images of rock slope. As a method of arranging the multiple images of a rock slope, the multistage convergent photographing system was introduced to overcome the limitation of photographing direction which existing method such as parallel stereophotogrammetric system has and to cover the range of image measurement, which is the overlapping area between the image pair, to a maximum extent. To determine camera parameters in the perspective projection equation that are the main elements of the analysis method, a new method was developed introducing three ground control points and single ground guide point. This method could be considered to be very simple compared with other existing methods using a number of ground control points and complicated analysis process. So the global coordinates of a specific point on a rock slope could be analyzed with this new method. The orientation of a joint could be calculated using the normal vector of the joint surface which can be derived from the global coordinates of several points on the joint surface analyzed from the images.