The construction of parallel tunnel by using the shield TBM method was increased recently. Accordingly the application and the propriety of the parallel shield TBM tunnels were studied through domestic and foreign construction cases herein. Also the behavior of tunnel structure and ground was evaluated by a numerical analysis with various ground conditions and the distance between the parallel tunnels. As a result, it was concluded that a deep investigation as well as a ground reinforcement was required with a ratio(L/D) of the distance between the parallel tunnels(L) to tunnel outer diameter(D) less than 0.5 because the Interference phenomenon was expected to occur. And the appropriateness of the application method of parallel shield TBM tunnel was validated through the 2-dimensional numerical analysis simulated the process of excavation after the ground reinforcement in the starting area of the OOO construction site with the ratio(L/D) of 0.35.
An assembly system (AS), a valuable tool for mass production, is generally composed of a number of workstations and a transport system. While the workstations perform some preplanned operations, the transport system moves the assemblies by special designed pallets from one station to another. One common problem associated with automatic assembly systems is that some assembly operations may have relatively long cycle times. As a consequence, the productivity, as determined by the operations with the longest cycle time, can be reduced significantly. Therefore, special forms of parallel workstations were developed to improve the performance of an assembly system. In this paper, three most commonly used parallel stations: on-line, off-line and tunnel-gated stations in a free transfer assembly system are studied via discrete event simulation. Our findings revealed that the off-line parallel system has the best performance because the two independent parallel stations can lower the buffer requirement; reduce the sensitivity to variability of processing time and balance of a line. On-line parallel systems were found to have a relatively poor performance, because the operations of two parallel stations block each other, and higher buffer capacity is required to achieve similar capacity. The tunnel-gated system was more efficient than the on-line system since the first parallel station can operate independently. More importantly, we have quantified the productivity of the three different strategies mentioned. Engineers can choose the optimal strategies for installing parallel stations under their working environment.
최근 용지매입의 제한, 주변 구조물과의 간섭 등으로 두 터널의 이격거리가 매우 작은 근접 병설터널의 시공이 증가하고 있다. 이러한 경우 터널의 안정성뿐만 아니라 중앙 필라부의 안정성 확보를 위한 보강공법의 선정은 매우 중요한 문제라 할 수 있다. 본 연구에서는 상 하행선의 터널단면이 다른 비대칭 형태이면서, 두 터널간의 이격거리가 매우 근접한 병설터널에 대한 안정성 평가 및 필라부 보강방안에 대하여 상세한 해석적 검토를 수행하였다. 또한 근접 병설터널의 안정성을 확보할 수 있도록 암반 필라의 안정성 검토와 보강공법 등 근접 병설터널의 사례연구를 토대로 보강공법의 적정성과 합리적인 대안을 제시하였다. 특히, 굴착순서, 이격거리, 굴착방법에 따른 터널 거동 파악을 위하여 암반 필라의 응력상태 및 터널변위를 분석하여 암반파괴이론에 근거한 안정성 평가를 수행하였다. 또한 암반 필라부 보강공법의 적정성 검토 및 향후 근접병설 터널에서의 암반 필라 안정성 확보를 위한 개선방안을 제안하였다
근접병설터널은 충분한 이격거리를 확보한 병설터널의 거동특성과는 구별되는 거동특성을 보이므로 이에 대한 체계적인 안정성 평가방법을 대단면 근접병설터널 설계사례를 중심으로 고찰하였다. 또한 대단면 근접병설의 경우 필러부의 안정성을 확보하는 것이 본 터널의 안정성을 좌우하는 매우 중요한 요소라 할 수 있다. 본 검토에서는 대단면 근접병설터널 시공경험을 바탕으로 이격거리, 지반조건 및 굴착순서에 따른 필러부의 역학적 거동특성을 해석적으로 검토하여 대단면 근접병설터널 계획시 합리적인 터널설계 시공이 이루어질수 있도록 도움이 되고자 하였다.
Flexible stay cables on cable-stayed bridges are three-dimensional. They sag and flex in the complex wind environment, which is a different situation to ideal rigid cylinders in two-dimensional wind flow. Aerodynamic interference and the response characteristics of wake galloping of full-scale parallel cables are potentially different due to three-dimensional flows around cables. This study presents a comprehensive wind tunnel investigation of wake galloping of parallel stay cables using three-dimensional aeroelastic cable models. The wind tunnel study focuses on the large spacing instability range, addressing the effects of cable separation, wind yaw angle, and wind angle of attack on wake galloping response. To investigate the effectiveness of vibration suppression measures, wind tunnel studies on the transversely connected cable systems for two types of connections (flexibility and rigidity) at two positions (mid-span and quarter-span) were also conducted. This experimental study provides useful insights for better understanding the characteristics of wake galloping that will help in establishing a guideline for the wind-resistant design of the cable system on cable-stayed bridges.
2-아치 터널은 터널의 간격이 매우 좁아서 병렬 터널에 비해 점유 면적이 작으나 경제적이지 못하다. 병렬 터널은 경제적이긴 하지만 2-아치 터널보다 점유 면적이 커서 용지의 매입이 어려운 경우에는 문제가 될 수 있다. 새로운 설계는 이 두 터널을 터널의 간격이 점차 증가하는 제3의 병렬터널로 연결시키는 것이다. 접속터널의 필라는 폭이 매우 좁을 수 있기 때문에 이 새로운 설계를 불량한 암반에 적용하려면 검증이 필요하다. 이에 4등급 및 5등급 암반에 대해 2차원 및 3차원 수치해석을 이용하여 2가지 방법으로 안정성 검토를 수행하였다. 검토 결과, 중앙 필라가 텐션 볼트로 적절히 보강된다면 터널 심도가 직경의 5배 이하인 경우에는 적용이 가능하였다.
국가적으로 국토의 효율적 활용과 친환경성 등으로 인해 터널과 같은 지하공간 건설이 필요하다. 친환경적 요소의 중요성을 감안할 때, 산악지에 형성되는 도로건설에 대해 2-아치 및 대단면 터널로 계획되나 경제성, 시공성, 공사기간, 유지관리 등의 문제점을 가지고 있다. 따라서 본 연구에서는 2차로의 국도터널을 기준으로 현장조건과 지반조건을 고려하여 터널별 이격거리와 토피고를 변화시켜 경험식과 수치해석적으로 필라부의 안전성을 평가하였으며, 해석 프로그램으로 유한요소법을 적용한 Plaxis 2D를 활용하여 터널의 최소 필라폭 선정과 전체적인 터널의 거동특성을 분석하였다. 분석결과, Tie-Bolt에 의한 필라보강은 연직하중을 분산시켜 안전적인 근접병렬터널 계획이 가능하며, 터널 필라의 거동은 현장계측 결과와 잘 일치하는 것으로 나타났으며, 지반조건에 따라 터널 필라폭을 축소시킨다면 이전의 터널에 비해 효율적인 터널 활용이 가능하다.
The behaviour of ground movement during the construction of two parallel tunnels in weathered zone and soft rock has been investigated. All the influencing factors for the behaviour of twin tunnel such as tunnel size, ground conditions, tunnel depth, pillar width and initial state of ground stresses were examined The results of FEM nonlinear analysis were compared with some of model test results in weathered zone to verify the numerical method. It was found that minimum interference was obtained in the parallel construction case when the twin tunnel distance (pillar width) is just over the twice of tunnel diameter. Guide line for the interference of twin tunnelling has been introduced for the ground of weathered zone and soft rock.
근래 들어 도심지 주변의 교통난 해소를 위한 터널 건설이 증가하고 있으나 기존 노선과의 선형, 주변 구조물과의 간섭, 용지 매입의 제한 및 매입비 증가 등과 같은 제한적인 요인과 터널예정 부지 주변의 민원 및 환경훼손 최소화 등과 같은 환경적인 요인으로 인해 터널 계획시 많은 어려움을 겪고 있다. 이를 해소하고자 터널간의 거리를 좁게하는 근접병설터널의 사례가 증가하고 있으나 이러한 근접병설터널의 경우 터널간 거리를 충분히 확보하고 있는 일반적인 터널에 비해 안정성 측면에서 불리한 점이 많은데, 특히 좁은 필라부의 강도를 증가시키기 위한 다양한 방법을 적용하고 있으나 필라부의 적정한 거동특성을 반영한 필라부 보강공법은 많지 않은 실정이다. 본 논문에서는 필라부의 적정한 거동특성을 반영한 보강공법을 비교, 분석하고 이를 수치해석을 통해 검증하였다.
Ground vibration generated repeatedly in blasting tunnel excavation sites is known to be one of the major hazards induced by blasting operations. Various studies have been conducted to minimize these hazards, both theoretical and empirical methods using electronic detonator, the deck charge method, the center-cut method among others Among these various existing methods for controlling the ground vibration, in this study, we investigated the cut method. In particular, we analyzed and compared the V-cut method, which is commonly used in tunnel blasting, to the double-drilled parallel method, which has recently been introduced in tunnel excavation site. To understand the rock fragmentation efficiency as well as the ground vibration controllability of the two methods, we performed in-situ field blasting tests with both cut methods at a tunnel excavation site. Additionally, numerical analysis by FLAC3D has been executed for a better understanding of fracture propagation pattern and ground vibration generation by each cut method. Ground vibration levels, by PPVs measured in field blasting tests and PPVs estimated in numerical simulations, showed a lower value in the double-drilled parallel compared with the V-cut method, although the exact values are quite different in field measurement and numerical estimation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.