• Title/Summary/Keyword: parallel construction

Search Result 429, Processing Time 0.023 seconds

Distance between the Parallel Shield tunnel and Application (병렬 쉴드터널의 이격거리와 적용사례)

  • Kwak Chul-Hong;Kim Jae-Young;Kim Dong-Hyun;Lee Du-Hwa;Lee Seung-Bok;Kim Eung-Tae;Shim Jai-Beom
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.225-232
    • /
    • 2005
  • The construction of parallel tunnel by using the shield TBM method was increased recently. Accordingly the application and the propriety of the parallel shield TBM tunnels were studied through domestic and foreign construction cases herein. Also the behavior of tunnel structure and ground was evaluated by a numerical analysis with various ground conditions and the distance between the parallel tunnels. As a result, it was concluded that a deep investigation as well as a ground reinforcement was required with a ratio(L/D) of the distance between the parallel tunnels(L) to tunnel outer diameter(D) less than 0.5 because the Interference phenomenon was expected to occur. And the appropriateness of the application method of parallel shield TBM tunnel was validated through the 2-dimensional numerical analysis simulated the process of excavation after the ground reinforcement in the starting area of the OOO construction site with the ratio(L/D) of 0.35.

  • PDF

Construction of UOWHF: New Parallel Domain Extender with Optimal Key Size (UOWHF 구생방법 : 최적의 키 길이를 가자는 새로운 병렬 도메인 확장기)

  • Wonil Lee;Donghoon Chang
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.14 no.2
    • /
    • pp.57-68
    • /
    • 2004
  • We present a new parallel algorithm for extending the domain of a UOWHF. Our algorithm is based on non-complete l-ary tree and has the same optimal key length expansion as Shoup's which has the most efficient key length expansion known so far. Using the recent result [8], we can also prove that the key length expansion of this algorithm and Shoup's sequential algorithm are the minimum possible for any algorithms in a large class of "natural" domain extending algorithms. But its prallelizability performance is less efficient than complete tree based constructions. However if l is getting larger then the parallelizability of the construction is also getting near to that of complete tree based constructions.tructions.

Grounding Characteristic Analysis of Plate Electrodes

  • Kim, Sung-Sam;Kim, Ju-Chan;Koh, Hee-Seog
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.4
    • /
    • pp.53-60
    • /
    • 2007
  • In this study, an experiment on the efficient construction method of plate electrodes, the influence of electric potential interference in plate electrodes, and building foundations were explored. The experimental result of the electric potential measurement was taken on the basis of the direction of movement and the condition in which the plate electrodes are laid underground in building foundations. It shows that the construction method of laying the plate electrodes vertically exhibits a more efficient reduction of electric potential in a diagonal direction and on an X axis than laying plates horizontally. For plate electrode construction in an area that has uniform conditions, the parallel joint construction method is more effective than a single construction to reduce earth electrical potential and ground resistance. In addition, a straight arrangement performs well in ground efficiency, compared to the parallel arrangement.

Development of Robot for the Mechanized Construction of Underwater Harbor (수중항만공사 기계화 시공을 위한 로봇 개발)

  • Park, K.W.;Kim, T.S.;Chung, J.W.;Kim, Y.H.;Lee, M.K.
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.1781-1786
    • /
    • 2003
  • This research develops a robot as the device which constructs underwater harbour. This construction is to build a breakwater, which is dangerous and difficult. The hydraulic parallel mechanism-typed robot is developed to mechanize the construction by operating of a stoneworker (or diver) through a joystick. The six-dof robot is able to carry 2-3 tons' heavy stone and put it on the surface of breakwater. This paper presents the mechanical design of a miniature robot, its control and application for the breakwater construction.

  • PDF

PARALLEL ALGORITHMS FOR INTEGRATION OF NAVIER-STOKES EQUATIONS BASED ON THE ITERATIVE SPACE-MARCHING METHOD

  • Skurin Leonid I.
    • Journal of computational fluids engineering
    • /
    • v.10 no.1
    • /
    • pp.67-72
    • /
    • 2005
  • This research is based on the iterative space-marching method for incompressible and compressible Navier-Stokes equations[1-4]. A principle of parallel computational schemes construction for steady and unsteady problems is suggested. It is analytically proven that convergence of these schemes is unconditional for incompressible case. When the parallel scheme is used the total volume of computations is the sum of a large number of independent and equal parts. Estimation of the speed-up K shows that K > 1000 in ideal case. First results of using the parallel schemes are presented.

A study on the stability analysis for asymmetry parallel tunnel with rock pillar (암반 필라를 포함한 비대칭 근접 병설터널의 안정성 평가에 관한 연구)

  • Kim, Do-Sik;Kim, Young-Geun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.4
    • /
    • pp.387-401
    • /
    • 2007
  • Recently, because of the restriction of land for construction and interference of adjacent structure, parallel tunnels with small clearance have been planned and constructed in many sites. In this case, the stability of pillar at center part is very important factor to satisfy the stability of tunnel structure under the construction. In this paper, numerical analyses for the asymmetry parallel tunnels with a narrow width of pillar have been carried out to search for the optimum reinforcement measure for rock pillar and verify the stability of tunnel. Rock pillar between each single tunnel is supposed to be under heavy load by rock mass. The analysis of stress state at rock pillar at various cases for construction conditions is required to investigate the structural behaviour of tunnels and stability of the pillar. Strength-stress ratio is calculated based on the failure theory of rock and the safety factor of tunnel is computed with strength reduction technique. Through these numerical results, reasonable reinforcement measures for rock pillar at parallel tunnel were established and recommended.

  • PDF

An Explicit Superconcentrator Construction for Parallel Interconnection Network (병렬 상호 연결망을 위한 초집중기의 구성)

  • Park, Byoung-Soo
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.1
    • /
    • pp.40-48
    • /
    • 1998
  • Linear size expanders have been studied in many fields for the practical use, which make it possible to connect large numbers of device chips in both parallel communication systems and parallel computers. One major limitation on the efficiency of parallel computer designs has been the highly cost of parallel communication between processors and memories. Linear order concentrators can be used to construct theoretically optimal interconnection network schemes. Existing explicitly defined constructions are based on expanders, which have large constant factors, thereby rendering them impractical for reasonable sized networks. For these objectives, we use the more detailed matching points in permutation functions, to find out the bigger expansion constant from an equation, $\mid\Gamma_x\mid\geq[1+d(1-\midX\mid/n)]\midX\mid$. This paper presents an improvement of expansion constant on constructing concentrators using expanders, which realizes the reduction of the size in a superconcentrator by a constant factor. As a result, this paper shows an explicit construction of (n, 5, $1-\sqrt{3/2}$) expander. Thus, superconcentrators with 209n edges can be obtained by applying to the expanders of Gabber and Galil's construction.

  • PDF

System Construction Method of Parallel Operation System constructed with Three Electric Power Converters

  • Ishikura, Keisuke;Inaba, Hiromi;Kishine, Keiji;Nakai, Mitsuki;Ito, Takuma
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.4
    • /
    • pp.451-457
    • /
    • 2014
  • Parallel operation systems have an advantage in that they can be constructed quickly and inexpensively by combining existing electric power converters. However, in this case, there is a peculiar problem in that a cross current flows between the electric power converters. To design a control system more simply and commonalize the core of combination reactors, we reviewed a system construction method for parallel operation systems constructed with three electric power converters.

Construction of Semi-Algebra Low Density Parity Check Codes for Parallel Array Processing (병렬 어레이 프로세싱을 위한 반집합 대수 LDPC 부호의 구성)

  • Lee Kwang-jae;Lee Moon-ho;Lee Dong-min
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.1C
    • /
    • pp.1-8
    • /
    • 2005
  • In this paper, we present a novel LDPC code construction called as semi-algebra low density parity check(LDPC) codes which is one kind of deterministic LDPC code based on dual-diagonal sub-matrix. The constructing method results in a class of high rate LDPC codes. Codes in this class have a large girth and good minimum distances. Furthermore, they can be implemented by simple parallel array architecture using cyclic shift register and perform well with the iterative decoding.

Heating and Cooling System using the Sewage Source Absorption Refrigeration and Heat Pump Cycle (하수열을 이용한 냉난방시스템에 관한 연구)

  • Lee, Yong-Hwa;Shin, Hyun-Joon;Yoon, Hee-Chul;Park, Hyun-Gun
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.4
    • /
    • pp.19-26
    • /
    • 2007
  • This paper concerns the study of absorption refrigeration and heat pump cycle to use sewage. Simulation analysis on the double-effect absorption refrigeration cycle with parallel and two-stage heat pump cycle has been performed. The working fluid is Lithium Bromide and water solution. The absorption refrigeration cycle use sewage as a cooling water for the absorber and condenser, and absorption refrigeration cycle does that as a chilled water for the evaporator of the first stage cycle. And the two-stage cycle consists of coupling double-effect with parallel and single effect cycle so that the first stage absorber and condenser produces heating water to evaporate refrigerant in the evaporator of the second stage. The effects of operating variables such as a absorber temperature on the coefficient of performance have been studied for absorption refrigeration and heat pump cycle.