• Title/Summary/Keyword: owner

Search Result 1,405, Processing Time 0.027 seconds

A concerned party of purification liability for soil pollution (토양오염에 대한 정화책임의 주체)

  • 조은래
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 1999.10a
    • /
    • pp.53-56
    • /
    • 1999
  • The concerned party of purification liability in a soil pollution is an owner or occupant of a contaminated site. But when we don't appoint the polluter or he can't do a cleanup, municipal put in effect the purification. In such a case, another parties who are related to the contamination ought to the liability. The province of responsible parties, therefore, is required to extend to an owner or operator of a facility, a carrier and lender

  • PDF

Interaction Analysis between Construction Business Indicators and Business Performance Indicators of Specialty Contractors Depending on Operation Types (경영형태에 따른 전문건설업체의 건설경기지표와 경영성과지표의 상관성 분석)

  • Kim, Nam-Sik;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.193-202
    • /
    • 2015
  • This study suggests strategies business strategies of specialty contractors by interaction analysis between business performance indicators and construction business indicators depending on operation types. To analyzing this research, a database was analyze for construction orders and business performance indicators for specialty contractors with KRW 7 billion from 1997 to 2010 yr. For organized management oriented specialty contractors, the amount of construction orders is directly affecting the corporate stability and therefore decreasing orders can negatively affect the owner's equity ratio. However, considering that the turnover ratio of total liabilities and net worth is affecting the owner's equity, an asset management plan needs to be established in a way to increase sales to the owner's equity secured with increase in construction orders. For a single leader oriented specialty contractors, the owner's equity ratio is also significantly affected by change in the amount of construction orders and some countermeasure is required. But, as liability ratio is affecting the amount of construction orders, some sort of countermeasures to decrease liability ratio is required.

Owner-driven Lean Construction based on Participants' Needs Analysis (건설주체간의 니즈분석을 통한 발주자 참여형 린 건설 연구)

  • Lee, Kang-Woo;Ryu, Chung-Gyu;Park, Hee-Dae;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.222-226
    • /
    • 2008
  • The construction industry has remained stagnant for a long time. So many researchers have wanted to solve this problem not only focusing on enhancement of construction process, but also introducing the culture of cooperation. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research propose a framework for implementation of LPS conducted by owner focused on construction stage and introduce optimal owner participation model in plant construction, based on needs analysis for construction participants. Furthermore, this research introduce a modified needs analysis, so called IPBA(Importance-Performance-Betterment Analysis), and an advanced LPS procedure which add the needs analysis during pre-LPS and(or) main LPS stages.

  • PDF

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.

A Study on Standard Hanok Design for Rural (농촌 한옥 표준설계도 연구)

  • Kim, Jae-Ung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.18 no.1
    • /
    • pp.19-28
    • /
    • 2016
  • This research aimed to suggest a standard design that reflects Hanok design tendency, and present a selective design that can fulfill a building owner's intention beyond the simple function of building permit or report. In addition, this research attempted to become a standard by establishing a criterion in calculating the measurements of section design or primary framework members, in order to be a guideline for designing Hanok in different sizes and forms. The results are as follows. The building area of Hanok standard design was set to be below $85m^2$, with a straight type of $83.16m^2$ and an L-shape of $84.24m^2$. By dividing the plane into a straight type and L-shape, two straight types were suggested: 'general type' and 'large living room type.' The upper floor space, along with the main room and small room, was proposed as an option to be changed into a room where an underfloor heating is installed depending on the building owner's intention. In addition, a criterion for side design and calculation of framework measurements was suggested and applied, while a five-girder design without high pillars was suggested for material-assembling structure. Two types of pillars-circumference and square cylinder-were proposed for the building owner to choose from, and a pointed beam house and ikgong(orthogonally-projected bracket) house were suggested for pojak bracket structure so either of them could be chosen according to the building owner's taste and economic condition. Finally, the sectional size of main materials were divided according to the form of pojak bracket structure to be proposed.

A Study on the improvement of house quality : Case study of Public rental house in Urban Renewal (재개발임대아파트의 주거수준 향상을 위한 제도개선방안 연구)

  • Ko, Duk-Kyun;Kim, Jin-Soo;Kim, In-Ha
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2004.11a
    • /
    • pp.413-417
    • /
    • 2004
  • The important goal of urban renewal is not to reform only Physical environment but to improve people' life quality. people who have been lived in urban renewal area are grouped to owner and tenant. owner of land or house has substituent right but tenant has only house-moving money or rental house by urban renewal. But rental house condition is not good to tenant because tenant has large family, low-income and low grade and it is essential to provide rental house for low-income class and it is worth to analyze tenant house problem The purpose of this study is to analyze the problems of public rental house and to presents solutions. The study was done in following process. First, the literatures on this subject were investigated to seek the problems of public rental house. Second, Survey were done on the staff, who works in the cooperative housing redevelopment and whose jobs are officer, consultant, real estate introducer and designer, to seek problems and solution of public rntal house. survey which is made by three group. one group is made by people who already lived in tenant APT, second group is made by people who are waiting for moving in tenant APT. Third group is made by specialist who has many experience-more than 3years- to urban renewal. Third, the Correlation Analysis was used to analyze the relation between the Area and dwelling satisfaction. Fourth, tenant policy' altenative is presented to solve tenant APT' problem which is analyzed by this study The results are as follows : First, tenant APT' size Which is regulated to 30-$45m^{2}$ is enlarged to more than $45m^{2}$ because tenant family is made up averagely of 4.8 persons. Second, tenant APT' rental cost is reduced to 100 thousand won. Third tenant APT' arrangement is divided from owner because tenant and owner want to live in group by group. Fourth, tenant house type is changed to various house type because tenant is not familiar with APT

  • PDF

An Analysis of the Effects of Knowledge Complementarities on the Performance of Information System Audit : A Perspective of the Resident Audit in the Project Office (지식상호보완성이 정보시스템 감리 성과에 미치는 영향 : 상주감리 관점에서)

  • Jang, Ji Yeon;Kim, Choong Nyoung
    • Journal of Information Technology Services
    • /
    • v.15 no.1
    • /
    • pp.113-129
    • /
    • 2016
  • Recently, as Information System projects tend to be more complex, the importance of Information System Audit increases. In the same context, the need for the resident IS Audit also increases, which is supposed to deal with the possible risks and urgent issues by providing the appropriate support and timely coordination during IS project. Basically, for the effective IS Audit, the IS audit team members should be able to understand such a business context as work characteristics, business knowledge, goals, and culture of the organization. The audit team members should also be able to share the various knowledge of Information Technology and audit procedure with the owner of the project. Especially, for the resident audit, it is more important to fill the gaps in expertise between project owner and audit team. However, any studies on the need of common knowledge base (knowledge complementarities) in the IS audit have not been done so far. The purpose of this study is to analyze whether the knowledge complementarity based on inter-organizational communication between the project owner and audit team members makes an effect on the fidelity and performance of IS audit. In order to do this, the relationship among inter-organizational communication and knowledge complementarity, the fidelity of IS audit service, and performance of IS audit has been analyzed, using Structural Equation Model. The result shows that all the relationship is significant, which means that knowledge complementarity between the two different interest groups should be an effective factor on the fidelity and performance of IS audit. This result implies that, for better quality of IS Audit service, how to acquire the knowledge complementarity between the project owner and Audit team should be considered seriously as well as systematically in the process of IS Audit.

The Research About Suitability of The Cost of Work According to The Alteration of Design Literature (설계도서 변경에 의한 실 공사비의 책정에 관한 연구)

  • Im, Chil-Soon;Lee, Gyu-Chel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

A Study of the List for CM Product Measure Check-List through 4 Way View;Focusing on Owner, CMr, Designer, Constructor (4자관점을 통한 CM의 성과측정 체크리스트 항목에 관한 연구)

  • Ahn, Eun-Jin;Kim, Ju-Hyung;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.509-512
    • /
    • 2007
  • In Domestic, the beginning of CM system was at December 1996 by 'Construction Industry fundamental law'. Today the needs of CM is more and more during 10 years. Although the time of CM's induction and high-quality human resources are insufficiency, various studies and developments's level through theoritical base and academic level is good which are compared by developed countries's. But still now the effort of CM product measure part, especially public sector is not enough. Besides, the existing check-list is for project owner so it needs to make up for balanced view as organized 4way-view of owner, CMr, designer, constructor. On this study, produce the list of check-list and then weight of each list by view of owner, CMr, designer, constructor. The completec check-list will be useful for CM product measure objectively .

  • PDF

A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.