• Title/Summary/Keyword: operation time

Search Result 11,206, Processing Time 0.051 seconds

A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

Event Based Tele-Operation with Variable Holding Time (가변 지속시간을 갖는 이벤트 기반 원격제어)

  • 박준영;박장현
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.19 no.12
    • /
    • pp.70-77
    • /
    • 2002
  • Necessity of the tole-operation has been increased in many fields. Since the Internet is inexpensive and available all over the world, it is a strong candidate for the transmission media of the tole-operation. However, the Internet has random time delays that may cause instability in the system especially if the tole -operation is bilateral. In the past few years many attempts have been made to overcome the random time delay, So far, they are still insufficient in terms of performance. The ‘Variable holding time’ is introduced to improve the performance of the ‘Event based tole-operation’ which controls a system with a non-time action reference. By holding each event for proper time, the system can quickly respond and be stabilized. The proper holding time should be selected based on the characteristics of the task that the system performs. The factors that reflect those characteristics are investigated. The fuzzy logic is employed to obtain the proper holding time for each event while the tole-operation system is in operation. The experimental results presented in this paper verify effectiveness of the proposed method.

Train Regulation by the Advanced Algorithm for Subway (개선된 알고리즘에 의한 지하철 운행간격 제어)

  • Park, Hong-Kyu;Shim, Won-Sup;Hong, Soon-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.330-333
    • /
    • 2002
  • Even if the train of subway starts in a certain interval from the origin according to the operation plan. as the number of passenger gets increased during operation. the boarding and getting-off time will increase, and the temporary breakdown happens to the system of train during operation, causing the delay from the operation plan. this leads to the vicious circle of train operation. making the interval of train operation irregular in downtown especially. To solve this problem, we propose the method of advanced algorithm by the actual data relating to the train operation including operation time required between stations, distance between stations. capability of train, and the dwelling time, location and distance between the preceding train and next one. The central train control system adjusts the dwelling time at each station in order to recover the delayed time, and increase the operation speed at the each station. As control algorithm is applied the dwelling time and to increase the speed, the train maintains certain interval after certain amount of time passes.

  • PDF

Facility Location Planning with Realistic Operation Times in Supply Chain (공급사슬에서 실제 시설물 운영시간을 고려한 시설배치계획에 관한 연구)

  • Lee Sang Heon;Kim Sook Han
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.2
    • /
    • pp.143-156
    • /
    • 2005
  • Facility location planning (FLP) problem is the strategic level planning in supply chain. The FLP is significantly affected by the operation time of each facility. In most of the FLP researches, operation time of facility has been treated as a fixed value. However, the operation time is not a static factor in real situations and the fixed operation time may lead unrealistic FLP. In this paper, a mixed integer programming (MIP) model is proposed for solving the 3-stage FLP problem and operation times are adjusted by the results from the simulation model and an iterative approach combining the analytic model and simulation model is proposed to obtain more realistic operation plans for FLP problems.

Local-Generator-Based Virtual Power Plant Operation Algorithm Considering Operation Time

  • Park, Sung-Won;Park, Yong-Gi;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.6
    • /
    • pp.2127-2137
    • /
    • 2017
  • A virtual power plant (VPP) is a system that virtually integrates power resources based on the VPP participating customer (VPC) unit and operates as a power plant. When VPP operators manage resources to maximize their benefits, load reduction instructions may focus on more responsive VPCs, or those producing high profitability, by using VPC resources with high operation efficiency. VPCs may thus encounter imbalance problems during operation. This imbalance in operation time would bring more participation for some VPCs, causing potential degradation of their resources. Such an operation strategy would be not preferable for VPP operators in managing the relationship with VPCs. This issue impedes both continual VPC participation and economical and reliable VPP operation in the long term. An operation algorithm is therefore proposed that considers the operation time of VPC generators for mandatory reduction of power resource consumption. The algorithm is based on constraints of daily and annual operation times when VPP operators of local generators perform capacity-market power transactions. The algorithm maximizes the operator benefit through VPP operations. The algorithm implements a penalty parameter for imbalances in operation times spent by VPC generators in fulfilling their obligations. An evaluation was conducted on VPP operational effects by applying the algorithm to the Korean power market.

Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction (초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델)

  • Nam, Chulu;Kwon, Jaebeom;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

A Study on the Data Visualization for Real Time Power System Operation (실시간 전력계통 운영을 위한 데이터 시각화에 관한 연구)

  • Chog, Yoon-Sung;Joung, Jinyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1361-1367
    • /
    • 2013
  • This paper describes and suggests the data visualization for real time power system operation based on energy management system. Because real time power system operation performs analysis of the vast amount of on-line data, the operators need intuitive data visualization to find out useful information in the big data. Especially, in emergency situation, the data visualization is able to assist the operators in handling the crisis quickly and efficiently. Therefore, this paper aims to improve displays of output of real time power system operation by visualizing on-line big data. Through this study, we can develop improved visualization technique for real time power system operation, which has highly readable displays of output and intuitive information.

Standard Operation Time Estimation Using Features in Mold Die Manufacturing (특징형상을 사용한 사출금형 표준 가공공수계산)

  • 이충수;노형민
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.1
    • /
    • pp.223-231
    • /
    • 1994
  • When manufacturing mold dies, an operation sheet is required for each part of the mold dies. The consistent estimation of standard operation time in the operation sheet is difficult, because the estimation is mainly based on subjective judgement. In order to resolve it, concept of feature is introduced in this study. For CAD/CAPP integration, feature technology is being implemented to represent geometrical and technological information of part drawings. A feature database has already been designed, and then used to generate data for process and operation planning modules. Related to this former research, standard operation time is calculated using the feature information and tables used in a real factory.

A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting (터널발파시 실제 작업시간과 품셈의 비교 분석)

  • Kim, Yang-Kyun;Kim, Hyung-Mok
    • Explosives and Blasting
    • /
    • v.33 no.3
    • /
    • pp.14-20
    • /
    • 2015
  • Tunnel blasting that plays the most important role in the construction of a drill & blast tunnel, shows a big difference in operation time according to various factors such as rock mass quality, tunnel dimension, machine performance, and the skill level of tunnel crews. This paper analyzes the differences between the time calculated by the standard of estimate and actual operation time based upon field investigations on blasting operation time in three tunnels of Korea. The result shows that actual blasting time is generally about 8%~16% less than the standard of estimate in cases that normal operations are performed. If the time delayed by unforeseen situations is included, however, it is presumed that the number of cases that actual operation time exceeds the standard of estimate are considerable. This study aims to help make a judgement over the appropriacy of the standard of estimate through continuous investigations on actual operation time, as well as improve the productivity of tunnel excavation.

Electrokinetic Restoration of Saline Agricultural Land (염류집적 농경지의 전기동력학적 정화)

  • Jo, Sung-Ung;Kim, Do-Hyung;Yang, Jung-Seok;Chung, Keun-Yook;Baek, Ki-Tae
    • Journal of Soil and Groundwater Environment
    • /
    • v.17 no.4
    • /
    • pp.19-26
    • /
    • 2012
  • The influence of operation time on electrokinetic restoration was investigated to remove salts from sulfate-accumulated greenhouse soil. Operation time is directly related to the process cost, therefore, we determined the relationship between operation time and removal of salts. Nitrate and sodium were removed almost completely within 2 weeks, chloride and calcium was removed in proportion to the operation time. Sulfate was accumulated at the center of anode and cathode. The soil electrical conductivity (EC), an indicator for soil salinity, showed similar shape with the residual sulfate after electrokinetic treatment. The soil EC was not changed after 2 weeks, however, the energy consumption increased with operation time. Based on the experimental results, most salts except sulfate were removed within 2 weeks, but sulfate was not removed during same time period. For the further removal of sulfate, longer operation time is in need.