• Title/Summary/Keyword: operation test

Search Result 5,241, Processing Time 0.033 seconds

Development of expressway mode (고속도로 주행 모우드의 개발연구)

  • Park, Sun
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.6 no.1
    • /
    • pp.63-70
    • /
    • 1984
  • The KIER expressway mode was constructed from actual speed-versus-time traces generated by an instrumented test car driven a variety of expressways. This mode reflects the correct proportion of operation on each of the six expressways and preserves the non-steady-state characteristics of real driving. The average speed of the mode is 79.43 km/h and the mode length is 16.22 km.

  • PDF

Operation test case for integrated CCR (일체형 CCR에 대한 동작 실험 사례)

  • Lee, Gi-Min
    • 한국항공운항학회:학술대회논문집
    • /
    • 2015.11a
    • /
    • pp.175-178
    • /
    • 2015
  • A-SMGCS(Advanced Surface Movement Guidance and Control system)의 ILCMS(Individual Light Control&Monitoring System) 고도화의 목표를 달성하기 위한 일체형 CCR(CONSTANT CURRENT REGULATOR)을 제작하고, 개발되어진 LCU(LOCAL CONTROL UNIT)모듈 및 LK CCR FILTER가 일체형 CCR의 실제 동작에 끼치는 영향과 일체형 CCR의 동작 상태를 실험을 통해 결과를 표현 하였다.

  • PDF

Flight Test Safety Risk Assessment and Mitigation (비행시험 안전 리스크 평가 및 완화 연구)

  • Kim, Mu-Geun;Yoo, Beong-Seon;Han, Jeongho;Kang, Ja-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.6
    • /
    • pp.537-544
    • /
    • 2018
  • A national comprehensive aviation test center is being constructed for the purpose of flight tests for development and modification of aircraft or flight inspections for the development of navaids. Flight testing is a high-risk task, so strict risk management processes are required prior to operation. In addition, since the flight test center is subject to the airdrome regulations under the current law, the introduction of the safety management system will enhance safety as usual in ordinary airports. The establishment of a safety management system based on ICAO criteria is an optimal means of ensuring safe and effective operation of the test center and may mitigate the risks that may arise during flight testing. This paper focuses on risk assessment and mitigation required for safety management at the flight test center. We conducted risk assessments on the flight hazards identified in the previous study. Then the high risk group of hazards were selected and risk mitigation techniques such as avoidance, reduction, acceptance, and control were applied.

Generation of the Input Profile for Fatigue Vibration Testing in MAST System (자동차부품(시트,도어) 6축 진동 재현을 위한 가진 프로파일 생성 기법)

  • Kim, Chan-Jung;Beak, Gyoung-Won;Lee, Bong-Hyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.413-418
    • /
    • 2005
  • Vibration test using the MAST(Multi Axial Simulation Table) is more reliable test than conventional testing process focused on one directional vibration test. The former test could be possible with a advanced control algorithm and hardware supports so that most of the operation is automatically conducted by MAST system itself except the input information that is derived from the measured data. That means the reliability of the vibration test is highly depended on the input profile than any other cases before. In this paper, the optimal algorithm based on energy method is introduced so that the best combination of candidated input PSD data could be constructed. The optimal algorithm renders time information so that the vibration fatigue test is completely possible for any measured signals one wants. The real road test is conducted in short intervals containing some rough roads and the candidated input PSD is obtained from the extra road in proving ground. The testing is targeted for the electronically operated door and seat.

  • PDF

A Basic Study on Accelerated Life Test Method and Device of DSA (Dimensionally Stable Anode) Electrode (촉매성 산화물 전극 (DSA, Dimensionally Stable Anode)의 가속수명 테스트 방법과 장치에 관한 기초 연구)

  • Kim, Dong-Seog;Park, Young-Seek
    • Journal of Environmental Science International
    • /
    • v.27 no.6
    • /
    • pp.467-475
    • /
    • 2018
  • The lifetime of the electrode is one of the most important factors on the stability of the electrode. Since the lifetime of the DSA (Dimensionally stable anode) electrode is long, an accelerated lifetime test is required to reduce the test time. Beacuse there is no basis or standard method for accelerated lifetime testing, many researchers use different methods. Therefore, there is a need for basis and methods for accelerated lifetime testing that other researchers can follow. We designed a reactor system for accelerated lifetime testing and planned specific methods. Reactor system was circulating batch reactor. Reactor volume and cooling water tank were 12.5 L and 100 L, respectively. Electrode size was $2cm{\times}3cm$ (real electrolysis area, $5cm^2$). In order to maintain the harsh conditions, accelerated lifetime test was carried out in a high current density ($0.6A/cm^2$) and low electrolyte concentration (NaCl, 0.068 mol/L). Maintaining a constant temperature was an important operation parameter for exact accelerated lifetime test. As the accelerated lifetime test progressed, the active component of electrode surface was consumed and desorption occurred. At the point of 5 V rise, corrosion of the surface of the base material(titanium) also started.

A Parallel Test Structure for eDRAM-based Tightly Coupled Memory in SoCs (시스템 온 칩 내 eDRAM을 사용한 Tightly Coupled Memory의 병렬 테스트 구조)

  • Kook, In-Sung;Lee, Jae-Min
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.4 no.3
    • /
    • pp.209-216
    • /
    • 2011
  • Recently the design of SoCs(System-on-Chips) in which TCM is embedded for high speed operation increases rapidly. In this paper, a parallel test structure for eDRAM-based TCM embedded in SoCs is proposed. In the presented technique, the MUT (Memory Under Test) is changed to parallel structure and it increases testability of MUT with boundary scan chains. The eDRAM is designed in structure for parallel test so that it can be tested for each modules. Dynamic test can be performed based on input-output data. The proposed techniques are verified their performance by circuits simulation.

Flow Network Analysis for the Flow Control of a Main Cooling Water System in the HANARO Fuel Test Loop (하나로 핵연료 시험 루프 주냉각수 계통의 유량 제어에 대한 유동 해석)

  • Park, Young-Chul;Lee, Yong-Sub;Chi, Dae-Yong
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.5
    • /
    • pp.7-12
    • /
    • 2009
  • A nuclear fuel test loop(after below, FTL) is installed in the IRI of an irradiation hole in HANARO for testing the neutron irradiation characteristics and thermo hydraulic characteristics of a fuel loaded in a light water power reactor or a heavy water power reactor. There is an in-pile section(IPS) and an out-pile section(OPS) in this test loop. When HANARO is operated normally, the fuel loaded into the IPS has a nuclear reaction heat generated by a neutron irradiation. To remove the generated heat and to maintain the operation conditions of the test fuel, a main cooling water system(MCWS) is installed in the OPS of the FTL. The MCWS is composed of a main cooler, a pressurizer, two circulation pumps, a main heater, an interconnection pipe line and instruments. The interconnection pipeline is a closed loop which is connected to an inlet and an outlet of the IPS respectively. The MCWS is under a cold function test during a start-up period. This paper describes the system flow network analysis results of the flow control of a main cooling water system in the HANARO fuel test loop. It was confirmed through the results that the flow was met the system design requirements.

Preliminary Design of Test Facility for 75-tonf-Class Liquid Rocket Engine Combustor (75톤급 액체로켓엔진 연소기 시험설비 기본설계)

  • Lim, Byoung-Jik;Seo, Seong-Hyeon;Kim, Mun-Ki;Kang, Dong-Hyuk;Han, Yeong-Min;Choi, Hwan-Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.14 no.5
    • /
    • pp.84-91
    • /
    • 2010
  • For the successful development of 75-tonf-class liquid rocket engine, a plenty of tests on each engine component have to be performed and this is equally true for a combustor. However the test facility which is in operation at Korea Aerospace Research Institute lacks its capacity to perform fire tests of a 75 tonf class combustor at its nominal thrust. Since the test facility has to be ready prior to the start of development tests, it is very urgent to establish the test facility. The preliminary design of a test facility for a 75 tonf class combustor which was performed according to such a necessity is described in the paper.