• Title/Summary/Keyword: operation test

Search Result 5,241, Processing Time 0.036 seconds

The Optimal Scheduling and Operational characteristics on Battery Energy Storage System (전지전력저장설비의 최적운용 및 운전특성에 관한 연구)

  • Song, Kil-Yeong;Oh, Kwang-Hae;Kim, Yong-Ha;Rho, Dae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.102-105
    • /
    • 1993
  • The objective of this study is to solve the operation scheduling problem of plural battery energy storage systems (BESS), and to find useful intonation from its result. Unlike conventional energy storage system, BESS has on hardware characteristics such as high efficiency, fast-acting response and operational loss. Considering rate constraints of thermal unit power as well as hardware characteristics of BESS, the operation scheduling has an intricated problem. In order to solve this optimization problem, we use successive approximations dynamic programming. In two types of operation, the proposed algorithm is applied to test system. one is daily optimal operation, the other weekly optimal operation.

  • PDF

The System Design and Demonstration for Autonomous Microgrid Operation

  • Jyung, Tae-Young;Jeong, Ki-Seok;Baek, Young-Sik;Kim, Heung-Geun;Seo, Gyu-Seok
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.2
    • /
    • pp.171-177
    • /
    • 2012
  • The autonomous microgrid is a system that is autonomously operated depending on the grid and internal load condition, without the operator's intervention. In this study, a control algorithm for the microsource and an operation algorithm for the microgrid are proposed to realize the autonomous microgrid system. In addition, a microgrid operation system based on the operation algorithm is proposed. The electromagnetic transient program is used by the proposed microsource control algorithm for simulation, and the validity of the algorithm is verified. The proposed operation system is verified based on a case study using a simulator and test devices.

Development and Simulation Verification of Operation System for Mobile ESS Test Equipment (ESS 이동형 시험장비용 운영시스템의 개발과 모의검증)

  • Shin, Je-Seok;Han, Hyun-Gyu;Kim, Jin-Tae;Lee, Seung-Min;Park, Chan-Wook;Lim, Geon-Pyo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.168-174
    • /
    • 2018
  • The performance test for 376MW ESS for frequency regulation currently operating in 13 substations is conducted based on the test procedure in the first and second steps. In the first step, components of ESS is moved to the certification authority where the test equipment is located in order to be proceeded with the test. In the second step, the performance test is conducted manually for the ESS equipments installed on site using the movable measurement equipment, and thus it can only be performed on some limited test items and requires a lot of time and manpower. Therefore, mobile test equipment for ESS(MOTES) is being developed that can perform automatically more test items for ESS in the field using the MOTES, and reduce manpower and time. To do this, an algorithm and a prototype of the operating system(MOS) are also being developed that can control MOTES automatically. In this paper, a development of the MOS prototype is introduced and then a simulation is performed to verify the prototype and its algorithm before the field demonstration.

Job Analysis for the Improvement of criteria for preparation of Qualification test of Computer Operation Engineer (직무분석을 통한 컴퓨터 운용사 자격검정 출제기준 개선 연구)

  • Seo, Joon-Ho;Park, Jong-Sung
    • Journal of Engineering Education Research
    • /
    • v.9 no.3
    • /
    • pp.22-36
    • /
    • 2006
  • This paper is aimed to design for qualification structure and criteria for preparation of qualification test of computer operation engineer. In this study, a DACUM(Development A curriculum) method job analysis to extract contents such as task range, grades or ranks, eligibility, examination standards, selection criteria of examination questions, examination methods, etc was done by an job analysis committee composed of 7 specialists in the industry and academia. In the first place, this report presents job analysis models by procedures for developing selection criteria of examination questions of computer operation engineer. The first step is preparation for job analysis(data research, interviews and selection of experts), the second step the establishment of job models(first expert council and site study), the third step the drawn-out of knowledge, skills, and tools(the second expert council and site study), the fourth step the selection of courses and subjects(the third expert council), the fifth step the establishment of guidelines for making questions(the third site study).

High-level Modeling and Test Generation With VHDL for Sequential Circuits (상위레벨에서의 VHDL에 의한 순차회로 모델링과 테스트생성)

  • Lee, Jae-Min;Lee, Jong-Han
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.5
    • /
    • pp.1346-1353
    • /
    • 1996
  • In this paper, we propose a modeling method for the flip-flops and test generation algorithms to detect the faults in the sequential circuits using VHDL in the high-level design environment. RS, JK, D and T flip-flops are modeled using data flow types. The sequence of micro-operation which is the basic structure of a chip-level leads to a control point where varnishing occurs to one of two micro- operation sequence. In order to model the fault of one micro-operation(FMOP) that perturb another micro-operation effectively, the concept of goal trees and some heuristic rules are used. Given a faulty FMOP or fault of control point (FCON), a test pattern is generated by fault sensitization, path sensitization and determination of the imput combinations that will justify the path sensitization. The fault models are restricted to the data flow model in the ARCHITECTURE statement of VHDL. The proposed algorithm is implemented in the C language and its efficiency is confirmed by some examples.

  • PDF

An Analysis on Situation of Broadcasting and Telecommunication Equipment EMC Test Market and Way of Government Intervention (방송통신기자재 전자파 시험 시장의 현황 분석 및 정부 개입 방안)

  • Lee, Yong-Kyu;Kim, Young-Rae
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.24 no.8
    • /
    • pp.753-762
    • /
    • 2013
  • This paper forecast that, if the EMC test market for broadcasting and communication materials and equipment reaches a saturated state, such will give rise to adverse effects such as capture phenomenon, rent seeking phenomenon, and stiff test price competition; this in turn will eventually wield a negative impact on our society. Thus, to determine the saturation level of EMC test markets, the size of test markets and test capabilities of the designated laboratories were surveyed. As a result, the operation rate of equipment in the EMC test markets was revealed to be 78 %, suggesting market saturation. Moreover, the wireless, wire, and SAR equipment operation rates reached 65 %, 3 %, and 10 %, respectively, suggesting market saturation. Thus, maintaining the strictness of testing requires limiting the designation of new test laboratories; in light of practices and implementation of laws, however, the relevant administrative agency has difficulty rejecting applications for the designation of laboratories.

A Study on the Establishment of Concept and Selection criteria of Intelligent Security Technology Test-bed based on Spatial Information (공간정보 기반 지능형 방범 실증지구 개념 정립 및 선정기준에 관한 연구)

  • Shin, JuHo;Han, SunHee;Lee, JaeYong
    • Spatial Information Research
    • /
    • v.22 no.6
    • /
    • pp.45-54
    • /
    • 2014
  • Establishment of safety net for the socially disadvantaged attracts large attention because of the recent crime increasing against vulnerable groups. For the successful establishment of social safety net, the test-bed for evaluation and realization of crime-related research results is required. However, previous R&D test-bed projects such as The Korean Land Specialization Program or U-Eco City project remains only to the stage of verification. Therefore, there are limitedness for realization of result technologies or sustainable operation & management of test-bed after projects finished. So, sustainable operation & management system and guideline of test-bed are necessary. Therefore, this study reviews the strengths and weaknesses of existing test-bed cases and intelligent security researches. After reviewing, the concept of a Intelligent Security Test-bed is established and appropriate test-bed selection criteria is also suggested. Based on objective criteria, selected test-bed can achieve sustainable management even after finishing the project and contribute the construction of standard model for citizen's safety.

Verification of Hi9h Impedance Fault Relay through Low Voltage Power System Implementation (저압모의계통 구성을 통한 고저항지락사고 검출용 계전기의 실계통 적응성 검증)

  • Hong, Sun-Chun;Jang, Byung-Tae;Yoo, Heung-Jun
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1437-1439
    • /
    • 1999
  • This paper describes test method though low voltage power system implementation for high impedance fault relay test before its operation in real power system. Through this test, relay tested its function and algorithm. In this paper, we will provides test method using low voltage power system and its results.

  • PDF

A Study for Running Test Result of Train Automatic Driving Control by ATC/ATO/TWC System (차상 ATC/ATO/TWC 시스템의 열차 자동운전 구현의 현차시험 결과 고찰)

  • 강리택;이종성;김경식;박계서
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.578-585
    • /
    • 2000
  • ATC/ATO/TWC System is the used for the train operation instead of drivels. It is interfaced with train, train equipment, wayside facilities. In this paper described configuration signaling system, construction of signaling system software and structure of system safety. This paper describes the method of performing automatic driving by ATC/ATO/TWC. Also, reported test result for mainline static test and mainline running test.

  • PDF

Specification-based Analog and Mixed-signal Circuits Test with Minimal Built-In Hardware Overhead (내장 하드웨어 오버헤드를 최소화한 Specification 기반의 아날로그 및 혼합신호 회로 테스트)

  • Lee, Jae-Min
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.633-634
    • /
    • 2006
  • A new specification-based analog and mixed-signal test technique using high performance current sensors is proposed. The proposed technique using current sensors built in external ATE has little hardware overhead in circuit under test and high testability without time consuming operation of test point placement algorithm.

  • PDF