• Title/Summary/Keyword: operation test

Search Result 5,241, Processing Time 0.029 seconds

The Effect of Learning Cycle Model in Solution Concept on the Cognitive Development for Primary Student (용액 개념의 순환학습이 초등학생의 인지수준발달에 미치는 영향)

  • 최영주;김세경;고영신
    • Journal of Korean Elementary Science Education
    • /
    • v.23 no.4
    • /
    • pp.273-278
    • /
    • 2004
  • According to Piaget, children aged 11 are in the middle of concrete operation period and formal operation period. So, it is necessary to adopt the Learning Cycle Model (LCM) which helps students improve their cognitive development. After determining the test for the Science Concept of Matter (SCOM), the experimental group showed higher average than the comparative group in the post-test. In the sound understanding, the experimental group showed higher ratio than the comparative group. And in the ratio of imperfect, wrong understanding and no response, the experimental group was lower than the comparative group. On the questions that were needed the complicated inquiry, many students of both groups still couldn't find the fundamental cause. In forming the scientific conceptualization, there was a meaningful difference (p < .001) after post-test Analysis of Covariance (ANCOVA) with pre-test result. After determining the test for the Test Inquiry Science Process (TISP), the experimental group showed higher average than the comparative group in the post-test. In the category of basic inquiry process which is needed in concrete operation, there was a meaningful difference (p < .05). In the category of unified inquiry process which is needed in formal operation, they showed no meaningful difference (p > .05). Therefore, applying the LCM to the chapter of 'Solution and Dissolving' is more effective on improving the scientific conceptualization and on helping the concrete operation abilities than the teacher centered learning.

  • PDF

Verification of System using Master-Slave Structure (Master-Slave 기법을 적용한 System Operation의 동작 검증)

  • Kim, In-Soo;Min, Hyoung-Bok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.1
    • /
    • pp.199-202
    • /
    • 2009
  • Scan design is currently the most widely used structured Design For Testability approach. In scan design, all storage elements are replaced with scan cells, which are then configured as one or more shift registers(also called scan chains) during the shift operation. As a result, all inputs to the combinational logic, including those driven by scan cells, can be controlled and all outputs from the combinational logic, including those driving scan cells, can be observed. The scan inserted design, called scan design, is operated in three modes: normal mode, shift mode, and capture mode. Circuit operations with associated clock cycles conducted in these three modes are referred to as normal operation, shift operation, and capture operation, respectively. In spite of these, scan design methodology has defects. They are power dissipation problem and test time during test application. We propose a new methodology about scan shift clock operation and present low power scan design and short test time.

Development of an Unmanned Test System Based on Forklift for Mast Operation Durability (지게차 마스트 작동내구를 위한 실차 기반 무인시험장치 개발)

  • Cho, Jae-Hong;Na, Seon-Jun;Kim, Min-Seok;Park, Myeong-Kwan
    • Journal of Drive and Control
    • /
    • v.19 no.4
    • /
    • pp.70-76
    • /
    • 2022
  • In this paper, we develops an unmanned test system for the purpose of realizing an actual forklift-based test-bed for the operation durability of the forklift mast. First, two robot actuators were applied to the lever to replace lever manipulation of the operator. For detecting the height of the fork and the tilt angle of the mast, the laser displacement sensor and the inclinometer were installed to the forklift. Next, the embedded control system was used to control the robot actuator with reference to test mode. Experimental evaluation verified that developed test system was effective and practical for the viewpoint of the repeatability of the test mode.

Physical-Aware Approaches for Speeding Up Scan Shift Operations in SoCs

  • Lee, Taehee;Chang, Ik Joon;Lee, Chilgee;Yang, Joon-Sung
    • ETRI Journal
    • /
    • v.38 no.3
    • /
    • pp.479-486
    • /
    • 2016
  • System-on-chip (SoC) designs have a number of flip-flops; the more flip-flops an SoC has, the longer the associated scan test application time will be. A scan shift operation accounts for a significant portion of a scan test application time. This paper presents physical-aware approaches for speeding up scan shift operations in SoCs. To improve the speed of a scan shift operation, we propose a layout-aware flip-flop insertion and scan shift operation-aware physical implementation procedure. The proposed combined method of insertion and procedure effectively improves the speed of a scan shift operation. Static timing analyses of state-of-the-art SoC designs show that the proposed approaches help increase the speeds of scan shift operations by up to 4.1 times that reached under a conventional method. The faster scan shift operation speeds help to shorten scan test application times, thus reducing test costs.

Operation Simulation of a Microturbine Based on Test Data (시험 데이터를 지반으로 한 마이크로터빈 운전 시뮬레이션)

  • Lee, Jong-Joon;Yoon, Jae-Eun;Kim, Tong-Seop
    • The KSFM Journal of Fluid Machinery
    • /
    • v.9 no.6 s.39
    • /
    • pp.22-28
    • /
    • 2006
  • Operation of a microturbine was simulated on the basis of component characteristic parameters obtained from performance test. Characteristic parameters, such as compressor and turbine efficiencies, recuperator effectiveness as well as turbine inlet temperature, were obtained for a wide operation range. Component characteristics including performance maps and characteristic curves were generated using measured data. Based on the component characteristics, a simulation program was constructed and operation of the microturbine was simulated, and the simulated results were compared with the measured data to verify the program. Also, influence of variation in the power control scheme on the operating characteristic and performance of the engine was simulated. The simulation program can be used for predicting operation of both healthy and degraded engine conditions.

Mission Operation Capability Verification Test for Low Earth Orbit(LEO) Satellite by Utilizing Interface Environment between LEO Satellite and Ground Station (저궤도 위성과 지상국간 접속 환경을 활용한 임무수행능력 지상 검증 시험)

  • Lee, Sang-Rok;Koo, In-Hoi;Lim, Seong-Bin
    • Aerospace Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.142-149
    • /
    • 2014
  • After launch of Low Earth Orbit(LEO) satellite, Initial Activation Checkout(IAC) and Calibration and Validation(Cal & Val) procedure are performed prior to enter normal operation phase. During normal operation phase, most of the time is allocated for mission operation except following up measures to anomaly and orbit maintenance. Since mission operation capability is key indicator for success of LEO satellite program and consistent with promotion purpose of LEO satellite program, reliability should be ensured by conducting through test. In order to ensure reliability by examining the role of LEO satellite and ground station during ground test phase, realistic test scenario that is similar to actual operation conditions should be created, and test that aims to verify full mission cycle should be performed by transmitting created command and receiving image and telemetry data. This paper describes the test design and result. Consideration items for test design are described in detail and result of designed test items are summarized.

A Design and Fabrication of Test Equipment for Airborne Tracking Radar Test (항공기용 추적레이더 시험을 위한 시험장비의 설계 및 제작)

  • Yoon, Seung-Gu;Park, Seung-wook;Kwon, Jun-Bum;Jung, Man-Seek
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.3
    • /
    • pp.352-361
    • /
    • 2017
  • This paper proposes a design and fabrication of the test equipment that is implemented as a part of the airborne tracking radar inspection under the environment of indoor simulation. This test equipment provides controlling the operation status of airborne tracking radar and replicating the velocity and range information of target by generating a variety of target signal. This is mainly composed of radar operation controller, target signal generator, horn antenna driving devices. Radar operation controller is able to perform the controlling of radar operation mode and monitoring in real time by serial communication. Target signal generator is generated doppler signal and range delayed signal using virtual target of RF-band. Horn antenna driving devices perform a role of target simulating exercise. In the end, the performance is demonstrated using experiment results of test equipment for airborne tracking radar.

Three-phase Making Test Method for Common Type Circuit Breaker

  • Ryu, Jung-Hyeon;Choi, Ike-Sun;Kim, Kern-Joong
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.5
    • /
    • pp.778-783
    • /
    • 2012
  • The synthetic short-circuit making test to adequately stress the circuit breaker has been specified as the mandatory test duty in the IEC 62271-100. The purpose of this test is to give the maximum pre-arcing energy during making operation. And this requires the making operation with symmetrical short-circuit current that is established when the breakdown between contact gap occurs near the crest of the applied voltage. Also, if the interrupting chamber of circuit breakers is designed as the type of common enclosure or the operation is made by the gang operated mechanism that three-phase contacts are operated by one common mechanism, three-phase synthetic making test is basically required. Therefore, several testing laboratories have developed and proposed their own test circuits to properly evaluate the breaker performance. With these technical backgrounds, we have developed the new alternative three-phase making circuit.

Data Processing Method of Radar Processor Unit Test Equipment (레이다처리장치 시험장비의 데이터 처리방안)

  • Lee, Mincheol;Kim, Yong-min
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.6
    • /
    • pp.767-775
    • /
    • 2018
  • To develop and check a Radar Processor Unit, checking the function and performance of the requirement is very important factor in developing Radar. General methods for verifying the Radar is simulation test, environment linkage test and field operation test, firstly, in case of requirement analysis phase, verify Radar algorithm and design by using mathematical method based simulation test method, and secondly, in case of unit test and integrated test phase, Test Equipment is set to simulate radar environment in the lab to verify radar function and performance. Lastly, field operation test phase is carried out to confirm the function and performance after it is mounted on the actual equipment. To successfully develop Radar Processor Unit, using the method of field operation test method after sufficient test cases are tested in radar environmental interlocking method in order to save cost and testing period and because of this reason, development of the Radar Processor Unit Test Equipment is becoming very important factor. In this paper, we introduce the concept of test equipment development and important factors in test equipment, which are target simulation, data processing and device interlocking.

Development and Test of Automatic/Driverless Operation System for Standardized EMU (표준전동차 자동/무인운전장치 개발 및 주행시험)

  • 안태기;이수길;한성호;이관섭
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.3
    • /
    • pp.154-160
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design and testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control and Monitoring System), ATO(Automatic Train Operation), ATC(Automatic Train Control), and TWC(Train to Wayside Communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF