• Title/Summary/Keyword: operation planning system

Search Result 952, Processing Time 0.031 seconds

Highly Intergrated Total Energy System and its Application in a Competitive Electricity Market (전력수급 종합시스템의 현황분석 및 전력산업 구조개편에 따른 전망)

  • Kim, Jung-Hoon;Choo, Jin-Boo
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1501-1505
    • /
    • 1999
  • Highly Integrated Total Energy System for system operational planning and analysis is a totally integrated computerized system for various parts of power system operation planning and power system analysis. It is developed by KEPCO for about 8 years, named HITES. Nowadays restructuring, deregulation, privatization and competition of electricity market is introduced in the world. This paper describes HITES application for two typical models of a competitive electricity market.

  • PDF

Research on Medical Environmental Changes due to the Introduction of ERP(Enterprise Resource Planning) (ERP(Enterprise Resource Planning) 도입에 따른 의료 환경 변화에 대한 연구)

  • Kim, Sun-Chil;Park, Myeong-Hwan
    • Korean Journal of Digital Imaging in Medicine
    • /
    • v.6 no.1
    • /
    • pp.19-23
    • /
    • 2003
  • In recent years, many computer systems that are used for patient diagnostic and treatment purpose s are being introduced within hospitals. Therefore, being in a position to manage the hospital entirely, efforts to integrate their own unique system into one have started. A system values humans and creates the surrounding atmosphere into one which maximizes the abilities of individuals. For this, a scientific integration management operation system is required. The type of system that is demanded due to this requirement is an ERP(Enterprise Resource Planning) system. Lately, even the hospital industry is beginning to show interest in efficient administrative methods. To deliver more predominant medical services, hospitals are trying to introduce scientific administrative methods, whose superiority were proven in enterprises, to the operation system of the hospital organization. ERP values humans over systems, and within a superior system, emphasizes the efficiency of the organization. This sort of process does not just evaluate and manage the working abilities of individuals, but provides an advanced working environment that increases the abilities of members within the organization by fold. Therefore, this research estimates through questionnaires and introductive cases how the introduction of ERP may change the work of customers within hospitals such as the radiologic technology department, and how it may also change the environment of medical services, thus striving to create a radiologic technology department that will not fall behind the times.

  • PDF

Canal Operation Simulation of Middle Route Project

  • Fan, Jie
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.26-32
    • /
    • 2008
  • Middle Route Project, the largest water conveyance system in China delivers the water of Changjiang River to North China. In order to create canal operation simulation system, mathematical models are established based on the analysis of hydraulics about steady flow, unsteady flow, and check gate. By simulating the canal operation behavior, we improved the check gate control algorithm and predicted the change process of water surface and flow profile which is very valuable to actual canal operation.

  • PDF

Local Path Planning Manager for Autonomous Navigation of UGV (무인차량의 자율주행을 위한 지역경로계획 매니저)

  • Lee, Young-Il;Lee, Ho-Joo;Park, Yong-Woon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.6
    • /
    • pp.990-997
    • /
    • 2010
  • The Mission environment of UGV(Unmanned Ground Vehicle) has a complexity and variety, and the status of system and sensor is dependent on the environment factors such as operation time, the weather and road type. It is necessary for UGV to cope adaptively with the various mission types, operation modes and operation environment as human operators do. To satisfy this necessity, we present an autonomy manager based on the autonomous architecture. In this paper, we design a path planning software architecture and LPP manager by using open autonomous architecture which is previously designed by ADD. Field test is conducted with UGV in order to verify the performance of LPP Manager based on the Autonomous Architecture with scenarios.

Study on Characteristics of Urban Planning System and Design Guidelines in Singapore (싱가포르 도시계획체계와 디자인가이드라인의 특징에 관한 연구)

  • Lee, Taeyoung
    • Journal of Urban Science
    • /
    • v.11 no.1
    • /
    • pp.37-47
    • /
    • 2022
  • Even if Korea has established various legal guidelines as well as plans for the purpose of systematic management of urban citycapes, various problems have been pointed out, such as a decrease in operational efficiency because the legal framework is not clearly defined and the guidelines do not fully reflect regional characteristics. In the midst of this, Singapore is being mentioned as a representative example of enhancing international competitiveness by forming an outstanding urban cityscape through successful urban planning and operating system. Therefore, this study aims to suggest a direction for the improvement of Korea's urban planning and design guidelines by investigating and analyzing the characteristics of Singapore's urban planning system and design guidelines. As a result of the research and analysis, it was concluded that Singapore's urban planning system was based on the unified planning and management system. In particular, the Singapore Urban Design Guidelines provide differentiated guidelines to maintain and strengthen regional characteristics based on linkage with higher-level plans as detailed practical guidelines, and were operated as flexible guidelines reflecting the changes of the times and the needs of members of society. It also provides a direction for the improvement of the Korean urban design system, such as to increase the executionablity of the plan and the efficiency of operation by utilizing various guidance and support policies, rational and simplified deliberation procedures, and allow a platform that enhances the accessibility and convenience of related information.

An Adaptive Genetic Algorithm Based Optimal Feeder Routing for Distribution System Planning (적응 유전알고리즘을 이용한 배전계통 계획의 급전선 최적경로 선정)

  • Kim, Byung-Seop;Kim, Min-Soo;Shin, Joong-rin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.2
    • /
    • pp.58-66
    • /
    • 2001
  • This paper presents an application of a newly designed Adaptive Genetic Algorithm (AGA) to solve the Optimal Feeder Routing (OFR) problem for distribution system planning. The main objective of the OFR problem usually is to minimize the total cost that is the sum of investment costs and system operation costs. We propose a properly designed AGA, in this paper, which can handle the horizon-year expansion planning problem of power distribution network in which the location of substation candidates, the location and amount of forecasted demands are given. In the proposed AGA, we applied adaptive operators using specially designed adaptive probabilities. we also a Simplified Load Flow (SLF) technique for radial networks to improve a searching efficiency of AGA. The proposed algorithm has been evaluated with the practical 32, 69 bus test system to show favorable performance. It is also shown that the proposed method for the OFR can also be used for the network reconfiguration problem in distribution system.

  • PDF

Research on Transportation Planning System (Transportation Planning System에 대한 연구)

  • Jeong, Jae-Hun;Lee, Sang-Min;Min, Dae-Gi;Lee, Jae-Ho;Jim, Chen
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.05a
    • /
    • pp.215-221
    • /
    • 2003
  • In today's rapidly changing business environment, quality of responsiveness to customer requirements for short order cycles and on time delivery is becoming more important and considered as one of critical success factors in supply chain management. Yet despite its importance on reducing transportation cost and improving customer service, little attention has been given to the transportation planning system in Korea SI industry. In this paper, we present development of transportation planning system especially to deal with vehicle routing problem which has the goal to minimize the costs of daily transportation operation and to maximize customer delivery service. The system architecture with other enterprise application is presented and real-world constraints are well incorporated into the system by combining constraints programming and meta heuristics.

  • PDF

Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy (휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정)

  • Choi, Nam-Jin;Kim, Byung-Seop;Shin, Joong-Rin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

Control and Operation of a Small Scale Distributed Energy System (소규모 분산에너지시스템의 제어구조 및 운전 (마이크로터빈 중심))

  • Hong, Won-Pyo;Cho, Hoon-Jae
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1139_1141
    • /
    • 2009
  • Distributed Generation (DG) is predicted to play a important role in electric power system in the near future. insertion of DG system into existing distribution network has great impact on real-time system operation and planning. It is widely accepted that micro turbine generation (MTG) systems are currently attracting lot of attention to meet customers need in the distributed power generation market In order to investigate the performance of MT generation systems, their efficient modeling is required. This paper presents the modeling and simulation of a MT generation system suitable for grid-connected operation. The system comprises of a permanent magnet synchronous generator driven by a MT. A brief description of the overall system is given, and mathematical models for the MT and permanent magnet synchronous generator are presented. Also, the use of power electronics in conditioning the power output of the generating system is demonstrated. Simulation studies with MATLAB/Simulink have been carried out in grid-connected operation mode of a DG system. The control strategies for grid connected operation mode of DG system is also presented.

  • PDF

The Best Line Choice for Transmission System Expansion Planning on the Side of the Highest Reliability Level

  • Sungrok Kang;Trungtinh Tran;Park, Jaeseok;Junmin Cha;Park, Daeseok;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.2
    • /
    • pp.84-90
    • /
    • 2004
  • This paper presents a new method for choosing the best line for transmission system expansion planning considering the highest reliability level of the transmission system. Conventional methodologies for transmission system expansion planning have been mainly focused on economics, which is the minimization of construction costs. However, quantitative evaluation of transmission system reliability is important because successful operation and planning of an electric power system under the deregulated electricity market depends on transmission system reliability management. Therefore, it is expected that the development of methodology for choosing the best lines considering the highest transmission system reliability level while taking into account uncertainties of transmission system equipment is useful for the future. The characteristics and effectiveness of the proposed methodology are illustrated by the case study using a MRBTS.