Proceedings of the Korea Water Resources Association Conference (한국수자원학회:학술대회논문집)
- 2008.05a
- /
- Pages.26-32
- /
- 2008
Canal Operation Simulation of Middle Route Project
Abstract
Middle Route Project, the largest water conveyance system in China delivers the water of Changjiang River to North China. In order to create canal operation simulation system, mathematical models are established based on the analysis of hydraulics about steady flow, unsteady flow, and check gate. By simulating the canal operation behavior, we improved the check gate control algorithm and predicted the change process of water surface and flow profile which is very valuable to actual canal operation.
Keywords