• Title/Summary/Keyword: operation cost

Search Result 3,793, Processing Time 0.035 seconds

A Basic Study on the Development of O&M Cost Assessment Model to Improve Operational Efficiency of Large Public Research Infrastructures (CAM) (대형 공공연구인프라의 운영 효율성 제고를 위한 운영 및 유지관리비 평가모델 개발 기초연구)

  • Choi, Sun-Ah;Son, Seung-Hyun;Lee, Sung-Ho;Oh, Oum-Joong;Han, Bum-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.93-94
    • /
    • 2021
  • The Korean government has invested a tremendous amount of money in the last 10 years to build large public research infrastructures (LPRI). For efficient operation and maintenance of LPRI built with expensive equipment and professional engineers, reasonable budget needs to be allocated. However, it is difficult to fulfill sustainable operation and maintenance (O&M) because there is no standard on budgeting for efficient LPRI operation, including expensive equipment and manpower allocation. There have been a lot of cost assessment studies regarding O&M of high-demand facilities such as hospitals, hotels and residential buildings, but a very few on sustainable O&M of LPRI. Therefore, mid/long-term budget establishment plans for efficient LPRI O&M are required from the initial planning stage and a cost assessment model to support the plans should be developed. The objective of this paper is to propose a cost assessment model for sustainable operation and maintenance of large public research infrastructures. To do so, actual O&M data of 6 LPRI types in operation are collected, and regression analysis model (RAM) is used for development and evaluation a cost assessment model. The study result will support sustainable operation of LPRI from a business perspective and be used as basic data for continuous development of cost assessment models to establish budgets for LPRI operation from an academic perspective.

  • PDF

Economic analysis by reduction of calling port and mega containership (선박 대형화 및 기항지 축소에 따른 경제성 분석)

  • 남기찬;곽규석;송용석;김태원;오효진
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.413-419
    • /
    • 2004
  • In these days, 8,000TEU container ship service launches in shipping service at latest based on the economy of scale, unit cost related with ship operation on ocean decreases in proportion to increase of ship scale and mega ship over 10,000TEU is on planning. Most of the exiting researches have performed from the perspective of total operation cost from mega port to mega port. However, the purpose of this paper is to estimate economic efficiency by ports selected Hub port from total cost point of view, operation cost, port charge, feeder cost, etc.

  • PDF

Current Status and Policies for Improvement of Korean Water works Based on the Analyis of Revenue and Operation Costs (최근 세입·세출 분석을 통한 우리나라 수도사업의 현황 및 개선방안)

  • Jeong, Tae-Un;Yang, Seung-Heun;Kim, Jin-Min;Choi, Suing-Il
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.5
    • /
    • pp.637-645
    • /
    • 2009
  • To understand the financial situation of waterworks, the revenue and operation cost from 1996 have been analyzed. The budget of waterworks was 3,775 billion won in 1996 and grew up to 5,774 billion won in 2007. The budget has grown about 1.53 times during 11 years. Based on 2007, total cost for supplying water, rehabilitating old facilities and returning debt and its interest was 4146 billion won. The cost was recovered by 2,825 billion won of water revenue, 827 billion won of various fees revenue, 571 billion won of financial grant and 89 billion won of loan. Until 2007, the 15.3% of operation cost for waterworks was covered by government grant and loan. The renovation cost for old non-efficient facilities was 1,356 billion won in 1996 and was 1,486 billion won in 2007. The renovation cost was not increased remarkably during 10 years. Since the total operation cost was increased about 1.5 times, the percentage for renovating old facilities was decreased from 36% to 25.7%. This trend need to be alerted because the renovation has been slow down when the facilities for water supply need more rehabilitation.

Study on Operational Plan of Hot Gas Parts for Cost Reduction of Gas Turbine with Cases Oriented (가스터빈의 운전유지비 절감을 위한 고온부품의 운영방안에 관한 연구 - 사례중심으로 -)

  • Yu, Won-Ju;Cho, Chi-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.1
    • /
    • pp.93-101
    • /
    • 2009
  • The use of the gas turbine for power supply is increasing recently. Accordingly, the operation and maintenance cost of the gas turbine is gradually increasing and the various efforts to cut the cost are needed. For an operation and maintenance cost saving of the gas turbine, reductions of the new purchasing charge and the reproduction repair cost of the hot gas parts are required through more effective operation and life management methods for the hot gas parts. The hot gas parts are the main parts of the gas turbine and they are replaced with the periodic. In this research, efficient operation and life management methods for the hot gas parts were presented with the cases. The methods were analyzed and verified based on real data and the cases for improving a lifetime were utilized in the field.

A Comparative Study on Optimal Generation Maintenance Scheduling with Marginal Maintenance Cost and Levelized Risk Methods (한계보수비용법 및 위험지수 평준화법에 의한 최적전원보수계획의 비교)

  • 이봉용;심건보
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.1
    • /
    • pp.9-17
    • /
    • 1992
  • Proper resource allocation is also a very important topic in power system problems, especially in operation and planning. One such is optimal maintenance problem in operation and planning. Least cost and highest reliability should be the subjects to be pursued. A probabilistic operation simulation model developed recently by authors is applied to the proboem of optimal maintenance scheduling. Three different methods are compared, marginal maintenance cost, levelized risk and maintenance space. The method by the marginal maintenance costs shows the least cost, the highest reliability and the highest maintenance outage rates. This latter characteristics may considerably influence the results of genetation planning, because the usual maintenance outages obtained from the other methods have shown to be lower.

  • PDF

Optimal capacity and allocation of distributed generation by minimum operation cost of distribution system (배전계통 운영비용의 최소화에 의한 분산전원의 최적용량과 위치결정)

  • Park, Jung-Hoon;Bae, In-Su;Kim, Jin-O;Shim, Hun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.360-362
    • /
    • 2003
  • In operation of distribution system, DGs(Distributed Generations) are installed as an alternative of extension and establishment of substations, transmission and distribution lines according to increasing power demand. Optimal capacity and allocation of DGs improve power quality and reliability. This paper proposes a method for determining the optimal number, size and allocation of DGs needed to minimize operation cost of distribution system. Capacity of DGs for economic operation of distribution system can be estimated by the load growth and line capacity during operation planning duration. DG allocations are determined to minimize total cost with failure rate and annual reliability cost of each load point using GA(Genetic Algorithm).

  • PDF

A Study on Parts Route Selection and Economic Design in Flexible Manufacturing System (유연 제조시스템에서 작업경로선택과 경제적인 설계에 관한 연구)

  • 장석화
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.249-263
    • /
    • 1997
  • This paper addresses the parts route selection and economic design in flexible manufactuirng system (FMS). Parts are processed through several stage workstations according to operation sequences. The machine of each workstation can do multiple operation functions. And the operation stage of a part can be processed in several workstations, which are non-identical in functional performance. The objective of this paper is to determine the processing routes of parts, number of machine at each workstation, number of vehicle and makespan time. Two models are suggested. One is assumed that the operation stage of parts can be processed at the only one among several available workstations. Other is assumed that the operation stage of parts is allowed to be processed at several workstations. Parts are transported by automated guided vehicles (AGVs). The decision criteria is to minimize the sum of processing cost, travel cost, setup cost and overhead cost. The formulation of models is represented. A solution algorithm is suggested, and a numerical example is shown.

  • PDF

A Study on Flight inspection cost analysis and Proper commissions calculator (비행검사용 항공기 수수료 분석 및 적정 수수료 산정에 관한 연구)

  • Kim, Woong-Yi;Choi, Youn-Chul
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.4
    • /
    • pp.126-131
    • /
    • 2012
  • In South Korea, there is no consideration for increasing labor costs and price fluctuation regarding the commission for a flight inspection. Because this causes a deficit in the flight inspection related operation, the cost system should be improved. Therefore, this research considers the first cost analysis in order to calculate a proper flight inspection commission through three different types of cost making methods. Moreover, as flight inspections are held by flights and human labors, labor costs are included as the main operation cost. According to the research, it is analyzed that the total cost to process flight inspection operations is decided by the scope of aircraft operation.

Reliability estimation and optimal capacity and allocation by distributed generation installation (분산전원 설치에 따른 신뢰도 평가와 최적용량과 위치결정)

  • Park, Jung-Hoon;Shin, Dong-Suk;Kim, Jin-O;Kim, Kyu-Ho;Cho, Jong-Man
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.151-153
    • /
    • 2003
  • This paper proposes determining a optimal number, size and allocation of DGs(Distributed Generations) needed to minimize operation cost of distribution system, obtains economic benefit in operation planning of DG and improves system reliability. System reliability is assessed whether DG install and reliability cost consider. DG optimal allocations are determined to minimize total cost with power buying cost, operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm). And it was determined installed load-point and order.

  • PDF

Reliability Improvement Considering Interruption Cost with Load Type in Distribution Systems (부하형태에 따른 정전비용을 고려한 배편계통의 신뢰도 향상)

  • Kim, Kyu-Ho;Bae, In-Su;Kim, Jin-O;Lee, Sang-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.143-146
    • /
    • 2004
  • This paper presents a method to improve reliability by dispersed generation (DG) installation considering load types and interruption cost. The objective functions such as power losses cost, operation cost of DGS, power buy cost and interruption cost are minimized for reliability improvement and efficient operation. The several indices for reliability evaluation are improved by dispersed generation system installation.

  • PDF