• 제목/요약/키워드: on-site management

검색결과 3,831건 처리시간 0.032초

지중환경 관리를 위한 부지개념모델 구축 및 개선 (Development and Enhancement of Conceptual Site Model for Subsurface Environment Management)

  • 배민서;김주희;이순재;권만재;조호영
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제27권spc호
    • /
    • pp.1-18
    • /
    • 2022
  • A conceptual site model is used to support decision-making of response strategy development, determination, and implementation within a risk-based contaminated site management system. It aims to provide base information of the relevant site characteristics and surface/subsurface conditions in order to understand the contaminants of concern and the associated risk they pose to the receptors. This study delineated the technical details of conceptual site model development, and discussed the possibility of applying it in domestic subsurface contamination management. Conceptual site models can be developed in various formats such as tables, diagrams, flowcharts, and figures. Contaminated sites are managed for a long period of time following the steps of investigation, remediation design, remediation, verification, and post-remedation management. The conceptual site model can be enhanced in each stage of the contaminated site management based on the continuously updated information on the site's subsurface environment. In the process of enhancement for conceptual site model, precision is gradually improved, and it can evolve from a conceptual and qualitative form to a more quantitatvive and three-dimensional model. In soil pollution management, it is desirable to incorporate the conceptual site model into the soil scrutiny system to better assess the current status of the contaminated site and support follow-up investigation and management.

AUTOMATING SUPERVISORY MANPOWER ALLOCATION FOR CONSTRUCTION SITES

  • Jieh-Haur Chen;Li-Ren Yang;W. H. Chen;C. K. Chang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.239-248
    • /
    • 2007
  • In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.

  • PDF

DATA ACQUISITION METHOD USING A SMARTPHONE ON CONSTRUCTION SITE

  • Ahra Jo;Teahoon Kim;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.231-234
    • /
    • 2013
  • According to the recent development of USN technology, it has been applied in various fields of construction management. In particular, the concrete curing management using the wireless measurement system is actively being conducted. However, the existing method has limitations such as the reinstallation of temperature sensors and repositioning of repeaters. It is also not easy to acquire the measured data. Thus, this study focuses on the concrete curing management. This study proposes data acquisition method using the smartphone on construction site and tests applicability of the data measuring device and the smartphone. The test allows us to suggest the actual communication distance on construction site and to determine the correction value that is applied to the measured temperature. The data acquisition method proposed in this study is intended to enable appropriate management on construction site and will be able to be applied effectively to a variable construction site. It can also be used in all fields of construction management.

  • PDF

국내 건설 현장관리업무의 개선방안에 관한 연구 (A study on the Improvement Plan of Construction Site Management In Korea)

  • 김진호
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.

PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구 (A Case Study on the Quality Management of Construction Site through PDCA Cycle)

  • 백인희
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

수술실 간호인력 대상 수술부위 감염관리 교육의 효과 (The Effect of Educational Training on Surgical Site Infection Management for Operating Room Nursing Staff)

  • 허연정;남소희;현혜진
    • 한국의료질향상학회지
    • /
    • 제27권2호
    • /
    • pp.83-93
    • /
    • 2021
  • Purpose: This study tested the effectiveness of brochure- and video-based education on managing surgical site infections by operating room health personnel. Methods: From April 20 to May 4, 2021, 34 operating room health personnel were subjected to training on surgical site infection management using brochures and educational videos. A survey was then conducted on knowledge, perception, and adherence regarding surgical site infection management. Results: After receiving training on surgical site infection management, the knowledge score increased significantly (15.15±2.09 vs.19.70±1.96, p<.001). However, the perception and adherence scores were already near perfect before the intervention and did not further increase after the intervention. Conclusion: It is necessary to develop and utilize continuous and substantive educational programs to improve perception and adherence of surgical site infection management.

Opportunities for construction site monitoring by adopting first personal view (FPV) of a drone

  • Kim, Seungho;Kim, Sangyong
    • Smart Structures and Systems
    • /
    • 제21권2호
    • /
    • pp.139-149
    • /
    • 2018
  • Understanding the current status of a construction project is necessary to achieve successful on-site management. Real-time information delivery is a major concern for construction industry practitioners in order to expedite decisions and discussions. We propose the use of a first personal view (FPV) system of a quadcopter drone as a tool for monitoring on-site status and communicating between construction participants. The most important function of the drone FPV system is its ability to visually monitor construction site situations in real time. An on-site management system process is developed, verified, and applied to several construction work tasks after determining factors that affect efficient construction management. The proposed system is expected to assist the construction manager in achieving high efficiency.

THE CONFLICT MANAGEMENT STYLE ADOPTED BY THE SUBCONTRACTORS OF HONG KONG BUILDING PROJECTS

  • Andy K.W. Ng;Andrew A.D.F. Price
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.628-634
    • /
    • 2009
  • It is a common practice in Hong Kong for the main contractors of local building projects to sublet most of the work to subcontractors. Consequently their roles have gradually transformed from a constructor to a manager of subcontractors. The outcomes of a project therefore depend heavily on the subcontractors' performance. However, most of the subcontractors complain that they are unable to efficiently and effectively operate due to site coordination problems, such as inaccurate site reference lines, caused by main contractors. The site problems may consume significant amounts of resources if practical solutions cannot be agreed by the project participants early enough. Rahim Organizational Conflict Inventory-II (ROCI-II) model was developed by M.A. Rahim that measure five types of conflict management style including Integrating, Obliging, Dominating, Avoiding and Compromising. This paper presents the questionnaire survey based on the ROCI-II model to rank the preference on the conflict management style adopted by the project representatives of the subcontractors in handling the site coordination problems and its impact to the time used to agree the solutions to the different types of site coordination problems with main contractor. The survey results show that most of the subcontractors' project representatives preferred to adopt the Compromising style to tackle the site coordination problems and the time used to agree the solutions with main contractor was influenced by the conflict management style adopted.

  • PDF

이미지 기반 실시간 건설 현장 장비 및 작업자 모니터링을 위한 딥러닝 플랫폼 아키텍처 도출 (Deep learning platform architecture for monitoring image-based real-time construction site equipment and worker)

  • 강태욱;김병곤;정유석
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.24-32
    • /
    • 2021
  • Recently, starting with smart construction research, interest in technology that automates construction site management using artificial intelligence technology is increasing. In order to automate construction site management, it is necessary to recognize objects such as construction equipment or workers, and automatically analyze the relationship between them. For example, if the relationship between workers and construction equipment at a construction site can be known, various use cases of site management such as work productivity, equipment operation status monitoring, and safety management can be implemented. This study derives a real-time object detection platform architecture that is required when performing construction site management using deep learning technology, which has recently been increasingly used. To this end, deep learning models that support real-time object detection are investigated and analyzed. Based on this, a deep learning model development process required for real-time construction site object detection is defined. Based on the defined process, a prototype that learns and detects construction site objects is developed, and then platform development considerations and architecture are derived from the results.

기혼여성 재택근무자와 직장근무자의 가사노동 시간관리전략에 관한 연구 (A study on housework time management strategies between married female home-based workers and on-site workers)

  • 김효정
    • 가정과삶의질연구
    • /
    • 제19권2호
    • /
    • pp.83-96
    • /
    • 2001
  • This study examined housework time management strategies between married female home-based workers and on-site workers, and found out the factors affecting the housework time management strategies. The data were collected from 165 married female home-based workers, and 292 married female on-site workers in Pusan and Kyungnam province, by self-administered questionnaire. Frequency distributions, Cronbachs alpha, t-tests, Pearsons correlations, and multiple regression analyses were conducted by SPSS/PC+. The major findings of this study were kas follows: 1) Married female home-based workers more used obtaining additional help and personal time reallocation than married female on-site workers. 2) For married female home-based workers, educational attainment and occupation were significant factors affecting housework time management strategies, and for married female on-site workers, employment hours per week and existence of elders/disability within the family were important variables.

  • PDF