• Title/Summary/Keyword: on-site assembly

Search Result 149, Processing Time 0.026 seconds

Study on improving method of arranging trapezoidal pre-cast segment lining in shield tunnel (쉴드터널의 사다리꼴 세그먼트라이닝 배열방법 개선에 대한 연구)

  • Kim, Jung-Hyun;Kang, Kyung-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.1-18
    • /
    • 2007
  • This study is about an arrangement method of trapezoidal pre-cast segment lining that can be applied in shield tunnel construction. Trapezoidal segment lining is formed by assembling tapered pre-cast concrete segments taking advantage of the tapered shape of pre-cast segments upon delivery on site. By calculating tapering of the segments manufactured in single type and rotating the segments when putting them together, a variety of tunnel alignments can be arranged in the most efficient way. Once the design criteria and tunnel alignment (straight or curved) is analyzed, the sequence of assembling trapezoidal segments in compliance with tunnel alignment will be computed. On site an operator can utilize the softwareto automatically determine sequential arrangement of trapezoidal segments. When the actual arrangement of segmental lining is different from the computed output, the operator can input the actually measured values to coincide the computerized calculation with the real status of assembly. Then the adjustment will be the basis of subsequent arrangement of segments, thus the continuity of work can be guaranteed.

  • PDF

A Study on Development of Owner's Standard Specification Structure for Modular Building (모듈러 전문 시방서 개발을 위한 체계 구축)

  • Nam, Sunghoon;Park, Honggeon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.12-21
    • /
    • 2019
  • Specification is an important document for securing safe construction and improving quality as well as the contract document. Currently, the specifications used in modular buildings in Korea are only the construction specification, and most of the contents are used by borrowing the standard specifications of the building, so the contents of the modular buildings can not be reflected and it is contents are similar to the guideline book. The current status of domestic specification for modular buildings is affecting the quality of modular buildings. Therefore, we analyze activity through monitoring the modular process of modular buildings and analyze systematically relationship by applying IDEF modeling with analyzed activity. As result this paper proposes a structure of special specification specialized in modular building through generalization. The major classifications were divided into three stages : factory construction, transportation, and on-site installation. The specification structure was divided into 32 types of construction items from the floor slab assembly of the factory production to the joint finish of the on site installation in accordance with the opinion of experts.

Case Study on the Building Organization of Medibio Research Laboratory Facilities in Research-driven Hospital (연구중심병원 의생명연구원의 실험실 구성 사례 조사)

  • Kim, Young-Aee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.11
    • /
    • pp.95-104
    • /
    • 2018
  • Healthcare technology has been growing and fostering cooperation between industry, university and hospitals as growth engines in korea. So, the medibio research institutes in hospital have been constructed to promote research and industrialization centering on healthcare technology. The purpose of this study is to investigate the cases of research institutes in hospitals, and search the characteristics of building organization of medibio research laboratory facilities. Case study is investigated by floor plan, homepage and site visits about five research institutes selected in research-driven hospitals. The facility title and size of research laboratory is originated from site area and research building location. The building function include not only the research lab and business office reflecting on the development platform, and but assembly and meeting room in the ground level. Laboratory floor plans have three types, rectangular, rectangular+linear and linear type, one is traditional and efficient, the others are people and friendly. And building core types are correlated with lab space unit modules, single and double side core are shown in rectangular type. All the laboratories are open lab, composed with laboratory bench and research note writing desk facing the lab service and enclosed lab-support area. And they have communication space looking as warm and cozy common area for the innovation, convergence and collaboration. As the high risk of contamination and high standard for safety and security, equipment and facilities are well managed with biological environment including BSC, fume hood, PCR classification, eye washing and emergency shower.

3D Printing in Modular Construction: Opportunities and Challenges

  • Li, Mingkai;Li, Dezhi;Zhang, Jiansong;Cheng, Jack C.P.;Gan, Vincent J.L.
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.75-84
    • /
    • 2020
  • Modular construction is a construction method whereby prefabricated volumetric units are produced in a factory and are installed on site to form a building block. The construction productivity can be substantially improved by the manufacturing and assembly of standardized modular units. 3D printing is a computer-controlled fabrication method first adopted in the manufacturing industry and was utilized for the automated construction of small-scale houses in recent years. Implementing 3D printing in the fabrication of modular units brings huge benefits to modular construction, including increased customization, lower material waste, and reduced labor work. Such implementation also benefits the large-scale and wider adoption of 3D printing in engineering practice. However, a critical issue for 3D printed modules is the loading capacity, particularly in response to horizontal forces like wind load, which requires a deeper understanding of the building structure behavior and the design of load-bearing modules. Therefore, this paper presents the state-of-the-art literature concerning recent achievement in 3D printing for buildings, followed by discussion on the opportunities and challenges for examining 3D printing in modular construction. Promising 3D printing techniques are critically reviewed and discussed with regard to their advantages and limitations in construction. The appropriate structural form needs to be determined at the design stage, taking into consideration the overall building structural behavior, site environmental conditions (e.g., wind), and load-carrying capacity of the 3D printed modules. Detailed finite element modelling of the entire modular buildings needs to be conducted to verify the structural performance, considering the code-stipulated lateral drift, strength criteria, and other design requirements. Moreover, integration of building information modelling (BIM) method is beneficial for generating the material and geometric details of the 3D printed modules, which can then be utilized for the fabrication.

  • PDF

Evaluation on the Outcome of International Deep Seabed Mining Regime and Its Prospect (심해저 광물자원 개발제도의 운영결과 분석 및 향후전망)

  • Lee, Yong-Hee
    • Ocean and Polar Research
    • /
    • v.27 no.1
    • /
    • pp.97-108
    • /
    • 2005
  • The International Seabed Authority (ISA) formally came into existence upon the entry into force of the UNCLOS on 16 November 1994. By adopting the Implementing Agreement in 1994, UNCLOS has the universality as a Magna Carta of International Ocean Regime, and the Deep Seabed Mining Regime could be operated as a unique one for the benefit of mankind. During last 10 years, ISA established the institutional framework successfully and made substantial and tangible progress in formulating the rules, regulations and procedures for the prospecting and exploration for polymetally nodules. Furthermore, RPI's obligations had been carried out completely, and the 7 RPI made contract with ISA to become a contractor who has an at least 15 you exclusive right for exploration in their allocated site. However, due to the uncertainty of commercial mining, the number of representatives from developing countries has been getting looser and looser and ISA has a problem of quorum of the Assembly. Land-based producers took a very strong opposite position to the contractors to make their loss in the minimum level. For the next decade, it might be prospected that ISA will focus on monitoring the contractor's activities, making rules, regulations and procedures for exploration on cobalt rich crust, sulphide and methane hydrate and implementing environment studies.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

A Study on the Integrated Management System of Municipal Solid Waste from Seoul Metropolitan City (서울시 일반폐기물의 통합적 관리체계에 관한 연구)

  • 우세홍;홍상균
    • Journal of Environmental Health Sciences
    • /
    • v.19 no.4
    • /
    • pp.51-58
    • /
    • 1993
  • The integrated solid waste management for Seoul Metropolitan city can be established on the basis of the following hierarchy of priorities: 1. Efforts for source reduction should be propelled by both government and citizens to achieve the effects of resource conservation. The adequate production and consumption which are environmentally amenable and sustainable can be induced by the reasonable imposition of deposit money for waste treatment to one-time use products. To accomplish source reduction effectively, the induction of legal and institutional regulation of producer and consumer participation is requisite. 2. For resource recovery, wastes generated should be recycled as far as practicable. Community residents are responsible to separate discharge, the authorities concerned have responsibility of separate collection, and recycling industry should be assissted through tax reduction and financing. Resource separation facilities can be constructed at Kimpo Metropolitan landfill site for wastes not separately collected due to some unavoidable circumstances. 3. Garbage should be composted. Garbage is uneconomical for incineration, because it has high moisture content and low calorie, thus there is no reason for the incineration of garbage even though garbage is classified into combustibles. Composting facilities can be located at sites which are not densely populated and easily accessible to transportation, for example, Kimpo Metropolitan landfill site. Compost produced can be managed by the authorities for the use of fertilizer to a green tract of suburban land and farms. 4. Nonhazardous combustible wastes not recyclable can be utilized for thermal recovery at the incinerators which are completely equipped with pollution control devices. According to the trend of local autonomy and the equity principle of local autonomous entities, incineration facilities of minimal capacity required can be constructed at each districts of Seoul Metropolitan city which have organized local assembly. In case of Yangcheon district, the economically combustible waste quantity is about 260 tons/day which exceeds 150 tons/day, the incineration capacity of existing facility. But, from now on, waste quantity can be reduced substantially by the intensive efforts of citizens for source reduction and recycling and the institutional support of administrative organizations. Especially, it is indispensable for the government to constitute institutional and technological bases that can recycle paper and plastics form 43% of waste generated. A good time for constructing of incineration facilities for municipal solid waste can be postponed to the time that pollution control technologies of domestic enterprises are fully developed to satisfy the standards of air pollution prevention, because the life expectancy of Kimpo Metropolitan landfill site is about 25 years. Within this period, institutional improvements and technological advancements can be attained, while the air qual. ity of Seoul Metropolitan city can be ameliorated to the level to afford incineration facilities. 5. For final disposal, incombustibles and ash are landfilled sanitarily at Kimpo Metropolitan landfill site.

  • PDF

Development of Advanced Dynamic Cone Penetration Test Apparatus and Its Application Performance Evaluation (개량식 동적 콘 관입시험기의 개발 및 적용성 평가)

  • Kim, Uk-Gie;Zhuang, Li;Lee, Kwang-Wu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.4
    • /
    • pp.119-131
    • /
    • 2014
  • For quick and accurate ground investigation in wide construction site being not easy to access, advanced dynamic cone penetration test equipment was developed based on widely used equipment abroad. Advantages of existing equipment of portability and simple testing method were reflected in the new developed equipment. Meanwhile, by extending connection of lower rod, penetration depth is raised to 6m from 1 m of the existing equipment. Moreover, by assembly of hammer (2+3+3kg) and cone (3 types) etc., it is possible to perform test under the same conditions with those by German and Japan dynamic cone penetration test equipment (Tsukuba, PWRI and SH types). Auxiliary equipment was applied to make sure of perpendicularity as penetration depth increases. Applicability of the new developed equipment was evaluated through tests on various fields and its reliability was verified.

A Study on Safety Awareness of Managers and Workers in Construction after the Serious Accident Punishment Act (중대재해처벌법 시행 후 건설현장 관리자 및 근로자의 안전의식에 대한 연구)

  • Dongsun Lee;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.543-548
    • /
    • 2023
  • Korea has achieved great economic growth, but the high rate of accidents in the industry still threatens the safety of workers and causes a lot of property loss. In order to lower the accident rate, the Occupational Safety and Health Act was fully revised in April 2020 and safety management was strengthened, but the number of deaths rather increased. In response, the government and the National Assembly implemented the Serious Accident Punishment Act in January 2022, but the effect has not been confirmed. So, this study conducted a questionnaire survey on how the safety awareness of construction site workers and managers was affected after the Serious Accident Punishment Act. and suggested measures to improve safety management.

A Comparative Analysis of Construction Labor Productivity in OECD Countries (OECD 국가의 건설업 노동생산성 비교 및 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.175-185
    • /
    • 2023
  • Upon analyzing labor productivity in the construction industry across OECD countries, it was found that in 2019, labor productivity per employee in the South Korean construction industry was lower than that of major developed countries when adjusted for purchasing power parity(PPP). Specifically, when benchmarked against other countries at a base of 100, South Korea scored 76.9 in the United States, 88.4 in Japan, and 85.1 in the OECD average. Notably, South Korea ranked 25th in labor productivity per employee in the construction industry among 35 OECD countries in 2019, indicating a low standing. A comparative analysis of the construction market size and labor productivity in the construction industry across OECD countries revealed that larger construction markets did not necessarily correlate with higher labor productivity. To enhance labor productivity in the construction industry, this study proposed the active implementation of smart construction technology at construction sites and the promotion of on-site assembly work using off-site construction(OSC) technology, rather than traditional on-site labor. Moreover, it was recommended that the development of modular construction methods and technologies be expanded. In the future, if off-site production methods and modules are further developed through advanced robotics and factory automation, labor productivity is anticipated to increase due to the restructuring of production methods, such as manufacturing.