KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.2D
/
pp.95-101
/
2012
Layout Criteria are developed for an access mode's on and off facility at multiple transfer centers in this paper. Layout Criteria are location issues between a main mode and access modes in terms of the on and off facility one another. The total distance between them has been suggested to be minimized. In the distance calculation stairs are considered to be more difficult and than open space. On the other hand an escalator and an elevator are treated as easier than open space. Considering the number of people between on and off facility, the weighted average distance is suggested to be a MOE(Measure of effectiveness) for layout criteria at multiple transfer centers. Finally, the layout criteria are applied to the existing Kimpo airport terminal and some improvement ideas are suggested.
Journal of Korean Society of Environmental Engineers
/
v.38
no.5
/
pp.249-254
/
2016
In this study, we investigated the main characteristics of off-gas generated from melting process and off-gas treatment system operation example to provide some primary data for commercial vitrification facility design. The purpose of vitrification facility operation is to treat hazardous materials in the radioactive wastes and harmful off-gas containing a variety of chemical species generated in the glass melting process. Constructing and operating vitrification facility essentially need to be licensed through safety analysis; it is very important to treat radionuclide and hazardous materials below the legal environment emissions regulation level. We must accurately understand the characteristics of off-gas and apply an appropriate off-gas treatment process accordingly. Thus, to design the appropriate off-gas treatment there must be a wide range of elements taken into account such as characteristics of waste and melter, regulation guidance of off-gas, characteristics of generated off-gas and off-gas treatment system performance assessment.
This study was conducted to develop precision control system fur cold storage facility that could offer safe storage environment for green grocery. For that reason of neuro-fuzzy control system with learning ability algorithm and single chip neuro-fuzzy micro controller was developed for cold storage facility. Dynamic characteristics and hunting of neuro-fuzzy control system were far superior to on-off and fuzzy control system. Dynamic characteristics of temperature were faster than on-off control system by 1,555 seconds(123% faster) and fuzzy control system by 460 seconds(36.4% faster). When system was arrived at steady state. hunting was ${\pm}$0.5$^{\circ}C$ in on-off control system, ${\pm}$0.4$^{\circ}C$ in fuzzy control system, and ${\pm}$0.3$^{\circ}C$ in neuro-fuzzy control system. Hunting of humidity and wind velocity was also controlled precisely by 70 to 72.5% and 1m/s For storage experiment with onion, characteristics of neuro-fuzzy control system were tested. Dynamic characteristics of neuro-fuzzy control system made cold storage facility conducted precooling ability and minimized hunting.
International Journal of Reliability and Applications
/
v.2
no.4
/
pp.269-280
/
2001
The objective of this paper is to provide a model for effective implementation of costing RAM management in the design and procurement of production facility considering the system cost-performance trade-off. This research proposes a two-step approach of costing RAM design and test of system RAM for production facility. In Step 1, a static model is proposed to find an initial system configuration to meet the required performance based on system RAM and LCC and analyzes the trade-off relationships between various factors of RAM and LCC. In the second Step, we developed time and failure truncated models for system reliability test and analysis. For the computational purpose, we developed computer programs and have shown the sample results. By the sample test run, the proposed model has shown the possibilities to provide a good method to analyze system performance evaluation for both design and operational phase, This model can be applied to a wide variety of systems not only for costing RAM of the production facilities but also for the other kinds of equipment.
In this study, a method to determine the design capacities of nonpoint source (NPS) pollutant treatment facilities in urban areas was suggested. A facility capacity to treat 80 percent of total SS discharge was estimated by 2-year rainfall - runoff - build-up and wash-off simulation at Goonja drainage district in Seoul. For wash-off simulation, four wash-off models (EMC, RC, EXP, and Joo model) were used. As the results, 80 percent of total SS discharge could be treated with only 7.7~31.4% facility capacity of peak flow. The suggested method and results will provide a guideline to determine design capacities of NPS pollutant treatment facility in urban areas.
International Journal of Air-Conditioning and Refrigeration
/
v.6
/
pp.136-147
/
1998
An experimental facility consisting of two 3$\times$4.4$\times$2.8m rooms identical in construction is built. Each room has a control system and storage tank supplying hot water to the radiant floor heating system. The facility enables simultaneous comparison of two different control strategies each implemented in a separate room. The operating performance of three kinds of flow control scheme is tested and compared in this study: (ⅰ) conventional on-off control based on feedback from room air temperature (ⅱ) TPSC(two parameter switching control )(ⅲ) TPOC(two parameter on-off control). Results show that TPSC and TPOC using room air and surface temperature sequentially as feedback signal to control hot water supply is the better temperature regulation scheme than conventional control based on feedback from only room air temperature. They are good candidates for the room with radiant floor heating system under continuous and intermittent heating mode.
Since the HF release in 2012 in Korea, it became one of the most significant to evaluate consequence to the vicinity of industry facilities handling hazardous materials. BTX plant is selected to assess off-site risk to check whether the facility satisfies the Chemical Control Law by Korea Government. Accident scenarios were listed using process safety information. The scenarios having effect to the off-site were selected and assessed further according to guideline provided by Korea government. Worst case and alternative scenarios including other interested scenarios were evaluated using ALOHA. Each evaluated scenario was assessed further considering countermeasures. The results showed that the facility handling chloric acid is safe enough and needed no further protections at the moment.
A liquid rocket engine goes through many tests to prove its performance before liftoff. It means the tests for setting ignition and start-up conditions or a test on design condition, which verifies the design performance. However, the development process requires verification of performance under off-design conditions through tests involving different operating conditions, which affects the duration of engine development. The off-design performance test is performed by altering the conditions of the propellant supplied to the engine in conjunction with the engine performance test that varies the opening of the control valves in the engine. This paper is based on the results of the engine tests performed at the KSLV-II engine test facilities in the Naro Space Center and describes the operations of the test facility for off-design condition test that changes the inlet conditions of the turbo-pump due to changes in the pressure and temperature of the propellant supplied to the test engines.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2004.04a
/
pp.353-359
/
2004
Underground facility DB that is constructed by NGIS project need efficient management methodology, because falling-off in quality was worried by confused of existing management affair and management affair of computerization environment. Through analysis of existing management affair, underground facility DB and management system decide that modification/renewal factor of underground facility DB and subject affair Through modification/renewal factor of underground facility DB, developed underground facility DB management methodology using MMS. Result that apply developed management methodology to subject affair, existing affair environment improved to computerization environment and Could improve underground facilities DB authoritativeness.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.9
no.4
/
pp.472-483
/
1997
An experimental facility consisting of two $3{\times}4.4{\times}3.8m$ rooms identical in construction is built. Each room has a control system and storage tank supplying hot water to the radiant floor heating system. The facility enables simultaneous comparision of two different control stratigies each implemented in a separate room. The operating performance of three kinds of flow control scheme is tested and compared in this study : (i) conventional on-off control based on feedback from room air temperature (ii) TPSC(two parameter switching control) (iii) TPOC(two parameter on-off control). Results show that TPSC and TPOC using room air and surface temperature sequentially as feedback signal to control hot water supply is the better temperature regulation scheme than conventional control based on feedback from only room air temperature. They are good candidates for the room with radiant floor heating system under continuous and intermittent heating mode.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.