• 제목/요약/키워드: nuclear power plant (NPP)

검색결과 466건 처리시간 0.029초

Measurement of missing video frames in NPP control room monitoring system using Kalman filter

  • Mrityunjay Chaubey;Lalit Kumar Singh;Manjari Gupta
    • Nuclear Engineering and Technology
    • /
    • 제55권1호
    • /
    • pp.37-44
    • /
    • 2023
  • Using the Kalman filtering technique, we propose a novel method for estimating the missing video frames to monitor the activities inside the control room of a nuclear power plant (NPP). The purpose of this study is to reinforce the existing security and safety procedures in the control room of an NPP. The NPP control room serves as the nervous system of the plant, with instrumentation and control systems used to monitor and control critical plant parameters. Because the safety and security of the NPP control room are critical, it must be monitored closely by security cameras in order to assess and reduce the onset of any incidents and accidents that could adversely impact the safety of the NPP. However, for a variety of technical and administrative reasons, continuous monitoring may be interrupted. Because of the interruption, one or more frames of the video may be distorted or missing, making it difficult to identify the activity during this time period. This could endanger overall safety. The demonstrated Kalman filter model estimates the value of the missing frame pixel-by-pixel using information from the frame that occurred in the video sequence before it and the frame that will occur in the video sequence after it. The results of the experiment provide evidence of the effectiveness of the algorithm.

원전 형상기준선 적용방안에 관한 연구 (A Study on the Application Method of Configuration Baseline for Nuclear Power Plant)

  • 박유진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.199-200
    • /
    • 2017
  • The Configuration Management(CM) of Nuclear Power Plant(NPP) is an activity that maintains consistency among the design requirement, facility configuration information and physical configuration. It is a systematic approach to performing various engineering tasks such as change management by identifying, documenting the characteristics of plant Structures, Systems and Component(SSC). The first activity that should be performed the configuration baseline setting at the start of project. The configuration baseline of the NPP construction phase is the status of the SSC of the plant at a specified process and time, and the actual configuration changes depending on the condition of plant. In this paper, I have studied the current status of configuration baseline used in the software industry and general plant industry, method of establishment for the configuration baseline which was first applied to the construction of NPP.

  • PDF

ASSESSMENT OF THE SAFETY OF ULCHIN NUCLEAR POWER PLANT IN THE EVENT OF TSUNAMI USING PARAMETRIC STUDY

  • Kim, Ji-Young;Kang, Keum-Seok
    • Nuclear Engineering and Technology
    • /
    • 제43권2호
    • /
    • pp.175-186
    • /
    • 2011
  • Previous evaluations of the safety of the Ulchin Nuclear Power Plant in the event of a tsunami have the shortcoming of uncertainty of the tsunami sources. To address this uncertainty, maximum and minimum wave heights at the intake of Ulchin NPP have been estimated through a parametric study, and then assessment of the safety margin for the intake has been carried out. From the simulation results for the Ulchin NPP site, it can be seen that the coefficient of eddy viscosity considerably affects wave height at the inside of the breakwater. In addition, assessment of the safety margin shows that almost all of the intake water pumps have a safety margin over 2 m, and Ulchin NPP site seems to be safe in the event of a tsunami according to this parametric study, although parts of the CWPs rarely have a margin for the minimum wave height.

Damage and vibrations of nuclear power plant buildings subjected to aircraft crash part I: Model test

  • Li, Z.R.;Li, Z.C.;Dong, Z.F.;Huang, T.;Lu, Y.G.;Rong, J.L.;Wu, H.
    • Nuclear Engineering and Technology
    • /
    • 제53권9호
    • /
    • pp.3068-3084
    • /
    • 2021
  • Investigations of large commercial aircraft impact effect on nuclear power plant (NPP) buildings have been drawing extensive attentions, particularly after the 9/11 event, and this paper aims to experimentally assess the damage and vibrations of NPP buildings subjected to aircraft crash. In present Part I, two shots of reduce-scaled model test of aircraft impacting on NPP building were carried out. Firstly, the 1:15 aircraft model (weighs 135 kg) and RC NPP model (weighs about 70 t) are designed and prepared. Then, based on the large rocket sled loading test platform, the aircraft models were accelerated to impact perpendicularly on the two sides of NPP model, i.e., containment and auxiliary buildings, with a velocity of about 170 m/s. The strain-time histories of rebars within the impact area and acceleration-time histories of each floor of NPP model are derived from the pre-arranged twenty-one strain gauges and twenty tri-axial accelerometers, and the whole impact processes were recorded by three high-speed cameras. The local penetration and perforation failure modes occurred respectively in the collision scenarios of containment and auxiliary buildings, and some suggestions for the NPP design are given. The maximum acceleration in the 1:15 scaled tests is 1785.73 g, and thus the corresponding maximum resultant acceleration in a prototype impact might be about 119 g, which poses a potential threat to the nuclear equipment. Furthermore, it was found that the nonlinear decrease of vibrations along the height was well reflected by the variations of both the maximum resultant vibrations and Cumulative Absolute Velocity (CAV). The present experimental work on the damage and dynamic responses of NPP structure under aircraft impact is firstly presented, which could provide a benchmark basis for further safety assessments of prototype NPP structure as well as inner systems and components against aircraft crash.

면진장치 적용을 고려한 원전구조물 생애주기 분석 (Life-Cycle Analysis of Nuclear Power Plant with Seismic Isolation System)

  • 김선용;이홍표;조명석
    • 한국전산구조공학회논문집
    • /
    • 제26권6호
    • /
    • pp.415-421
    • /
    • 2013
  • 본 논문에서는 면진시스템이 원전에 적용될 경우 원전구조물의 생애주기 성능에 미치는 영향을 소개한다. 최근 내진설계와 더불어 강진발생 예상 지역에 적용을 목적으로 개발되는 면진시스템은 구조물을 장주기화하여 응답가속도를 줄이고 상대변위를 늘려줌으로써 구조물의 안전성을 증진시키는 것으로 알려져 있다. 따라서, 구조물의 안전성이 중요시되는 원전구조물에 면진시스템을 적용하기 위한 연구가 국내에서 진행 중에 있다. 본 연구에서는 원전구조물의 생애주기 성능분석에 있어서 특징을 분석하고, 면진시스템이 적용될 경우 원전구조물의 생애주기성능에 있어서 미치는 영향을 평가함으로써, 도출된 결과를 면진시스템 적용의 정량적인 타당성 평가에 활용할 수 있다.

Development of RCM Framework for Implementation on Safety Systems of Nuclear Power Plant

  • Kim, Tae-Woon;Brijendra Singh;Park, Chang K.;Chang, Tae-Whee;Song, Jin-Bae
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1996년도 춘계학술발표회논문집(2)
    • /
    • pp.631-636
    • /
    • 1996
  • This paper presents a Reliability Centered Maintenance (RCM) framework for implementation on safety system of nuclear power plant (NPP). RCM is a systematic methodology to optimize the surveillance and maintenance tasks for critical components which provides efficiently and effectively reliability of system and safety of plant. Maintenance of the safety systems is essential for its safe and reliable operation. Reliability Centered Maintenance at NPP is the program which assure that plant system remains within original design criteria and that is not adversely affected during the plant life time. Aim of this paper is to provide the RCM framework to implement it on safety systems. RCM framework is described in four major steps.

  • PDF

건설원전 형상관리를 위한 통합변경프로세스 연구 (Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant)

  • 박유진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

원자력 발전소의 조직 및 인적 인자 영향관계 모델개발 (The causal loop digaram for organizational and human factors in nuclear power plant)

  • 유재국;안남성;곽상만
    • 한국시스템다이내믹스연구
    • /
    • 제2권2호
    • /
    • pp.63-84
    • /
    • 2001
  • There are many activities to improve Nuclear Power Plant(NPP) performance and safety such as equipment improvement, redundancy and the like. Since public perception about NPP safety affects nuclear policy of site selection. Recent researches for NPP safety are including not only technical approaches but also social ones. In. this contexture, the purpose of this study is to develope cuassal loop digaram for assessment of organizational and human factors in NPP safety. Through real data from interview with NPP employees we develope causal loop diagram which can explain the relations of cause and effect among variables, and depict social system for organizational and human factors in NPP safety.

  • PDF

납-고무 받침에 의해 면진된 원전구조물의 응답에 대한 Bouc-Wen 모델 및 지진특성의 영향 (Effect of Bouc-Wen Model and Earthquake Characteristics for Responses of Seismically Isolated Nuclear Power Plant by Lead-Rubber Bearing)

  • 송종걸;손민균
    • 한국지진공학회논문집
    • /
    • 제21권2호
    • /
    • pp.95-103
    • /
    • 2017
  • In order to modeling seismic isolation system such as lead-rubber bearing (LRB), bilinear model is widely used by many researchers. In general, an actual force-displacement relationship for LRB has a smooth hysteretic shape. So, Bouc-Wen model with smooth hysteretic shape represents more accurately actual hysteretic shape than bilinear model. In this study, seismic responses for seismically isolated nuclear power plant (NPP) with LRB modelled by Bouc-Wen and bilinear models are compared with those of NPP without seismic isolation system. To evaluate effect of earthquake characteristics for seismic responses of NPP isolated by LRB, 5 different site class earthquakes distinguished by Geomatrix 3rd Letter Site Classification and artificially generated earthquakes corresponding to standard design spectrum by Reg. Guide 1.60 are used as input earthquakes. From the seismic response results of seismically isolated NPP, it can be observed that maximum displacements of seismic isolation modelled by Bouc-Wen model are larger than those by bilinear model. Seismic responses of NPP with LRB is significantly reduced than those without LRB. This reduction effect for seismic responses of NPP subjected to Site A (rock) earthquakes is larger than that to Site E (soft soil) earthquakes.