신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 - (Improvement method of process management on new han-ok style public building project)

  • 서정승;김영훈;곽동엽
    • KIEAE Journal
    • /
    • 제17권3호
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

Importance of Construction Sequence in Numerical Modeling for Underground Structure

  • Park, Yang-Hoo;Cho, Kook-Hwan
    • International Journal of Railway
    • /
    • 제9권1호
    • /
    • pp.21-26
    • /
    • 2016
  • When excavation under existing structure is planned for a new construction project, the underpinning method is one of the most applicable construction methods. This study introduces a new modified underpinning method which is applied to construct a new subway line in Seoul Metropolitan. The new subway line was designed to pass underneath the existing subway line. Existing subway line carries about 2 million passengers daily, which is 33% of total passengers using subway in Seoul, and is the only circulation line in Seoul. Subway trains are passing 540 times through this section in a day. By applying a new underpinning method, the subway box structure of line is exposed 54m in the air supported by bearing piles. The proposed method was carefully monitored using heavy instrumentation system during construction. This study proposed and verified the application of the modified underpinning method, which can reduce construction period by 1.5 times and the construction cost by 1.2 times comparing with conventional method. The importance of considering construction sequence is investigated and verified by analyzed data non-considering construction sequence. The unexpected heaving which can bring up a dangerous situation for train running stability were measured, so this study shows that the upward movement has to be analyzed in designing process. As the use of underground space increases, the proposed method can be a good example of underground development.

AN INTRODUCTION OF NEW SCHEDULING SOFTWARE "BEELINER" BASED ON THE BEELINE DIAGRAMMING METHOD (BDM)

  • Seon-Gyoo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.391-396
    • /
    • 2013
  • As the construction environment has been changing all the times, the techniques for managing the construction projects have been improved accordingly. The schedule management technique, one of the construction management tools, has been evolved as well in order to be adaptable to new construction environment. Most of newly proposed scheduling techniques have been based on the Critical Path Method (CPM) that was proposed in 1956. The CPM is classified into two categories, Arrow Diagramming Method (ADM) and Precedence Diagramming Method (PDM). ADM is so good in the visual format but it cannot express the overlapping relationships between two consecutive activities. On the other hand, PDM can express the overlapping relationships but it is unsatisfactory in the visual format. Recently, as the construction environment becomes more complex and the role of schedule management becomes more and more important, the overlapping expression becomes one of critical factors for scheduling as well. Most of construction project participants prefer more comfortable visual format, however, the scheduling software based on the PDM cannot satisfy their basic requirement. Beeliner, new scheduling software based on the Beeline Diagramming Method (BDM) that was proposed in 2010, was developed in 2012, it can express more flexible overlapping relationships and has superior visual format as well. This paper presents major features and applications of Beeliner, and makes construction professionals understand new scheduling concept and its applications.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

3차원 디지털 설계를 통한 비정형 콘크리트 구조물의 구현기술 개발 (Development of the Free-formed Concrete Structure Construction Technologies using 3D Digital Design)

  • 박영미;조성준;김성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.205-208
    • /
    • 2012
  • Recent the free-formed architecture is smearing as a trend with the development of the digital equipment and technologies. The development of new method based on digital technology is required for the free-formed structure,, because the conventional construction methods are limited to shorten the construction period and to ensure the construction quality. Particularly, the development of the new method for the free-formed concrete structure is important. In this study, the developed method of the T-shape lightweight steel fabricated using CNC can control the geometries of the free-formed concrete structure based on the digital design. Also, new method is effective to ensure the precision of the construction and economic than the conventional construction methods.

  • PDF

경계석과 L형 측구의 간편 시공법 개발 (Development of Simple Construction Method for Curbs and L-Type Gutter)

  • 백규호;신영옥
    • 대한토목학회논문집
    • /
    • 제26권6D호
    • /
    • pp.961-968
    • /
    • 2006
  • 도로의 가장자리에 설치되는 경계석과 측구는 교통사고로부터 보행자를 보호하고 강우로 인한 차량의 미끄러짐을 방지하는 중요한 구조물이다. 그러나 경계석과 측구를 시공함에 있어 대부분의 공정을 인력으로 수행하는 기존 시공법은 작업성과 시공품질, 시공비 등의 측면에서 많은 문제점을 안고 있다. 본 연구에서는 기존 시공법이 갖고 있는 많은 문제점들을 해결할 수 새로운 시공법을 개발하였다. 새로운 공법으로 시공된 경계석과 측구의 구조적인 안정성과 시공품질을 확인하기 위하여 기존공법과 신공법으로 시공된 경계석에 대해서 인발과 수평재하시험을 실시함과 동시에 기존공법과 신공법으로 시공된 측구에서 채취된 콘크리트 시편에 대해 일축압축시험도 실시하였다. 시험결과 신공법으로 시공된 경계석의 선형과 측구콘크리트의 강도는 크게 향상되었으며, 신공법으로 시공된 경계석의 인발 및 수평저항력은 기존공법으로 시공된 경우보다 각각 10.7배와 2.5배 큰 것으로 나타났다.

이동 로봇의 주행을 위한 새로운 지도 구성 방법 및 경로 계획에 관한 연구 (A Study on New Map Construction and Path Planning Method for Mobile Robot Navigation)

  • 오준섭;박진배;최윤호
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제49권9호
    • /
    • pp.538-545
    • /
    • 2000
  • In this paper we proposed a new map construction and path planning method for mobile robot. In our proposed method first we introduced triangular representation map that mobile robot can navigate through shorter path and flexible motion instead of grid representation map for mobile robot navigation. method in which robot can navigate complete space through as short path as possible in unknown environment is proposed. Finally we proposed new path planning method in a quadtree representation map. To evaluate the performance of our proposed new path planning method in a quadtree representation map. To evaluate the performance of our proposed triangular representation map it was compared with the existing distance transform path planning method. And we considered complete coverage navigation and new path planning method through several examples.

  • PDF

초대형 콘크리트 케이슨 다단계 일괄 제작 및 운반공법 개발 (II) (Concrete Caisson Manufacturing and Transferring Apparatus and Method (II))

  • 정지만;이원표;박중민
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 춘계 학술발표회 제16권1호
    • /
    • pp.400-403
    • /
    • 2004
  • In conventional methods, the availability of floating crane has determined the size of a concrete caisson. However, this paper introduces a new method for larger caisson production that make it possible to complete caisson fabrication and launch out without use of floating crane. The new method carries out multi-step fabrication of caisson and horizontal transfer of caisson on a single casting bed which consists of collapsible soffit form, trough, aero go watercaster system or low frictional PTFE added jacking system, half-submergible floating dock. To make the new method successfully launched, the static and dynamic analysis is carried out to obtain the stability of caisson launching and experimental research is conducted in evaluating friction occurred between PTFE pad and steel track. Lastly, the comparison of the new method and the conventional method are detailed. With significant benefits in construction costs reduction and construction time reduction, this new method in this paper would be recommended for extensive application in large port and harbor construction projects.

  • PDF

A new design method for site-joints of the tower crane mast by non-linear FEM analysis

  • Ushio, Yoshitaka;Saruwatari, Tomoharu;Nagano, Yasuyuki
    • Advances in Computational Design
    • /
    • 제4권4호
    • /
    • pp.343-365
    • /
    • 2019
  • Among the themes related to earthquake countermeasures at construction sites, those for tower cranes are particularly important. An accident involving the collapse of a crane during the construction of a skyscraper has serious consequences, such as human injury or death, enormous repair costs, and significant delays in construction. One of the causes of deadly tower crane collapses is the destruction of the site joints of the tower crane mast. This paper proposes a new design method by static elastoplastic finite element analysis using a supercomputer for the design of the end plate-type tensile bolted joints, which are generally applied to the site joints of a tower crane mast. This new design method not only enables highly accurate and reliable joint design but also allows for a design that considers construction conditions, such as the introduction of a pre-tension axial force on the bolts. By applying this new design method, the earthquake resistance of tower cranes will undoubtedly be improved.

서울 시청사 뜬구조 공법 (Floating & Underground Space Extension Method for New Seoul City Hall)

  • 최영길
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.254-255
    • /
    • 2013
  • New Seoul city hall completed in 1926 is a registered historical building. The remodeling plan has been developed for the expansion after the review by the governmental agency. Based on the plan, a new city hall should be constructed behind the current city hall while the facade, the main lobby and the dorm structure of the existing building, A new construction method, FUSEM, has been developed for this mission for the safety of the historical structure.