• 제목/요약/키워드: network capacity

검색결과 1,899건 처리시간 0.032초

Joint Subcarrier Matching and Power Allocation in OFDM Two-Way Relay Systems

  • Vu, Ha Nguyen;Kong, Hyung-Yun
    • Journal of Communications and Networks
    • /
    • 제14권3호
    • /
    • pp.257-266
    • /
    • 2012
  • A decode-and-forward two-way relay system benefits from orthogonal frequency division multiplexing (OFDM) and relay transmission. In this paper, we consider a decode-and-forward two-way relay system over OFDMwith two strategies: A joint subcarrier matching algorithm and a power allocation algorithm operating with a total power constraint for all subcarriers. The two strategies are studied based on average capacity using numerical analysis by uniformly allocating power constraints for each subcarrier matching group. An optimal subcarrier matching algorithm is proposed to match subcarriers in order of channel power gain for both transmission sides. Power allocation is defined based on equally distributing the capacity of each hop in each matching group. Afterward, a modified water-filling algorithm is also considered to allocate the power among all matching groups in order to increase the overall capacity of the network. Finally, Monte Carlo simulations are completed to confirm the numerical results and show the advantages of the joint subcarrier matching, power allocation and water filling algorithms, respectively.

설비용량을 고려한 계층적 네트워크의 설계 및 분석 (Designing hierarchical ring-star networks under node capacity constraints)

  • 이창호;윤종화;정한욱
    • 한국경영과학회지
    • /
    • 제19권1호
    • /
    • pp.69-83
    • /
    • 1994
  • This paper deals with a capacitated ring-star network design problem (CRSNDP) with node capacity constraints. The CRSNDP is formulated as a mixed 0-1 integer problem, and a 2-phase heuristic solution procedure, ADD & VAM and RING, is developed, in which the CRSNDP is decomposed into two subproblems : the capacitated facility location problem (CFLP) and the traveling sales man problem (TSP). To solve the CFLP in phase I the ADD & VAM procedure selects hub nodes and their appropriate capacity from a candidate set and then assigns them user nodes under node capacity constraints. In phase II the RING procedure solves the TSP to interconnect the selected hubs to form a ring. Finally a solution of the CRSNDP can be achieved through combining two solution of phase I & II, thus a final design of the capacitated ring-star network is determined. The analysis of computational results on various random problems has shown that the 2-phase heuristic procedure produces a solution very fast even with large-scale problems.

  • PDF

Pullout capacity of small ground anchors: a relevance vector machine approach

  • Samui, Pijush;Sitharam, T.G.
    • Geomechanics and Engineering
    • /
    • 제1권3호
    • /
    • pp.259-262
    • /
    • 2009
  • This paper examines the potential of relevance vector machine (RVM) in prediction of pullout capacity of small ground anchors. RVM is based on a Bayesian formulation of a linear model with an appropriate prior that results in a sparse representation. The results are compared with a widely used artificial neural network (ANN) model. Overall, the RVM showed good performance and is proven to be better than ANN model. It also estimates the prediction variance. The plausibility of RVM technique is shown by its superior performance in forecasting pullout capacity of small ground anchors providing exogenous knowledge.

An Architecture of Scalable ATM Switching System and Its Call Processing Capacity Estimation

  • Kim, Young-Boo;Lee, Soon-Seok;Oh, Chang-Hwan;Kim, Young-Sun;Han, Chi-Moon;Yim, Chu-Hwan
    • ETRI Journal
    • /
    • 제18권3호
    • /
    • pp.107-125
    • /
    • 1996
  • In this paper, we define the general requirements of ATM switching systems such as scalability, distributed fashion, and modularity. Also we propose a practical implementation of a scalable ATM switching system whose capacity can be easily expanded. Firstly, the architecture of the system is discussed with an emphasis on system scalability, modularity of subsystems and the simple control network of the design requirements. Secondly, we suggest the three types of distributed call/connection control schemes that are suitable for our switching system. We also estimate their call processing capacity on the average and make a comparison of them under the various system architectures. Since our scalable switching system can be constructed to perform the call processing functions on the various levels of the system capacity, it has much adaptability at the various evolution phases or regions of the network environment.

  • PDF

A Cognitive Radio based Multi-hop Relay Cellular Network

  • Hassan, Md. Imrul;Song, Ju-Bin;Kim, Young-Il
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2007년도 하계종합학술대회 논문집
    • /
    • pp.97-98
    • /
    • 2007
  • In this paper, we investigate the throughput capacity of a multi-hop relay network with cognitive radio (CR) enabled relay stations (RS). We suggested a TDMA/FDMA based frame structure where RSs dynamically select unused channels to communicate with the base station (BS) using CR techniques to analyze the throughput capacity. We developed the throughput capacity model for the proposed system based on utilization factor. The analytical results based on those equations show significant improvement in throughput capacity for CR enabled multi-hop relay system.

  • PDF

TDX-1스윗칭 네트워크의 통화량

  • 오돈성;박권철
    • 한국통신학회:학술대회논문집
    • /
    • 한국통신학회 1986년도 춘계학술발표회 논문집
    • /
    • pp.142-145
    • /
    • 1986
  • The traffic characteristics of digital switch network depend on the structure, blocking probability, path searching method and etc. This paper presents the study of TDX-1 switch network traffic capacity by considering some decisive factors such as call processing software, switch network structure and control scheme. Conclusively the study shows that the switch network of TDX-1 can handle approximatly up to 1650 Erlang.

  • PDF

함정용 멀티미디어 통합통신망을 위한 트래픽 및 링크용량 예측 (Traffic Consideration and Link Capacity Estimation for Integrated Multimedia Network of The Naval Ship)

  • 이채동;신우섭;김석찬
    • 대한전자공학회논문지TC
    • /
    • 제49권5호
    • /
    • pp.99-106
    • /
    • 2012
  • 함정의 운용 효율성을 높이기 위해서 한국 해군은 음성통신위주의 함내외 통합통신체계(ICS:Integrated Communication System)을 운용해 오고 있으며, 최근에는 음성, 영상, 문자 등이 포함된 멀티미디어 통합통신망에 대한 적용을 고려하고 있다. 본 논문은 함정용 멀티미디어 통합통신망을 구축하기 위한 기초연구로써 한국 해군의 함정 내 여러 통신망 중에서 통합통신망에 적용할 통신망을 구분하고, 구분된 통신망에서 운용중인 멀티미디어 트래픽의 종류 및 특성들을 고찰한다. 아울러 ICS 통신교환기에서의 트래픽 입력소스 수에 따른 링크용량을 예측하기 위해서 트래픽 다중화 모델을 제안하고, 한국 해군의 주요 함정 별 트래픽의 링크용량 산출 및 통합 트래픽을 분석한다.

경량전철 전력공급시스템의 용량 산정에 관한 연구 (A Study on Capacity Calculation of Power Supply System for Light Rail Transit)

  • 백병산;서광덕;김종구
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.696-703
    • /
    • 2000
  • This paper describes the capacity calculation of power supply system for light Rail Transit Three factors are considered for the design i.e. substation arrangements, line configuration and substation power capacity. In this study, we considered all of them for capacity calculation of power supply system for LRT. At first DC-fed-traction system is introduced on an outline, a characteristics of train and fed network, and design method of substation arrangements. Optimal design procedures are described, and program for capacity calculation of the system is presented. In addition, the computer simulated results are computed with the conventional simple calculation method.

  • PDF

Study on Application of Superconducting Fault Current Limiter Considering Risk of Circuit Breaker Short-Circuit Capacity in a Loop Network System

  • Kim, Jin-Seok;Lim, Sung-Hun;Kim, Jae-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.1789-1794
    • /
    • 2014
  • This paper suggests an application method for a superconducting fault current limiter (SFCL) using an evaluation index to estimate the risk regarding the short-circuit capacity of the circuit breaker (CB). Recently, power distribution systems have become more complex to ensure that supply continuously keeps pace with the growth of demand. However, the mesh or loop network power systems suffer from a problem in which the fault current exceeds the short-circuit capacity of the CBs when a fault occurs. Most case studies on the application of the SFCL have focused on its development and performance in limiting fault current. In this study, an analysis of the application method of an SFCL considering the risk of the CB's short-circuit capacitor was carried out in situations when a fault occurs in a loop network power system, where each line connected with the fault point carries a different current that is above or below the short-circuit capacitor of the CB. A loop network power system using PSCAD/EMTDC was modeled to investigate the risk ratio of the CB and the effect of the SFCL on the reduction of fault current through various case studies. Through the risk evaluations of the simulation results, the estimation of the risk ratio is adequate to apply the SFCL and demonstrate the fault current limiting effect.

택배 네트워크 설계를 위한 최적화/시뮬레이션 반복기법 : 화물터미널 용량과 수주마감시간 결정 (A Recursive Optimization/Simulation Procedure for Express Courier Service Network Design : Determination of Terminal Capacity and Cut-off Time)

  • 고창성;이희정
    • 대한산업공학회지
    • /
    • 제33권2호
    • /
    • pp.282-289
    • /
    • 2007
  • While demands for express couriers service are rapidly increasing due to recent progress of electronic commerce, express courier service companies are struggling to take a larger market share through ongoing improvement in their service processes. Cut-off time is the time limit that all orders delivered before the limit are guaranteed for the delivery within the very next day. Extending cut-off time for express service centers can provide the express company with increase of total sales, but it may also cause increasing the possibility not to satisfy customer needs due to work delay in the consolidation terminal. We develop a design model for express courier service network based on a recursive optimization/simulation procedure. With the optimization model, we seek key design parameters such as the cut-off time for express service centers and the capacity of the consolidation terminal maximizing total sales profit while satisfying the desired level of performances. With the simulation model, we consider the dynamic nature of the network and obtain relationships between the design parameters and the performance measures with the multiple linear regression. The validity of the model is examined with an example.