• 제목/요약/키워드: multi-span bridge

검색결과 153건 처리시간 0.018초

지진하중에 대한 다경간 교량의 비탄성 변위응답 평가 (Evaluation of Inelastic Displacement Response for Multi-Span Bridge Structures Subjected to Earthquakes)

  • 송종걸;남왕현;정영화
    • 산업기술연구
    • /
    • 제24권A호
    • /
    • pp.195-204
    • /
    • 2004
  • To evaluate inelastic seismic responses of multi-span bridge structures, the capacity spectrum method(CSM) incorporating the equivalent single-degree-of freedom(ESDOF) method is presented. Application of the CSM incorporating the ESDOF method is illustrated by example analysis for symmetric and asymmetric bridge structures. To investigate an accuracy of the CSM, the maximum displacements estimated by the CSM are compared to those by inelastic time history analysis for several artificial earthquakes. The results show that the CSM provided conservative estimates of the maximum displacements for the symmetric and asymmetric bridge structures, and the trend of conservative estimates of the asymmetric bridge structures was significantly larger than that of the symmetric bridge structure.

  • PDF

멀티 GPS 센서를 이용한 장대교량의 형상관리시스템 개발에 관한 연구 (A Study on the Configuration Management System of Long Span Bridge Using Multi GPS Sensor)

  • 최병길;나영우
    • 한국측량학회지
    • /
    • 제27권3호
    • /
    • pp.385-392
    • /
    • 2009
  • 본 연구의 목적은 멀티 GPS 센서를 이용하여 장대교량의 형상을 실시간으로 모니터링 하고 관리 할 수 있는 방안에 대하여 연구하는데 있다. 멀티 GPS 센서를 장대교량의 주요 지점에 설치하고 변위를 실시간으로 측정함으로써 장대교량의 3차원적인 형상거동을 관리 할 수 있을 것으로 판단된다. 본 연구에서 개발한 형상관리시스템은 교량의 전체적, 지점별 변위정보를 수치화, 시각화하고 위험발생에 따라 능동적으로 대응이 가능하며 측정데이터의 DB화를 통해서 계측정보를 실시간으로 관리하고 제공 할 수 있을 것으로 판단된다. 또한 GPS센서를 이용한 형상관리시스템은 GPS 센서를 이용한 장대교량의 3차원 절대변위 및 거대변위의 효과적인 측정에 의한 교량의 전체적인 형상관리에 활용할 수 있을 것으로 판단된다.

장경간 사장교에 적용된 일부타정식 케이블 시스템의 지진하중과 풍하중 안전성 향상 효과 분석 (Effects of Partially Earth Anchored Cable System on Safety Improvement for a Long-span Cable-stayed Bridge under Seismic and Wind Load)

  • 원정훈;이형도
    • 한국안전학회지
    • /
    • 제31권4호
    • /
    • pp.97-103
    • /
    • 2016
  • This study investigates effects of partially earth anchored cable system on the structural safety for a long-span cable-stayed bridge under dynamic loads such as seismic and wind load. For a three span cable-stayed bridge with a main span length of 810 m, two models are analyzed and compared; one is a bridge model with a self anchored cable system, the other is a bridge model with a partially earth anchored cable system. By performing multi-mode spectrum analysis for a prescribed seismic load and multi-mode buffeting analysis for a fluctuating wind component, the structural response of two models are compared. From results, the partially earth anchored cable system reduce the maximum pylon moment by 66% since earth anchored cables affect the natural frequencies of girder vertical modes and pylon longitudinal modes. In addition, the girder axial forces are decreased, specially the decrement of the axial force is large in seismic load, while girder moment is slightly increased. Thus, the partially earth anchored cable system is effective system not only on reduction of girder axial forces but also improvement of structural safety of a cable-stayed bridge under dynamic loads such as seismic and wind loads.

Study on economic performances of multi-span suspension bridges part 1: simple estimation formulas

  • Zhang, Li-Wen;Xiao, Ru-Cheng;Sun, Bin;Jiang, Yang;Zhang, Xue-Yi;Zhuang, Dong-Li;Zhou, Yun-Gang;Tu, Xue
    • Structural Engineering and Mechanics
    • /
    • 제47권2호
    • /
    • pp.265-286
    • /
    • 2013
  • A study on economic performances of consecutive multi-span suspension bridges is carried out. In this part of the study, material amount and structural cost estimation formulas of the bridges is derived based on the structural ultimate carrying capacity. The bridge cost includes the part of superstructure and the part of substructure. Three types of bridge foundations, bored piles, concrete caissons and floating foundations, are considered in substructure. These formulas are to be used for the parametric study of the bridge cost in order to define its more economical layout under different conditions in the part two of the study.

Analysis of effects of shrinkage of concrete added to widen RC girder bridge

  • Madaj, Arkadiusz;Siekierski, Wojciech
    • Computers and Concrete
    • /
    • 제23권5호
    • /
    • pp.329-334
    • /
    • 2019
  • Traffic flow capacity of some old road bridges is insufficient due to limited deck width. In such cases bridge deck widening is a common solution. For multi-girder reinforced concrete (RC) bridges it is possible to add steel-concrete composite girders as the new outermost girders. The deck widening may be combined with bridge strengthening thanks to thickening of the existing deck slab. Joint action of the existing and the added parts of such bridge span must be ensured. It refers especially to the horizontal plane at the interface of the existing slab and the added concrete layer as well as to the vertical planes at the external surfaces of the initially outermost girders where the added girders are connected to the existing bridge span. Since the distribution of the added concrete is non-uniform in the span cross-section the structure is particularly sensitive to the added concrete shrinkage. The shrinkage induces shear forces in the aforementioned planes. Widening of a 12 m long RC multi-girder bridge span is numerically analysed to assess the influence of the added concrete shrinkage. The analysis results show that: a) in the vertical plane of the connection of the added and the existing deck slab the longitudinal shear due to the shrinkage of the added concrete is comparable with the effect of live load, b) it is necessary to provide appropriate longitudinal reinforcement in the deck slab over the added girders due to tension induced by the shrinkage of the added concrete.

일부타정식 케이블 시스템 장경간 사장교의 시공 중 동적 안전성 분석 (Structural Safety Analysis of a Long Span Cable-stayed Bridge with a Partially Earth Anchored Cable System on Dynamic Loads during Construction)

  • 원정훈;김경윤
    • 한국안전학회지
    • /
    • 제31권4호
    • /
    • pp.104-110
    • /
    • 2016
  • The effect of a partially earth anchored cable system on the structural safety of a long span cable-stayed bridge under seismic and wind loads are examined during construction process. By assuming the FCM (free cantilever method) construction stages with structural vulnerability, a multi-mode spectral analysis and a multi-mode buffeting analysis are performed for specific seismic load and wind load, respectively. Results show that the wind load dominates the structural safety of a cable-stayed bridge during construction. And, the application of a partially earth anchored cable system can enhance structural safety under wind load since the maximum pylon moment in the model with partially earth anchored cable system is reduced by 49% under wind load. In contrast, the maximum pylon moment occurred by seismic load is only decreased by 8%.

Evaluation of multi-lane transverse reduction factor under random vehicle load

  • Yang, Xiaoyan;Gong, Jinxin;Xu, Bohan;Zhu, Jichao
    • Computers and Concrete
    • /
    • 제19권6호
    • /
    • pp.725-736
    • /
    • 2017
  • This paper presents the two-, three-, and four-lane transverse reduction factor based on FEA method, probability theory, and the recently actual traffic flow data. A total of 72 composite girder bridges with various spans, number of lanes, loading mode, and bridge type are analyzed with time-varying static load FEA method by ANSYS, and the probability models of vehicle load effects at arbitrary-time point are developed. Based on these probability models, in accordance to the principle of the same exceeding probability, the multi-lane transverse reduction factor of these composite girder bridges and the relationship between the multi-lane transverse reduction factor and the span of bridge are determined. Finally, the multi-lane transverse reduction factor obtained is compared with those from AASHTO LRFD, BS5400, JTG D60 or Eurocode. The results show that the vehicle load effect at arbitrary-time point follows lognormal distribution. The two-, three-, and four-lane transverse reduction factors calculated by using FEA method and probability respectively range between 0.781 and 1.027, 0.616 and 0.795, 0.468 and 0.645. Furthermore, a correlation between the FEA and AASHTO LRFD, BS5400, JTG D60 or Eurocode transverse reduction factors is made for composite girder bridges. For the two-, three-, and four-lane bridge cases, the Eurocode code underestimated the FEA transverse reduction factors by 27%, 25% and 13%, respectively. This underestimation is more pronounced in short-span bridges. The AASHTO LRFD, BS5400 and JTG D60 codes overestimated the FEA transverse reduction factors. The FEA results highlight the importance of considering span length in determining the multi-lane transverse reduction factors when designing two-lane or more composite girder bridges. This paper will assist bridge engineers in quantifying the adjustment factors used in analyzing and designing multi-lane composite girder bridges.

다경간 연속교에 대한 면진용 교좌장치의 내진성능 비교연구 (A comparative study on aseismic performances of base isolation systems for multi-span continuous bridge)

  • Park, Kyu-Sik;Lee, Chong-Heon;Lee, In-Won
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.383-390
    • /
    • 2001
  • Various base isolation systems, which are widely used, are compared for aseismic performances of multi-span continuous bridge. They are the P-F, RB, LRB, R-FBI and EDF systems. Sensitivity analyses are carried out to determine the design parameters of various devices. The design parameters, natural period of the isolated bridge and friction coefficient of the bearing, are determined by the reciprocal relationship between displacement and bending moment of the structure. Then the relative effectiveness of the bearings is described. Bridge with the R-FBI system shows the smallest peak displacement of deck whereas bridge with the EDF system shows the smallest peak bending moment of the lower end of pier in numerical examples. Furthermore, the peak responses of bridge with the friction type bearing are less sensitive to substantial variations in the frequency range and intensity of the ground excitation than those with the rubber type bearing.

  • PDF

전단키를 이용한 다경간 연속교의 내진성능 향상 방법 (Seismic Upgrading of Multi-Span continuous Bridges using Shear Keys)

  • 김재관
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 1999년도 추계 학술발표회 논문집 Proceedings of EESK Conference-Fall
    • /
    • pp.313-318
    • /
    • 1999
  • The seismic performance of multi-span bridge without seismic detailing is found to be insufficient in longitudinal direction. Shear keys and stoppers can be introduced as an alternative to enhance seismic capacity. The capacity curve of bridge with shear keys is obtained considering two extreme contact conditions of shear keys. Its curve is converted into ADRS spectra and compared with demand spectra. It is concluded that seismic performance can be improved effectively by shear keys and its performance can be evaluated graphically on the ADRS specta.

  • PDF

부분 인장형 사장교 주형의 복합 구조 (Hybrid Deck System for Partially Earth Anchored Cable Stayed Bridges)

  • 조재영;노정휘;김정중
    • 복합신소재구조학회 논문집
    • /
    • 제4권4호
    • /
    • pp.30-36
    • /
    • 2013
  • Partially earth anchored (PEA) can improve the structural safety and economic feasibility of multiple span cable stayed bridge (CSB). The PEA-CSB can restrain axial compressive load acting on a tower and reduce the global buckling length of a stiffened girder. For these reasons, structural members subject to axial forces can be effectively utilized and material quantity required for a steel deck can be reduced to save construction cost. In this study, the PEA system was verified for its application on a multiple span CSB. The CSB is a four-tower multi-span bridge which has a main span length of 500 m. As high tensile stress was generated at the top of the bridge decks at the mid-span between two main columns, a hybrid deck system for enhancing the bridge deck sections was proposed. While the composite sections made of concrete and steel were used near to the main columns, steel sections were used at the mid-span between two main columns.