• 제목/요약/키워드: mountain train

검색결과 20건 처리시간 0.031초

Running safety of metro train over a high-pier bridge subjected to fluctuating crosswind in mountain city

  • Zhang, Yunfei;Li, Jun;Chen, Zhaowei;Xu, Xiangyang
    • Structural Engineering and Mechanics
    • /
    • 제76권2호
    • /
    • pp.207-222
    • /
    • 2020
  • Due to the rugged terrain, metro lines in mountain city across numerous wide rivers and deep valleys, resulting in instability of high-pier bridge and insecurity of metro train subjected to fluctuating crosswind. To ensure the safe operation in metro lines in mountain cities, running safety of the metro train over the high-pier bridge under crosswind is analyzed in this paper. Firstly, the dynamic model of the wind-train-bridge (WTB) system is built, in which the speed-up effect of crosswind is fully considered. On the basis of time domain analysis, the basic characteristics of the WTB system with high-pier are analyzed. Afterwards, the dynamic responses varies with train speed and wind speed are calculated, and the safety zone of metro train over a high-pier bridge subjected to fluctuating crosswind in mountain city is determined. The results indicate that, fluctuating crosswind triggers drastic vibration to the metro train and high-pier bridges, which in turn causes running instability of the train. For this reason, the corresponding safety zone for metro train running on the high-pier is proposed, and the metro traffic on the high-pier bridge should be closed as the mean wind speed of standard height reaches 9 m/s (15.6 m/s for the train).

Shear anchor behavior and design of an embedded concrete rack rail track for mountain trains

  • Hyeoung-Deok Lee;Jong-Keol Song;Tae Sup Yun;Seungjun Kim;Jiho Moon
    • Computers and Concrete
    • /
    • 제33권4호
    • /
    • pp.373-384
    • /
    • 2024
  • In this study, a novel mountain train system was developed that can run along a steep gradient of 180 ‰ and sharp curve with a minimum radius of 10 m. For this novel mountain train, an embedded precast concrete rack rail track was implemented to share the track with an automobile road and increase constructability in mountainous regions. The embedded rack rail track is connected to a hydraulically stabilized base (HSB) layer with shear anchors, which must have sufficient longitudinal resistance because they bear most of the traction forces originated from the rack rail and longitudinal loads owing to the steep gradient. In addition, the damage to the shear anchor parts, including the surrounding concrete, must be strictly limited under the service load because the maintenance of shear anchors inside the track is extremely difficult after installation. In this study, the focus was made on the shear anchor behavior and design an embedded rack rail track, considering the serviceability and ultimate limit states. Accordingly, the design loads for mountain trains were established, and the serviceability criteria of the anchor were proposed. Subsequently, the resistance and damage of the shear anchors were evaluated and analyzed based on the results of several finite element analyses. Finally, the design method of the shear anchors for the embedded rack rail track was established and verified.

산악열차 운행에 관한 연구 (A Study on a mountain train operation)

  • 손영진;정수영;이종성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.632-642
    • /
    • 2007
  • 우리나라는 남북간 거리가 약 1,200km, 동서간 거리가 약 840km인 반도국가이다. 이 국토의 철도교통 인프라로 고속열차 KTX와 장거리용 일반열차, 그리고 대도시 지하철이 있을 뿐이다. 전 국토의75%가 산악지역에 분포된 우리나라에 관광 및 지역간 교통 수송을 담당하는 산악열차가 아직 운행되지 않고 있다는 것은 아쉬운 점이다. 국토 균형 발전 정책과 철도 인프라 구축 우선 정책의 원칙을 고려하여, 우선 3호선 구파발 역에서 북한산을 경유하고 4호선 쌍문 역 구간을 운행하는 산악열차를 건설한다면 관광 측면은 물론 서울의 서북지역과 동북지역을 관통하는 지선 역할 측면에서 모범이 될 수 있다고 본다. 설계, 건설, 운영의 친환 경성도 확보될 수 있음은 물론이다.

  • PDF

이용자 연령별 지불의사 수준에 따른 북한산 산악철도 경제성 변화 연구 (Study on the change in Economic Efficiency for Developing Mountain Railway Based on User's Willingness to Pay by Age)

  • 이종성;엄진기;문대섭;이희성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1310-1319
    • /
    • 2010
  • This paper has shown that Linear Induction Motor(LIM) and Rack and pinion type are efficient in selecting railway routes and systems after considering time, geo-spatial characteristics and the floating population by benchmarking domestic and overseas mountain trains. The benefit-cost analysis through the use of modeling on user's willingness to pay is conducted as a means that provides access to tourism resources. this paper concludes that the benefit-cost varies in response to changes in the amount of user's willingness to pay by age. It is expected that this paper serves as a reference data in the introduction stage of the mountain train project implemented by central or local governments with tourism resources in mountainous areas as the mountain train has turned out to be economically efficient while various potential benefits that have not been included in the benefit-cost analysis need to be quantified and remain to be studied further.

  • PDF

북한산 산악철도 개발의 경제성 분석 연구 (Study on the Economic Analysis for Developing Bukhansan Mountain Train)

  • 이종성;송문석
    • 한국산학기술학회논문지
    • /
    • 제16권7호
    • /
    • pp.4969-4976
    • /
    • 2015
  • 우리나라는 국토의 약 2/3이상이 산악지형으로 이루어져 있으며 산악지역의 자연공원을 관광 자원화 하여 수혜를 원하는 사람들에게 접근성이 용이하도록 정책을 활성화할 필요가 있다. 이러한 여건을 감안하고 국토의 균형발전과 철도 인프라구축 정책원칙 우선 적용을 위한 일환으로 산악지역 중 가장 실효성과 경제성이 있을 것으로 예상되는 북한산에 대해 산악관광열차로서의 도입시 이용자 지불의사 수준에 관한 대안을 적용하여 산악철도에 대한 경제성 변화를 연구 하였다. 분석결과 LIM(선형유도모터) 과 랙&피니언 시스템의 편익비용비가 각각 0.73, 0.8로 나타났으며, 랙&피니언방식이 적용가능 한 대안으로, 향후 새로운 신 기술개발이 이루어지고, 노선내 터널을 일부시공 한다면 선형유도모터방식도 가능한 대안으로 검토 되었다.

차량시스템의 틸팅 알고리즘개발 (Development of Tilting Algorithm of Vehicle System)

  • 송용수;김남포;고태환;한성호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(III)
    • /
    • pp.611-616
    • /
    • 2003
  • The application of the tilting train is one of the most efficient ways to increase curving speed of train on existing tracks or on mountain railway lines with sharp curves. It can increase the running speed and ensure the passenger comfort and safety at the same time. Therefore, the development of tilting train has been paid high attention by many countries in the world. Tilting trains have been operated successfully in many countries such as Italy, Spain, Germany, Sweden, England and so on. The tilting trains possess broad prospects in raising speeds. The distributed EMU tilting train set will be developed according to the Korea railway conditions and will be operated on the Honam line, Janghang line and Jungang line. Because there is high percentage of curves on these lines. these lines are suited to operating tilting trains to raising speed and saving passenger traveling time. In order. to improve the curving performance of the tilling train. the active-control algorithm is utilized for the tilting bogie.

  • PDF

Dynamic analysis of metro vehicle traveling on a high-pier viaduct under crosswind in Chongqing

  • Zhang, Yunfei;Li, Jun;Chen, Zhaowei;Xu, Xiangyang
    • Wind and Structures
    • /
    • 제29권5호
    • /
    • pp.299-312
    • /
    • 2019
  • Due to the rugged terrain, metro lines in mountain city across numerous wide rivers and deep valleys, resulting in instability of high-pier bridge and insecurity of metro train under crosswind. Compared with the conditions of no-wind, crosswind triggers severer vibration of the dynamic system; compared with the short-pier viaduct, the high-pier viaduct has worse stability under crosswind. For these reasons, the running safety of the metro vehicle traveling on a high-pier viaduct under crosswind is analyzed to ensure the safe operation in metro lines in mountain cities. In this paper, a dynamic model of the metro vehicle-track-bridge system under crosswind is established, in which crosswind loads model considering the condition of wind zone are built. After that, the evaluation indices and the calculation parameters have been selected, moreover, the basic characteristics of the dynamic system with high-pier under crosswind are analyzed. On this basis, the response varies with vehicle speed and wind speed are calculated, then the corresponding safety zone is determined. The results indicate that, crosswind triggers drastic vibration to the metro vehicle and high-pier viaduct, which in turn causes running instability of the vehicle. The corresponding safety zone for metro vehicle traveling on the high-pier is proposed, and the metro traffic on the high-pier bridge under crosswind should not exceed the corresponding limited vehicle speed to ensure the running safety.

암과 흙 혼합재료로 이루어진 철도노반의 열차 반복하중 작용에 의한 변형특성 (Deformation Characteristics of Crushed Rock-Soil Mixtures of Railway Subgrade under Train Cyclic Loadings)

  • 김대상;박성용;이용일;조국환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.955-963
    • /
    • 2008
  • There are lots of tunnel intervals in the KTX II stage construction line for the linearity of railway line passing mountain region. In order to use the rocks from tunnel excavations, railway subgrades are constructed with crushed rock-soil mixtures. In this study, plain strain test using large scale box was conducted in order to analyze the characteristics of deformation behavior of railway subgrades composed of crushed rock-soil mixtures. The effects of variation of degree of saturation, stress level of applied loadings, and number of loading cycles on the resilient and permanent deformation behavior were analyzed. The results show that degree of saturation have a great effect on the deformation behavior of crushed rock-soil mixtures. The axial strain ranges between $0.1{\sim}0.8%$ with variation of degree of saturation, in assumption that deviatoric stress applied on the subgrade by high-speed train load is 55kPa.

  • PDF

Integrated Navigation Filter Design for Trains Considering the Mounting Misalignment Error of the IMU

  • Chae, Myeong Seok;Cho, Seong Yun;Shin, Kyung Ho
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제10권3호
    • /
    • pp.179-187
    • /
    • 2021
  • To estimate the location of the train, we consider an integrated navigation system that combines Inertial Navigation System (INS) and Global Navigation Satellite System (GNSS). This system provides accurate navigation results in open sky by combining only the advantages of both systems. However, since measurement update cannot be performed in GNSS signal blocked areas such as tunnels, mountain, and urban areas, pure INS is used. The error of navigation information increases in this area. In order to reduce this problem, the train's Non-Holonomic Constraints (NHC) information can be used. Therefore, we deal with the INS/GNSS/NHC integrated navigation system in this paper. However, in the process of installing the navigation system on the train, a Mounting Misalignment Error of the IMU (MMEI) inevitably occurs. In this case, if the NHC is used without correcting the error, the navigation error becomes even larger. To solve this problem, a method of easily estimating the MMEI without an external device is introduced. The navigation filter is designed using the Extended Kalman Filter (EKF) by considering the MMEI. It is assumed that there is no vertical misalignment error, so only the horizontal misalignment error is considered. The performance of the integrated navigation system according to the presence or absence of the MMEI and the estimation performance of the MMEI according to the method of using NHC information are analyzed based on simulation. As a result, it is confirmed that the MMEI is accurately estimated by using the NHC information together with the GNSS information, and the performance and reliability of the integrated navigation system are improved.

기존선 철도구조물 접속부의 보강에 대한 고찰 (A Study of Reinforcement of Railway Structure Approaches in Conventional line)

  • 박준오;이상배;김관형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.442-452
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and this influences passenger's comfort and the safety of operation, and it needs more track maintenance. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF