• 제목/요약/키워드: monitoring and verification

검색결과 460건 처리시간 0.03초

태양열온수기 성능평가를 위한 모니터링 프로그램개발 (Development of monitoring program for performance evaluation in solar_heat hot-water -boiler)

  • 김재열;오율권;곽희열;한재호;송경석;양동조
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 2003년도 춘계학술대회 논문집
    • /
    • pp.260-264
    • /
    • 2003
  • The application of solar energy, in the field of alternative energy, was on the increase tendency. In the case of advanced nations, through continuous R&D, solar-heat hot-water-boiler with high efficiency has been used for the house and the industrial process on business, advanced nations on reached up the experimental stage of solar generation system. But the actual circumstance of the domestic has been not accomplished the popularization of solar-heat hot-water-boiler and the settlement of it which is the fundamental stage of the solar energy usage. This trouble, the domestic was flooded with small enterprise for producing solar-heat hot-water-boiler, was caused by the popularization and the production without verification of performance. To supply the monitoring program for evaluating solar-heat hot-water-boiler, this research was purpose to improve the technical development of the enterprise for producing solar-heat hot-water-boiler and served as an aid f3r the enlargement and the popularization on solar energy.

  • PDF

실증연구를 위한 주택용 태양열 온수기 모니터링 시스템 개발 (The Development of monitoring system for demonstration research of solar hot water heater for dwellings)

  • 양동조;김재열;한재호;송경석;김우진
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 2004년도 추계학술대회 논문집
    • /
    • pp.156-161
    • /
    • 2004
  • The application of solar energy, in the field of alternative energy, was on the increase tendency. In the case of advanced nations, through continuous R&D, solar hot water heater with high efficiency has been used for the house and the industrial process on business, advanced nations were reached up the experimental stage of solar generation system. But, the actual circumstance of the domestic has been not accomplished the popularization of solar hot water heater and the settlement of it which is the fundamental stage of the solar energy usage. This trouble, the domestic was flooded with small enterprise for producing solar hot water heater, was caused by the popularization and the production without verification of performance. To supply the monitoring program for evaluating solar hot water heater, this research was purpose to improve the technical development of the enterprise for producing solar-heat hot-water-boiler and served as an aid for the enlargement and the popularization on solar energy.

  • PDF

상태공간 모형을 이용한 동적 예측 모형 설계 (A Design of One-Stage Dynamic Prediction Model with State Space Model)

  • 고명훈;윤상원;신용백
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.107-114
    • /
    • 1995
  • The objective of this study is to design a one-stage dynamic prediction model with Kalman state space model. For a model verification, it is compared with EWMA(Exponentially Weighed Moving Average) model. The model designed in this research can be extended to process prevention control and quality monitoring.

  • PDF

불확실성을 고려한 다중요소 의사 결정기반의 지중전력구 감시 및 진단 (Power Tunnel Monitoring and Diagnosis Based On Multiple Attribute Making Decision with Uncertainty)

  • 이지혜;김상태;이지훈;김종화
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.349-350
    • /
    • 2015
  • Traditional power tunnel monitoring and diagnosis system provides simple alert in accordance with limits which set by operator using various field installed various sensor measurements. System's algorithm is too simple and it has uncertainty of sensor with error. In this paper, proposed algorithm give operator verification using installed sensor measurements such as environmental sensors for fire prevention because of cable overheat in the power tunnel.

  • PDF

FPGA application for wireless monitoring in power plant

  • Kumar, Adesh;Bansal, Kamal;Kumar, Deepak;Devrari, Aakanksha;Kumar, Roushan;Mani, Prashant
    • Nuclear Engineering and Technology
    • /
    • 제53권4호
    • /
    • pp.1167-1175
    • /
    • 2021
  • The process of automation and monitoring in industrial control system involves the use of many types of sensors. A programmable logic controller plays an important role in the automation of the different processes in the power plant system. The major control units are boiler for temperature and pressure, turbine for speed of motor, generator for voltage, conveyer belt for fuel. The power plant units are controlled using microcontrollers and PLCs, but FPGA can be the feasible solution. The paper focused on the design and simulation of hardware chip to monitor boiler, turbine, generator and conveyer belt. The hardware chip of the plant is designed in Xilinx Vivado Simulator 17.4 software using VHDL programming. The methodology includes VHDL code design, simulation, verification and testing on Virtex-5 FPGA hardware. The system has four independent buzzers used to indicate the status of the boiler, generator, turbine motor and conveyer belt in on/off conditions respectively. The GSM is used to display corresponding message on the mobile to know the status of the device in on/off condition. The system is very much helpful for the industries working on plant automation with FPGA hardware integration.

무인항공기용 전원모니터링장치 설계 및 검증에 관한 연구 (A Study on Design and Verification of Power Monitoring Unit for Unmanned Aerial Vehicle)

  • 우희채;김용태
    • 한국항공우주학회지
    • /
    • 제48권4호
    • /
    • pp.303-310
    • /
    • 2020
  • 본 논문은 무인항공기 전기시스템을 위한 전원모니터링장치에 대해서 기술하고 있으며, 무인항공기에 장착되는 AC/DC 발전기, 전원변환기, 배터리 및 기어박스의 데이터 측정과 임무장비의 전원 ON/OFF 장치를 운용하는 전원모니터링장치에 대한 설계를 기술하였다. 전원모니터링장치는 비행체 전원(발전기, 전원변환기 및 배터리)에 대한 전압과 전류를 측정하고, 기어박스의 압력과 온도를 측정하며, 임무컴퓨터로부터 수신된 임무장비의 전원명령을 수행한다. 전원모니터링장치는 무인항공기 비행체 요구사항을 만족하도록 설계하였으며, 구조/열 해석, 환경/EMI 및 지상/비행시험을 통하여 검증을 수행하였다.

United Electromagnetic Characteristics and Online Monitoring Method of Static Air-gap Eccentricity of Turbo-Generator

  • Tang, Gui-Ji;Ke, Meng-Qiang;He, Yu-Ling;Wang, Fa-Lin
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권6호
    • /
    • pp.1614-1627
    • /
    • 2016
  • The purpose of this paper is to investigate the united Electromagnetic characteristics for the effective monitoring on the static air-gap eccentricity (SAGE) of turbo-generator. Different from other studies, this paper not only studies on the unbalanced magnetic pull (UMP) and the vibration characteristics of the stator and the rotor, but also investigates the harmonic features of the magnetic flux density and the circulating current inside the parallel branches (CCPB). The theoretical calculation, together with the finite-element-method (FEM) simulation and the experiment verification, is taken for a SDF-9 type non-salient generator. It is shown that, when SAGE occurs, apparent double-frequency UMP and vibrations will be produced both on the stator and the rotor, while the CCPB will have an obvious increment at the $1^{st}$ harmonic component. In addition, the amplitude of the magnetic flux density will be of cosine distribution in the circumferential position of the air-gap, while in normal condition it is a constant. Moreover, the pass-band amplitude, together with the $1^{st}$ harmonic of the magnetic flux density, will be enlarged as well. These united electromagnetic characteristics can be used as the diagnosis and monitoring criterion for SAGE.

Remote-Controlled Experiment with Integrated Verification of Learning Outcome

  • Staudt, Volker;Menzner, Stefan;Baue, Pavol
    • Journal of Power Electronics
    • /
    • 제10권6호
    • /
    • pp.604-610
    • /
    • 2010
  • Experiments in electrical engineering should mirror the key components of successful research and development: Understand the basic theory needed, test the resulting concepts by simulation and verify these, finally, in the experiment. For optimal learning outcome continuous monitoring of the progress of each individual student is necessary, immediately repeating those subjects which have not been learned successfully. Classically, this is the task of the teacher. In case of remote-controlled experiments this monitoring process and the repetition of subjects should be automated for optimal learning outcome. This paper describes a remote-controlled experiment combining theory, simulation and the experiment itself with an automated monitoring process. Only the evaluation of the experimental results and their comparison to the simulation results has to be checked by a teacher. This paper describes the details of the educational structure for a remote-controlled experiment introducing active filtering of harmonics. For better understanding the content of the learning material (theory and simulation) as well as the results of the experiment and the underlying booking system are shortly presented.

LoRa 센서네트워크 기반의 무선교량유지관리 시스템 구축 (Bridge Monitoring System based on LoRa Sensor Network)

  • 박진오;박상헌;김경수;박원주;김종훈
    • 한국전산구조공학회논문집
    • /
    • 제33권2호
    • /
    • pp.113-119
    • /
    • 2020
  • 사물인터넷 기반의 센서네트워크는 저렴한 비용으로 효율적으로 교량 등의 시설물 유지관리에 적용할 수 있는 한 방안이다. 본 연구에서는 사물인터넷 통신의 하나인, LoRa LPWAN 기반으로 교량 구조건전성모니터링을 위한 시스템을 개발하기 위해서 케이블 장력 모니터링을 위한 센서보드, 기존 계측 센서들과 함께 센서네트워크를 구축하기 위한 DAQ 보드, 데이터들 처리하고 LoRa 통신을 위한 스마트센서노드를 설계 및 제작하였으며 모니터링을 위한 센서네트워크를 구축하였다. 또한 본 시스템의 성능검증을 위해 영광대교에 Test Bed를 구축하여 교량 구조건전성 모니터링을 위한 센서네트워크에 적용가능성 여부를 살펴보았다. Test Bed 검증 결과 LoRa LPWAN 기반 센서네트워크는 데이터 전송률, 정확도, 경제성면에서 교량 구조 건전성 모니터링의 기술 중에 하나로 적용될 수 있으며, 향후 교량구조물 뿐만 아니라 다양한 공공기반 시설물에 유지관리를 위한 시스템으로 보급될 수 있기를 기대한다.

Time-lapse Resistivity Investigations for Imaging Subsurface Grout during Ground Stabilization

  • Farooq, Muhammad;Park, Sam-Gyu;Kim, Jung-Ho;Song, Young-Soo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2007년도 공동학술대회 논문집
    • /
    • pp.241-244
    • /
    • 2007
  • Cement-grouts are injected into limestone cavities beneath the road in the project area, in order to improve strength and reduce permeability; the extent to which grout has penetrated in cavities need to be monitored in order to determined effectiveness of cement-grout. Geophysical approaches, offer great potential for monitoring the grout injection process in a fast and cost-effective way as well as showing whether the grout has successfully achieved the target. This paper presents the ability of surface electrical resistivity to investigate the verification of the grout placement. In order to image the cement-grout, time-lapse surface electrical resistivity surveys were conducted to compare electrical resistivity images before and after injection. Cement-grout was imaged as anomalies exhibiting low resistivity than the surrounding rocks. In accordance with field monitoring, laboratory study was also designed to monitor the resistivity changes of cement-grout specimens with time-lapse. Time-lapse laboratory measurements indicated that electrical methods are good tool to identify the grouted zone. Pre-and post grouting electrical images showed significant changes in subsurface resistivity at grouted zone. The study showed that electrical resistivity imaging technology can be a useful tool for detecting and evaluating changes in subsurface resistivity due to the injection of the grout.

  • PDF