• 제목/요약/키워드: modular unit structure

검색결과 54건 처리시간 0.028초

도로 주행 시험을 통한 모듈러 유닛의 진동 특성 분석 (Analysis of Vibration Characteristics of Modular Unit by Road Test)

  • 곽명근;백정훈;설욱제
    • 대한건축학회논문집:계획계
    • /
    • 제35권1호
    • /
    • pp.29-35
    • /
    • 2019
  • The unit modular system is a type of prefabricated construction method that completes the building by uniting the modular units on site by transporting the unit module structure manufactured in the factory to the site. Since the unit module structure is not only the frame but also the finished form including the inner and outer materials, it is most likely to be brought into the field. Therefore, not only the damage of the inner and outer materials but also deformation of frame structure due to the vibration generated during the transportation of the vehicle, And it is necessary to take appropriate methods when transporting the module structure. However, there are no methods to prevent modular structure damage due to vehicle vibration in domestic and foreign modular transportation guidelines or standards. In this study, we investigate the vibrations during the vehicle transportation of the module structure through the road driving test, identify the vibration frequency characteristics of the vehicle through FFT analysis, and propose a vibration reduction methods for module transportation.

모듈러 유닛 골조용 비대칭 합성기둥의 설계강도 (Design Strength of Non-symmetric Composite Column for Modular Unit Frames)

  • 박금성;이상섭;문지호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제22권5호
    • /
    • pp.101-109
    • /
    • 2018
  • 모듈형 구조시스템은 학교 및 아파트 건물과 같은 저층 및 중층 구조물에 점점 더 많이 사용되고 있다. 최근에는 고층 건물에 모듈러 구조시스템을 적용하는 방법에 대한 연구가 수행되고 있다. 고층 모듈러 구조시스템에 대해 충분한 저항력과 경제적인 구조를 제공하기 위해 복합모듈 구조시스템이 제안되었다. 본 연구에서는 일련의 실험을 통해 단위 복합모듈 구조에 적용하기 위한 목적으로 비대칭 복합 기둥의 강도를 평가하고자 하였다. 실험적 연구는 기둥의 세장비, 편심율 및 관통바 유무에 따라 기둥의 강도에 미치는 영향에 중점을 두었다. 단위 모듈구조에 대한 비대칭 기둥단면의 설계식을 제안하였다. 결과로부터, 설계식은 단위 복합모듈 구조에서 비대칭 기둥단면의 적절한 강도 예측을 제공한다는 것을 알 수 있다.

한옥의 모듈러 공법 적용에 관한 연구 (Study on the Application of Modular Technologies to Han-ok)

  • 이창재;임석호
    • 한국주거학회논문집
    • /
    • 제23권4호
    • /
    • pp.49-57
    • /
    • 2012
  • This study was conducted to apply the modular construction method to Han-ok. The modular method, which is differentiated from the existing one, means a construction method that equipments, windows and interior materials are prefabricated as a six-sided object at a plant and then they are assembled at the least process on the spot. As for the theoretical observation, the theoretical basis to apply the modular method to the modular housing and Hanok was divided into environmental and economic aspect. In order to apply the modular method to Hanok, the unit scale and size were selected and the plane of unit module Hanok was developed. And a standard with regard to the unit combination and material lifting transportation method was set and planned. In addition, through the comparison the unit modular Hanok to the existing Hanok, the difference was analyzed and the strength was identified in terms fo design method, structure, construction method, period and cost. In final, the conclusion, with regard to the economic, technical application in future, was drawn through arranging the study contents. The unit modular Hanok to carry out the high-quality dwelling through construction period reduction, standardized construction materials and improved insulation performance can meet the demands for a paradigm of new construction technology.

유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구 (The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular)

  • 이창재;임석호
    • KIEAE Journal
    • /
    • 제12권6호
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안 (Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF

MFD 2019를 활용한 모듈러 유닛의 공장생산 관리 (Factory Production Management of Modular Units Using MFD 2019)

  • 이두용;남성훈;이재섭;정담이;김경래;조봉호
    • 대한건축학회논문집:구조계
    • /
    • 제35권6호
    • /
    • pp.139-146
    • /
    • 2019
  • The modular building system is a type of prefabricated construction method, and is an industrialized building system that transports, assembles, and completes a three-dimensional module manufactured in a factory to the site. The economics of a modular building system where 50 to 80% of the entire process takes place in a modular factory is dominated by productivity of the factory manufacturing process. Since the building of the module is finished by the combination of unit parts produced by each material, it is necessary to manage the process in each module unit. However, currently marketed process control programs do not reflect the features of these modular methods. In this paper, we introduce Modular Factory Design software(MFD 2019) that can make modular unit production plan which reflects production base(modular factory) and production target(application and number of modular units). In order to verify software compatibility and reliability, two production plans with different production methods were formulated and simulated.

구조물의 가변성을 위한 모듈형 유닛의 설계 및 해석 (Design and Analysis of a Modular Unit for Reconfiguration of the Structure)

  • 유인환;이보희;송현선
    • 조명전기설비학회논문지
    • /
    • 제25권8호
    • /
    • pp.122-131
    • /
    • 2011
  • In this paper, the design and analysis of a reconfigurable modular structure, which reforms itself according to the change of the environment and realize appropriate forms and motions, are dealt with. This modular is a free structure from the restrictions with constraints about fixed environment and has various forms and motions by combining units. The form of this unit has a shape of a square with 7 centimeters side each, and has a structure which can be combined in a chain-shape or a lattice-shape. Additionally, The structure has a mobility by being equipped with wheels so that it can be combined for itself. In this paper, all the wireless controllers, sensor system, and communicating method between modules according to module structures were suggested and transformation method to be transformed to shape of snakes, caterpillars were presented. Moreover, simulations for each method were performed to show the validity of the motions including motor torque analysis. All the motions suggested were realized and experimented, whereby the availability of the designed mechanism and algorithm was verified with the result of experiments.

CCD에 의한 GF($p^m$)상의 다치 승산기 구성에 관한 연구 (A Study on Construction of Multiple-Valued Multiplier over GF($p^m$) using CCD)

  • 황종학;성현경;김흥수
    • 전자공학회논문지B
    • /
    • 제31B권3호
    • /
    • pp.60-68
    • /
    • 1994
  • In this paper, the multiplicative algorithm of two polynomials over finite field GF(($p^{m}$) is presented. Using the presented algorithm, the multiple-valued multiplier of the serial input-output modular structure by CCD is constructed. This multiple-valued multiplier on CCD is consisted of three operation units: the multiplicative operation unit, the modular operation unit, and the primitive irreducible polynomial operation unit. The multiplicative operation unit and the primitive irreducible operation unit are composed of the overflow gate, the inhibit gate and mod(p) adder on CCD. The modular operation unit is constructed by two mod(p) adders which are composed of the addition gate, overflow gate and the inhibit gate on CCD. The multiple-valued multiplier on CCD presented here, is simple and regular for wire routing and possesses the property of modularity. Also. it is expansible for the multiplication of two elements on finite field increasing the degree mand suitable for VLSI implementation.

  • PDF

유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구 (A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing)

  • 박남천;김균태;박수열;채명진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.