• Title/Summary/Keyword: mock test

Search Result 463, Processing Time 0.02 seconds

구조체 콘크리트의 건조수축 균열저감에 관한 Mock-up 실험 (Mock-up Test on the Reduction of Drying Shrinkage Crack in Structural Concrete)

  • 윤섭;송승헌;한민철;김경환;정용희;한천구
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 봄학술 발표회 논문집(II)
    • /
    • pp.393-396
    • /
    • 2005
  • This paper presents the results of drying shrinkage of concrete using shrinkage-reducingadmixture(DSRA) studied by the authors through mock-up test. DSRA is proportioned by expansive admixture and shrinkage reducing agent(SRA). Flowing concrete method is also applied to assist the concrete to reduce drying shrinkage by decreasing water content at the same time. The use of EA and SRA does not affect fluidity, bleeding and setting time. Compressive strength of concrete using EA along with SRA exhibited less than that of plain concrete. However, The compressive strength with combination of EA-SRA along with flowing concrete method shows comparable to that of plain concrete. The application of developed method can contribute to reducing drying shrinkage by as much as 30-40$\%$ compared with that of plain concrete.

  • PDF

원전구조물 부위별 철근모듈화 방안 연구 (The Rebar Modulation Method in the Area of the Nuclear Power Plant Structures)

  • 이병수;방창준;김석철;임상준;박종혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.15-16
    • /
    • 2013
  • Because of the complicated shape and the overcrowded arrangement of rebar, there are some problems in applying the rebar modulation for the Nuclear Power Plant Structures. In order to resolve these problems, we have been studying the rebar modulation method applying techniques of the high strength rebar for NPP Structure. After reviewing the rebar drawing of the NPP structures and performing the mock-up test, the rebar modulation method in the various area of the NPP Structure has been established. I will introduce this method and the future plan of the research.

  • PDF

유동화 공법을 적용하여 제조한 고유동 콘크리트의 시공 (Execution of High Fluidity Concrete by Flowing Method)

  • 한민철;손성운;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.28-33
    • /
    • 2001
  • This paper presents the results of mock up test on the manufacturing of high fluidity concrete by applying flowing methods with segregation reducing type superplasticizer(SRS). Three kinds of mock up structure are made such as. conventional concrete(A), high fluidity concrete(B) and high fluidity concrete incorporating 20% of fly ash(C). Physical and mechanical properties, temperature history of structure and nondestructive test are performed. Segregation reducing type superplasticizer is put into base concrete at field, and base concrete is also flowed at field. C mock up structure which requires 0.85% of SRS to flow base concrete shows most desirable performance at fresh state. The highest rising temperature shows the lowest at C structure among the tested structures. Strength variations before and after flowing also show the lowest values at C structures.

  • PDF

스트레인 게이지를 이용한 C-type LNG Mock-up 탱크 내조 실 변형 거동 측정 (Measurement of Real Deformation Behavior in C-type Lng Mock-up Tank using Strain Gage)

  • 정원도;김태욱;김정현;이도영;전민성;이제명
    • 한국해양공학회지
    • /
    • 제30권2호
    • /
    • pp.117-124
    • /
    • 2016
  • A C-type LNG mock-up tank was constructed to evaluate the durability of the tank and its structural safety. An experimental strain analysis system equipped with strain gages was designed to investigate the structural behavior of the inner tank at a high hydraulic pressure. In addition, the insulation used in the space between the inner tank and outer tank had a compressive strength and the inner tank thickness of the cylindrical shell and hemisphere was 4.0 mm, which was designed to be thinner than the existing rules. The strains on the inner tank were measured with increasing pressure, and these measurements were compared and analyzed at the strain gage attachment points.

첨단채광시스템 실험용 Mock-Up 모형의 형상 및 모니터링 프로토콜 시스템에 관한 비교분석 - IEA SHC Task21을 중심으로- (Comparative Analysis on the Mock-ups' Configuration and Monitoring Protocol System of Advanced Daylighting Systems for Daylighting Experiment - Focused on IEA SHC Task21-)

  • 정인영;최상현;김정태
    • KIEAE Journal
    • /
    • 제4권1호
    • /
    • pp.11-20
    • /
    • 2004
  • Innovative daylighting systems in buildings in various climatic zones around the world have been developed under the IEA SHC Task21. The performance assessment were obtained by monitoring the most systems using full-scale test model rooms or actual buildings under real sky conditions. This study aims to analyze the configuration and monitoring system of the nine Mock-up models of the IEA SHC Task21 comparatively. For the purpose, the geometry of the test rooms (length, width, height, window area, glazed area and occupied), reflectance of walls, floor and ceiling, transmittance of glazing (transmittance for hemispherical irradiation, normal irradiation and U-value) were compared. And equipment for measurement (manufacturer, range, calibration, maximum calibration error, cosine response error, fatigue error), and data acquisition system (manufacturer, type, number of differential analogue input channels, A/D converter resolution in bits, data acquisition software) were also analyzed comparatively. Some findings of these experimental methodology of standard monitoring have been proven to be a valuable one for future assessment of advanced daylighting systems in our country.

실물대모형 및 1/5, 1/10축소모형의 자연채광 성능평가에 관한 비교분석 (Comparative Daylighting Performance Analysis of Offices in 1/10, 1/5 Scale Models and Mock-up Model)

  • 백승헌;김정태
    • KIEAE Journal
    • /
    • 제6권4호
    • /
    • pp.25-32
    • /
    • 2006
  • Mock-up model can be applied to measure accurate performance data but difficult to apply the variables in experiment. There can be a slight experiment errors in Scale model, but various parameters can be applied for a objective experiment. This paper aims to compare the daylighting performance in 1, 1/5, 1/10 scale model of offices and analyze the experiment errors to certificate the influence of model experiment. To analyse daylighting performance, a comparison of a Mock-up model, sized $12.0m(w){\times}7.2m(l){\times}3.7m(h)$, designed for experimentation of daylighting systems and its 1:5, 1:10 scale model. It has an identical configuration of reference room and the test room. For the test room, the lightshelf system was designed as Micro-4 reflective material. To assess work plane illuminance and light factor, photometric sensors of each room were installed at work-plane(6 points) and exterior horizontal illuminance (1 point). And luminance of window, rare of the room was measured under clear sky. It is to be monitored by Agilent data logger, photometric sensor Li-cor and the Radiant Imaging ProMetric 1400. Comparisons with a light factor, increase-decrease ratio and luminance are discussed.

고부가가치선의 Unit Cabin Mock-up을 이용한 캐빈소음 저감 연구 (Cabin Noise Reduction Using Unit Cabin Mock-up of High Value-added Vessel)

  • 송근복;주원호
    • 한국소음진동공학회논문집
    • /
    • 제20권12호
    • /
    • pp.1210-1215
    • /
    • 2010
  • Unit cabin means room, which is installed in the high value-added vessel such as drill ship, offshore platform and FPSO, after pre-assembled. In order to develop the noise control design for a unit cabin, a variety of acoustic tests such as sound absorption, transmission and radiation measurements were carried out by using the deckhouse mock-up. From the tests, it was found out that the sound transmission loss between cabin and corridor was 13 dB below than FPSO standard and the combined noise level of the unit cabin was dominated by the radiated noise from wall panel in low frequency range. Based on the test results, design guidelines for the noise control of the unit cabin were fully established, such as the improvement of sound transmission loss between the cabin and corridor, and radiated cabin noise reduction.

광기여 필름 LED 팬던트 작업조명시스템 주관평가와 성능검증 (Study of Efficiency Test and Subjective Responses about Pendent Task Lighting System Using Phosphor Luminescent Film LED)

  • 차광석;김회서
    • 설비공학논문집
    • /
    • 제23권3호
    • /
    • pp.188-193
    • /
    • 2011
  • For a long time work or study, pendent task lighting system prepared with phosphor luminescent film LED was developed for eye protection and working efficiency improvement. Developed lighting system was used together with pendent and ambient lighting. Such as, we made comfortable lighting environment system. Evaluation for developed lighting system, that had proceeded to Mock-up test and subjective evaluation. Also It had proceeded that lighting environment analyzed and compatibility valuation of installation. In subjective evaluation, the students have expressed themselves satisfied to phosphor luminescent film LED lighting system. In Mock-up test, It is not problem to intensity of illumination, luminance and color temperature. Therefore, developed LED lighting system was installed at the Daegu apartment. It is having a P.O.E study progress to phosphor luminescent film LED lighting system.

실물대시험에서의 양생방법 차이에 따른 한중콘크리트의 온도이력 및 강도특성에 관한 연구 (A Study on the Strength Properties and the Temperature Hysteresis of Winter Concrete according to the difference of Curing Method in Mock-up Test)

  • 원철;한천구
    • 한국건축시공학회지
    • /
    • 제3권4호
    • /
    • pp.87-94
    • /
    • 2003
  • This study is to investigate the temperature hysteresis and development of compressive strength due to the curing conditions and to evaluate the optimum curing condition of test specimens showing the same development of strength to that of real structures in cold weather. The results of temperature curve with curing conditions in mock-up tests showed the trend of decrease plain concrete with insulation form, plain concrete with heating, concrete with accelerator for freeze protection, and control concrete in turn. The strength development of plain concrete of inside and outside of shelter showed the very slow strength gains due to early freezing, but that of concrete with accelerator for freeze protection showed the gradual increase of strength with time. From this, it is clear that accelerator for freeze protection has the effects of refusing the freezing temperature and accelerating the hardening under low temperature. Strength test results of small specimens embedded in members and located in insulation boxes at the site are similar to that of cores drilled from the members at the same ages, thus it is clear that these curing methods are effective for evaluating in-place concrete strength

벽체 실물대부재실험을 통한 초 저수축 콘크리트의 균열제어 효과 분석 (Analysis of Crack Control Effect of Ultra-low Shrinkage Concrete through Wall Mock-up Test)

  • 서태석;이현승;김강민
    • 한국건축시공학회지
    • /
    • 제22권1호
    • /
    • pp.45-55
    • /
    • 2022
  • 초 저수축 콘크리트는 콘크리트 구조물의 건조수축 균열을 극한으로 제어할 수 있기 때문에 콘크리트 구조물의 품질 및 외관 확보에 매우 효과적이다. 본 연구에서는 초 저수축 콘크리트의 상용화를 목적으로 실내실험을 통해 최적의 팽창재 및 수축저감제 투입량을 정하였고, 콘크리트 벽체 실물대부재실험을 실시하여 초 저수축 콘크리트의 수축 특성 및 균열제어 효과 등을 검토하였다. 그 결과 벽체 시험체에는 건조수축 변형이 거의 발생하지 않았고 균열도 발생하지 않음을 확인할 수 있었다.