• Title/Summary/Keyword: mega project

Search Result 102, Processing Time 0.027 seconds

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

Development of intranet-based Program Management Information System of multi-complex project with application of BIM (BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안)

  • Song, Il-Bab;Hur, Young-Ran;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.2 no.1
    • /
    • pp.27-39
    • /
    • 2012
  • Public construction projects need complex and multi-functional management skill, since the most of public construction projects are comprised of multi-project and mega-projects. In order to effectively manage construction projects, PMIS is widely used. However the majority of the current PMIS have been developed as a single project-oriented business management system. Thus compatibility problems are encountered during the process of integrating the entire systems to manage the multi-complex projects. In addition, the form of orders applying BIM are increased recently, but the research and development of BIM based PMIS are still lacking. In this study, therefore, the functions of PMIS main objectives based on the analysis of PMIS As-Is and To-Be of PMIS, the dual management system utilizing Internet and Intranet will be proposed to integrate the individual PMIS with Integrated Program Management System. Rather than combining commercial BIM tool and PMIS directly, which is the common method of failure, the sequential process model to adopt BIM based PMIS is also explained. Step-by-step development method of BIM based PMIS is suggested to prepare for the activation of BIM technology in the nearest future.

Development of Gateway Review System for Supporting Collaborative Decision-Making through Project Life Cycle (사업 단계별 의사결정 지원 게이트웨이 리뷰 체계 구축)

  • Shin, Seung-Woo;Yi, June-Seong;Lee, Jee-Hee;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.43-54
    • /
    • 2010
  • As Urban Regeneration is being carried out, stakeholders are most likely to have disagreements on their interests. Besides, dispersion of numerous communication routes and obscure decision processes aggravate the situation. Eventually, fragmented decision-making processes and complex structure lead to inefficient outcome and delay of projects. This paper is a study on decision-making support not only helps the program manager have more efficient and optimum decision, but also provides alternatives for Urban Regeneration. This study is conducted as follows. Firstly, the project process and the decision-making structure among stakeholders in Urban Regeneration are analyzed, and then the current status of decision-making in Urban Regeneration project is classified. Secondly, with literature study on "Gateway Review", the decision-making gateway review process in Urban Regeneration is defined, and then the "Gateway Review Elements" are listed. Thirdly, to establish gateway review process, this paper presents a check points, namely gate which supports a program manager to monitor and to control the program management in Urban Regeneration. Each gate has several supporting tools such as diagram of critical decision points relation, scheme of stakeholder, checklist. Fourthly, the proposed concept is verified by experts who have been carefully selected to provide their respective reviews. Finally, decision-making support gateway review system is modified based on their critiques and suggestions.

Analysis of Transshipment Type of Busan Port Utilizing Regional Hub Port Function (중심 항만 기능을 활용한 불산항의 환적 컨테이너 유형 분석)

  • Yang, Weon
    • Journal of Navigation and Port Research
    • /
    • v.31 no.3 s.119
    • /
    • pp.197-204
    • /
    • 2007
  • Busan Port has been facing critical situation in terms of container handling volume, especially growth rate of transshipment(T/S) container of the year of 2006 was at a standstill. Annual average growth rate of T/S container during the period of 2003 to 2006 slowed down to 7.7% while it recorded over 34% to the period of 1999 to 2002. It has mainly resulted from the change of circumstance of Northeast Asian ports, that is, firstly mega carriers' increasing direct call to Northern Chinese ports such as Qingdao, Tianjin and Dairen effected to T/S container volume of Busan port, secondly start to operate deep-water port of Shanghai, thirdly Japanese super hub port project to handle their local containers at domestic ports. This paper aims to analyze the T/S type of inter-routes and hub and spoke and statistical status of Busan port. The purpose of the paper is to propose new concept which is to attract T/S container utilizing hub port function of Busan port in Northeast Asia It is that mega carriers are given dedicated terminals to use Busan port as T/S base in the region.

Geo-Morphological Study of Sand Dune for Railway Project in UAE (UAE 내 철도프로젝트 수행을 위한 사막 사구의 지형학적 특성 연구)

  • Moon, Joon-Shik;Kim, Jae-Young;Lee, Seung-Bok
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.9
    • /
    • pp.17-22
    • /
    • 2012
  • Wind blown sand is expected to disrupt the operation of the railway as the presented railway project in this paper consists of large earthworks in extreme topography of the mega dune fields. For successful railway construction in sand dune area, effective mitigation measure is the most important factor to protect the track from wind blown sand. The effective mitigation measure requires an integrated consideration of the earthworks geometry and the direct control measures such as fence system. Basically there's no perfect measure protecting railway track from wind blown sand, and it would be more economical and effective to develop robust, deliberate maintenance program for track and direct control measure on the basis of geo-morphological study. The purpose of this study is to identify the large scale geo-morphological terrains and specific sand dune morphology in the project area in UAE and estimate the direction and migration rate for sand dunes with the local variations in prevailing wind directions by undertaking literature review, and aerial photographs, satellite images, and ground studies.

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

Suggestion of the Prediction Model for Material Properties and Creep of 60~80MPa Grade High Strength Concrete (설계기준강도 60~80MPa급 고강도콘크리트의 재료 특성 및 크리프 예측모델식 제안)

  • Moon, Hyung-Jae;Koo, Kyung-Mo;Kim, Hong-Seop;Seok, Won-Kyun;Lee, Byeong-Goo;Kim, Gyu-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.517-525
    • /
    • 2018
  • The construction of super tall building which structure is RC and must be certainly considered on column shortening estimation and construction reflected concrete creep has been increased. Regarding the Fck 60~80MPa grade high strength concrete applied in the domestic super tall building project, the mechanical properties and creep deflection according to curing conditions(Drying creep/Basic creep) were reviewed in this research. Results of compressive strength and elastic modulus under sealed curing condition were 5% higher than unsealed condition and difference of results according to the curing condition was increased over time. Autogenous and drying shrinkage tendency showed adversely in the case of high strength concrete. Additionally, creep modulus under unseal curing condition was evaluated 2~3 times higher than sealed condition. Modified model of ACI-209 based on test result was applied to estimate long period shortening of vertical members(such as Core Wall/Mega Column) exactly, it is designed to modify and suggest the optimal creep model based on various data accumulated during construction, in the future.

Critical Success Factors for the Definition Phase of a Construction Program - Focused on the Yongsan Park Development Program - (대형 국책사업의 프로그램 정의단계 핵심성공요인 도출 - 용산공원 조성사업을 중심으로 -)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Hyun, Chang-Taek;Lee, SangHoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.54-63
    • /
    • 2022
  • In order to derive the success factors of a Mega-scale national project, this study conducted a questionnaire survey on experts participating in the Yongsan National Park development program to obtain critical success factors in the program definition phase. AHP analysis was performed for each category through a survey of experts participating in the definition phase of the Yongsan park development program to derive relative importance. The categories were classified into program strategy, process, and people, and the importance between categories was people, strategy, and process in that order. In addition, as for the 27 critical success factors in the program definition phase, the program manager's competency and leadership, environmental and cultural property survey planning, program management plan preparation, operation and maintenance philosophy, and integrated program office showed high priorities. Therefore, in promoting the Yongsan Park development program, we propose a strategy for selecting and focusing on the critical success factors with high priorities in the program definition phase proposed in this study.

Types of Living Areas according to the Flow Characteristics of Rural Dwellers using Mobile Floating Population Data (모바일 유동인구데이터를 활용한 농촌지역 생활자의 유동특성에 따른 생활권 유형화)

  • Kim, Young-Jin;Son, Yong-hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.61-69
    • /
    • 2022
  • This study categorizes and identifies the characteristics of the living areas of rural dwellers through cluster analysis using mobile floating population data. As a result, rural areas in Korea were classified into 34 rural living areas, and 5 types of rural living areas were derived. Although the 'Suburban in Mega City Areas' and 'Suburban in Regional City Areas' derived through this study have advantages in terms of accessibility to large cities, they are important for rural space management as they can undermine the unique values of rural areas due to urban expansion. In addition, 'Unclassified areas' have low accessibility in the national space, and there is a need to provide their own settlement environment. The population of rural areas in Korea exhibited a phenomenon of widespread migration. This means that rural residents who depend on metropolitan areas are provided with SOC beyond administrative boundaries. Therefore, there is a need to move away from establishing a homogeneous regional plan that does not consider population movement. Through this study, it was possible to understand the rural living area formed by the population movement occurring in the rural area. This is different in that the existing studies classified the national space based on the interconnectedness between regions, beyond the limitations of categorizing regions with homogeneous characteristics based on endogenous indicators. At this point in time when the need for a rural space plan is emphasized, it is important to understand the living area of rural dwellers and to design an appropriate rural plan. Therefore, the establishment of a rural plan suitable for the region using the results of this study can increase the efficiency of the project for revitalization of the rural area and contribute to the creation of an attractive national space.