• 제목/요약/키워드: mega complex building

검색결과 16건 처리시간 0.025초

초고층 대형복합 건축공사에 있어 BIM 활용에 관한 고찰 - 해운대 L-Project 적용 성과를 중심으로 - (The Application of using BIM(Building Information Modeling) for a Mega-Complex Building Construction - Focused on using for L-Project -)

  • 박희도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2020
  • Recently as construction projects have been complicated, it has been wearing thin to draw on their personal experiences for management. Although the advance of IT, using the technology for construction is insufficient in contrast to other industries. BIM has been steadily used in construction projects, but it is not easy to find the case of successful use. This research considers ways in which BIM technology can be applied to useful management on a construction site and derives a method of application of using BIM for a Mega-complex Building Project especially.

  • PDF

Structural Design of Nakanoshima Festival Tower

  • Okada, Ken;Yoshida, Satoshi
    • 국제초고층학회논문집
    • /
    • 제3권3호
    • /
    • pp.173-183
    • /
    • 2014
  • Nakanoshima Festival Tower is a 200 m high-rise complex building which contains a renewed 2700-seat capacity concert hall known as "Festival Hall" and offices including headquarter of a news company. In order to build up an office tower on the hall which requires large open space, a giant truss system is employed. The giant trusses being composed of mega-trusses and belt-trusses support all the building weight above them and transfer the load to the outside of the hall. The building also requires high seismic resistance performance for a news company. Application of mid-story seismic isolation enables the building to satisfy high-level seismic resistance criteria.

The Evolution of Seismic Engineering and Design of Ultra Tall Buildings in China Innovations and Sustainability

  • Wang, Aaron J.
    • 국제초고층학회논문집
    • /
    • 제5권3호
    • /
    • pp.221-232
    • /
    • 2016
  • With the booming of construction and property industries in China, the demand for high-rises and mega-scale buildings with more integrated building functions, open- and tailor-shaped outlooks, better connections to municipal infrastructures, and higher grades of building importance has been increasing in the past two decades. The seismic design and engineering of such modern mega-buildings face engineering challenges such as hazard mitigation of extreme actions and surroundings, integrated structural frameworks and building skins, complex connections, and overall construction efficiency. It is the work of a new generation of civil and structural engineers to enhance engineering efficiency and achieve overall engineering, environmental, and economical effectiveness for these high-rise projects. This paper elaborates the above topics through case studies on the design and construction of four such developments in China. Some rethinking is conducted on evolution in modern seismic engineering and design through innovation to achieve an acceptable level of overall sustainability and building effectiveness.

Preliminary Study on Market Risk Prediction Model for International Construction using Fractal Analysis

  • Moon, Seonghyeon;Kim, Du Yon;Chi, Seokho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.463-467
    • /
    • 2015
  • Mega-shock means a sporadic event such as the earning shock, which occurred by sudden market changes, and it can cause serious problems of profit loss of international construction projects. Therefore, the early response and prevention by analyzing and predicting the Mega-shock is critical for successful project delivery. This research is preliminary study to develop a prediction model that supports market condition analysis and Mega-shock forecasting. To avoid disadvantages of classic statistical approaches that assume the market factors are linear and independent and thus have limitations to explain complex interrelationship among a range of international market factors, the research team explored the Fractal Theory that can explain self-similarity and recursiveness of construction market changes. The research first found out correlation of the major market factors by statistically analyzing time-series data. The research then conducted a base of the Fractal analysis to distinguish features of fractal from data. The outcome will have potential to contribute to building up a foundation of the early shock warning system for the strategic international project management.

  • PDF

Form Follows Function - The Composite Construction and Mixed Structures in Modern Tall Buildings

  • Peng, Liu
    • 국제초고층학회논문집
    • /
    • 제3권3호
    • /
    • pp.191-198
    • /
    • 2014
  • The tall building and super tall building has been a common building type in China, with multiple functions and complex geometry. Composite construction is broadly used in tall building structures and constitutes the mixed structure together with concrete and steel constructions. The mixture of the constructions is purposely designed for specific area based on the analysis results to achieve the best cost-effectiveness. New types of composite construction are conceived of by engineers for columns and walls. Material distribution is more flexible and innovative in the structural level and member level. However the reliability of computer model analysis should be verified carefully. Further researches in the design and build of composite construction are necessary to ensure the success of its application. Composite or Mixture Index is suggested to be used as a performance benchmark.

다이어그리드 메가프레임 초고층 건물을 위한 효율적인 해석모델의 개발 (Development of Efficient Analytical Model for a Diagrid Mega-Frame Super Tall Building)

  • 김현수;강주원
    • 한국공간구조학회논문집
    • /
    • 제11권3호
    • /
    • pp.95-103
    • /
    • 2011
  • 비정형 초고층건물을 위한 구조시스템 중에서 다이어그리드 구조시스템은 구조적인 효율성 및 조형성 때문에 널리 사용되고 있다. 근래에는 초고층건물을 위한 구조시스템으로 메가부재의 조합을 통하여 횡방향 강성을 효과적으로 발휘할 수 있는 메가프레임 시스템이 널리 사용되고 있다. 두 가지 구조시스템의 장점을 혼합한 다이어그리드 메가프레임 구조시스템은 미래형 초고층건물에 적용될 유망한 구조시스템으로 평가받고 있다. 그러나 이러한 다이어그리드 메가프레임 구조시스템을 적용한 건물의 거동을 예측하기 위해서는 매우 많은 수의 절점과 요소로 이루어진 유한요소 모델을 해석해야 하므로 상당한 양의 해석시간과 엔지니어의 노력이 필요하게 된다. 따라서 본 연구에서는 다이어그리드 메가프레임시스템을 적용한 초고층건물의 거동을 효율적으로 해석할 수 있는 기법을 제안하여 다이어그리드 메가프레임 초고층건물의 해석과 설계에 소요되는 시간과 노력을 줄이고자 한다. 이를 위하여 다이어그리드 메가프레임의 특정을 활용한 효율적인 모형화기법과 행렬응축기법을 사용하여 해석에 사용되는 자유도수를 최소화한 해석기법을 제안하였다. 예제구조물의 해석을 수행하여 본 연구에서 제안된 해석방법과 일반적인 해석방법에 의한 결과와 비교함으로써 제안된 방법의 효율성과 정확성을 검증하였다.

건설공사 진도관리의 현황 분석에 대한 연구 (Analysis of Construction Schedule Progress Management Practice)

  • 신윤경;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발 (A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk)

  • 김선규;박규영;유영정
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.69-77
    • /
    • 2009
  • 최근 도심재생사업에 대한 관심과 연구가 활발히 진행되고 있다. 이는 기존 도시의 노후화된 건물과 저급화된 기반시설로 인해 파생되는 사회적 경제적 문제들을 새로운 도시개발 즉 재개발사업을 통해 해결하려는 노력의 일환이다. 그러나 도심재생사업은 사업에 관계되는 다양하고 복잡한 이해관계자들과 규모의 방대함으로 수많은 위험에 노출되어 있어 사업의 성과를 보장할 수 없다는 특징을 가지고 있다. 본 연구는 도심재생사업과 같은 메가 프로젝트의 성과관리를 함에 있어, 기존의 비용/공정 중심의 성과측정체계를 위험관리 관점으로 확장시킴으로서 메가 프로젝트에 대한 종합 성과관리의 효율성을 향상시키기 위한 목적으로 위험성과지수 방법론을 제시하였다. 본 연구에서 제시한 위험성과지수 방법론은 기존의 EVMS와 유사한 체계를 갖추고 있고, 위험성과지수를 구성하는 18종류의 세부지수와 변수를 통해 비용/공정/위험의 3차원적 통합 성과관리가 가능하게 하였다.

메가프로젝트 기획/계획단계 VE적용을 위한 준비단계 수행방안 (Development of Pre-workshop Phase for the VE application at the Early Planning Stage of the Mega Project)

  • 하승룡;현창택;손명진;김윤식
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.29-39
    • /
    • 2011
  • 최근 국내에서는 쇠퇴도시 재개발, 도시의 균형발전, 도시 이미지 창출을 목적으로 메가프로젝트 규모의 사업이 활발히 추진되고 있다. 메가프로젝트 사업은 다양한 주체들에 의해 장기간에 걸쳐 대규모로 추진되는 특성으로, 참여주체간의 복잡한 이해관계와 갈등, 부적절한 시설규모 계획을 통한 사업성 저하 등의 문제점이 야기되고 있다. 이러한 문제점을 해결하기 위해서는 사업초기단계에서 비용절감 및 성능향상 효과를 최대한 발휘할 수 있으며 다양한 시설의 규모적 특성을 기능중심적 사고를 통해 지원할 수 있는 VE 적용이 필수적으로 요구된다. 하지만, 사업초기단계에 대한 가용정보의 부족, 기존 방법론의 부재 등으로 인하여 사업초기단계에서의 VE적용은 미흡한 실정이다. 따라서 본 연구에서는 사업초기단계 메가프로젝트의 문제점과 VE적용의 한계를 해결하기 위한 방안으로, VE준비단계에서의 VE팀 구성, Quality Model, 성능지표, Space Model을 제안하였다. 본 연구의 결과는 메가프로젝트의 기획/계획단계에서 VE 수행을 위한 기초적인 자료로 활용될 수 있을 것으로 기대된다.

The New Structural Design Process of Supertall Buildings in China

  • Lianjin, Bao;Jianxing, Chen;Peng, Qian;Yongqinag, Huang;Jun, Tong;Dasui, Wang
    • 국제초고층학회논문집
    • /
    • 제4권3호
    • /
    • pp.219-226
    • /
    • 2015
  • By the end of 2014, the number of completed and under-construction supertall buildings above 250 meters in China reached 90 and 129, respectively. China has become one of the centers of supertall buildings in the world. Supertall buildings in China are getting taller, more slender, and more complex. The structural design of these buildings focuses on the efficiency of lateral resisting systems and the application of energy dissipation. Furthermore, the research, design, and construction of high-performance materials, pile foundations, and mega-members have made a lot of progress. Meanwhile, more and more challenges are presented, such as the improvement of structural system efficiency, the further understanding of failure models, the definition of design criteria, the application of high-performance materials, and construction monitoring. Thus, local structural engineers are playing a more important role in the design of supertall buildings.