Current Status of Rock Cutting Technique Using Undercutting Concept (언더커팅 개념을 적용한 암반절삭기술의 현황 분석)

  • Jeong, Hoyoung;Choi, Seungbeom;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.29 no.3
    • /
    • pp.148-156
    • /
    • 2019
  • In urban area, the use of mechanical excavators (e.g., TBM and roadheader) has been increasing in construction of tunnelling and underground space. The undercutting technology, which is modified from the conventional rock-cutting concept, has been developed by advanced countries. Therefore, research on the latest technology of mechanical excavation is required, and keeping carrying out research on conventional mechanical tunneling methods at the same time. In this study, as a fundamental study of the undercutting technique, the principle and concept of the undercutting were introduced, as well as the current status of the research of advanced countries. The undercutting is applicable as a full-face excavation method for the tunnels and underground spaces, as well as an auxiliary(partial-face excavation) method for extension of the existing tunnels.

Effect of the lateral earth pressure coefficient on settlements during mechanized tunneling

  • Golpasand, Mohammad-Reza B.;Do, Ngoc Anh;Dias, Daniel;Nikudel, Mohammad-Reza
    • Geomechanics and Engineering
    • /
    • v.16 no.6
    • /
    • pp.643-654
    • /
    • 2018
  • Tunnel excavation leads to a disturbance on the initial stress balance of surrounding soils, which causes convergences around the tunnel and settlements at the ground surface. Considering the effective impact of settlements on the structures at the surface, it is necessary to estimate them, especially in urban areas. In the present study, ground settlements due to the excavation of East-West Line 7 of the Tehran Metro (EWL7) and the Abuzar tunnels are evaluated and the effect of the lateral earth pressure coefficient ($K_0$) on their extension is investigated. The excavation of the tunnels was performed by TBMs (Tunnel Boring Machines). The coefficient of lateral earth pressure ($K_0$) is one of the most important geotechnical parameters for tunnel design and is greatly influenced by the geological characteristics of the surrounding soil mass along the tunnel route. The real (in-situ) settlements of the ground surface were measured experimentally using leveling methods along the studied tunnels and the results were compared with evaluated settlements obtained from both semi-empirical and numerical methods (using the finite difference software FLAC3D). The comparisons permitted to show that the adopted numerical models can effectively be used to predict settlements induced by a tunnel excavation. Then a numerical parametric study was conducted to show the influence of the $K_0$ values on the ground settlements. Numerical investigations also showed that the shapes of settlement trough of the studied tunnels, in a transverse section, are not similar because of their different diameters and depths of the tunnels.

Playing God: Self-Reflection, Religion, and Morality in Muriel Spark's Fiction (신을 연기하기: 뮤리엘 스파크 소설의 자아반영성, 종교, 윤리)

  • Kim, Heesun
    • English & American cultural studies
    • /
    • v.18 no.4
    • /
    • pp.33-64
    • /
    • 2018
  • Through the experimental narrative construction by authorial divinity, Muriel Spark's novels and films based on her fiction show the difficulty of living like a human being under various inhumane and manipulative circumstances of the modern capitalistic society. By adopting flash-forward, self-reflection, and deceptive omnipotent viewpoints, her work has surprisingly predicted the post-modern trend in which humans are increasingly attracted and interpellated to the digitalized media. Muriel Spark called the recent anesthetic situation by stimulation "a driver's seat" because it is a symbol of how humans should act to maintain the critical subject. Emphasizing the value of self-reflection, religion and morality in the mechanized society, Muriel Spark stressed literature should play the role of helmsman who sails safely in the rough sea. In Muriel Spark's works, God is often synonymous with writers. As a Jewish immigrant she experienced alienation in Scotland, marital violence, prejudices of the London-based publishing world, Nazism, and Watergate. For her, the harsh reality of the modern society needs to be guided and complemented by something beyond human control. But rather than relying entirely on traditional Catholic doctrines such as Graham Greene and Evelyn Waugh, Muriel Spark has taken a personal, religious view of literature and insists that the genuine writer must play God's play. Seeking for the speculative vision for the future of human life in God's plan, she tries to understand the complex twisted motives of human beings which are often far from the ideal form. Simply put, her search of self-reflection, religion and ethics is modeled on the God's plan for the ideal human being who is supposed as the writer with the transfigurative imagination of the trinity.

TBM mechanical characteristics for NFGM in mechanized tunnelling

  • Pill-Bae Hwang;Beom-Ju kim;Seok-Won Lee
    • Geomechanics and Engineering
    • /
    • v.38 no.5
    • /
    • pp.477-486
    • /
    • 2024
  • The process of inspecting and replacing cutting tools in a shield tunnel boring machine (TBM) is called cutterhead intervention (CHI) (Farrokh and Kim 2018). Since CHI is performed by a worker who enters the chamber in TBM, the worker is directly exposed to high water pressure and huge water inflow, especially in areas with high ground water levels, causing health problems for the worker and shortening of available working hours (Kindwall 1990). Ham et al. (2022) proposed a method of reducing the water pressure and water inflow by injecting a grout solution into the ground through the shield TBM chamber, and named it the new face grouting method (NFGM). In this study, the TBM mechanical characteristics including the injection pressure of the grout solution and the cutterhead rotation speed were determined for the best performance of the NFGM. To find the appropriate injection pressure, the water inflow volume according to the injection pressure change was measured by using a water inflow test apparatus. A model torque test apparatus was manufactured to find the appropriate cutterhead rotation speed by investigating the change in the status of the grout solution according to the rotation speed change. In addition, to prove the validity of this study, comprehensive water inflow tests were carried out. The results of the tests showed that the injection pressure equal to overburden pressure + (0.10 ~ 0.15) MPa and the cutterhead rotation speed of 0.8 to 1.0 RPM are the most appropriate. In the actual construction site, it is recommended to select an appropriate value within the proposed range while considering the economic feasibility and workability.

Analysis on the behavior of shield TBM cable tunnel: The effect of the distance of backfill grout injection from the end of skin plate (뒷채움 주입 거리에 따른 전력구 쉴드 TBM 터널의 거동 특성 분석)

  • Cho, Won-Sub;Song, Ki-Il;Ryu, Hee-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.213-224
    • /
    • 2014
  • Recently, tunnelling with TBM is getting popular for the construction of cable tunnel in urban area. Mechanized tunnelling method using shield TBM has various advantages such as minimization of ground settlement and prevention of vibration induced by blasting that should be accompanied by conventional tunnelling. In Korea, earth pressure balance (EPB) type shield TBM has been mainly used. Despite the popularity of EPB shield TBM for cable tunnel construction, study on the mechanical behavior of cable tunnel driven by shield TBM is insufficient. Especially, the effect of backfill grout injection on the behavior of cable tunnel driven by shield TBM is investigated in this study. Tunnelling with shield TBM is simulated using 3D FEM. The distance of backfill grout injection from the end of shield skin varies. Sectional forces such as axial force, shear force and bending moment are monitored. Vertical displacement at the ground surface is measured. Futhermore, the relation between volume loss and the distance of backfill grout injection from the end of skin plate is derived. Based on the stability analysis with the results obtained from the numerical analysis, the most appropriate injection distance can be obtained.

Development of penetration rate model and optimum operational conditions of shield TBM for electricity transmission tunnels (터널식 전력구를 위한 순굴진율 모델 개발 및 이를 활용한 쉴드TBM 최적운전 조건 제안)

  • Kim, Jeong-Ju;Ryu, Hui-Hwan;Kim, Gyeong-Yeol;Hong, Seong-Yeon;Jeong, Ju-Hwan;Bae, Du-San
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.623-641
    • /
    • 2020
  • About 5 km length of tunnels were constructed by mechanized tunnelling method using closed type shield TBM. In order to avoid construction delay problems for ensuring timely electricity transmission, it is necessary to increase the prediction accuracy of the excavation process involving machines according to rock mass types. This is important to corroborate the project duration and optimum operation for various considerations involved in the machine. So, full-scale tunnelling tests were performed for developing the advance rate model to be appropriately used for 3.6 m diameter shield TBM. About 100 test cases were established and performed using various operational parameters such as thrust force and rotational speed of cuttterhead in representative uniaxial compressive strengths. Accordingly, relationships between normal force and penetration depth and, between UCS and torque were suggested which consider UCS and thrust force conditions according to weathered, soft, hard rocks. Capacity analysis of cutterhead was performed and optimum operational conditions were also suggested based on the developed model. Based on this study, it can be expected that the project construction duration can be reduced and users can benefit from the provision of earlier service.

Evaluation for Rehabilitation Countermeasures of Coal-mined Spoils and Denuded Lands (폐탄광지(廢炭鑛地)의 산림훼손지복구(山林毁損地復舊) 및 폐석유실방지대책(廢石流失防止對策)에 관한 연구(硏究))

  • Woo, Bo-Myeong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.2
    • /
    • pp.24-34
    • /
    • 2000
  • The project for rehabilitation and revegetation of the abandoned coal-mine lands is a very important national environmental restoration project in the view point of rehabilitation and revegetation of denuded forest-lands caused by coal mining as well as restoration of disturbed natural environment and control of the variable pollutions. In Korea, because a large number of coal mines had been developed in order to fill up abundantly consumption of coal as a major energy source in the developing period, a lot of denuded forest-lands caused by coal mining had distributed in the whole country. And, due to the absence of effective rehabilitation and revegetation works on the denuded forestlands caused by coal-mining, most of them had been remained with being damaged. In 1990, area of the abandoned coal-mine lands, requiring the rehabilitation and revegetation works, was about 1,437.1 ha. For the past ten years ('90~'99), about 1,081.8 ha out of them had been rehabilitated and revegetated, and the rehabilitation planning area was about 33.0 ha in 2000. So, remaining area out of abandoned coal-mine lands will be about 322.3 ha after 2000. In principle, after abandoning coal-mine, mine owners must carry out the rehabilitation and revegetation works on the abandoned mine lands by themselves. But, most of mine owners were in financial difficulty after abandoning coal-mine, so that principle couldn't have obtained the desired effects. To solve this problem, from 1995, Coal Industry Promotion Board (CIPB) have carried out the rehabilitation and revegetation works on the abandoned coal-mine lands at government budgets, and they have obtained good results in the construction area. However, due to application of the "conventional erosion control measures and techniques" to the rehabilitation and revegetation measures on the abandoned coal-mine lands, the results and effects of the works excuted have not been successful. Therefore, unique measures and techniques for rehabilitation and revegetation of the abandoned coal-mine lands will have to be developed, especially including development of new techniques on the soil-dressing and soil-covering, seed spray and hydro-seeding measures with seed-fertilizer-soil materials as the mechanized measures, and using of new materials for the tree planting and seedling measures.

  • PDF

Survey and model development of the mechanization for swine farming (양돈농가의 기계화 실태분석 및 모델개발)

  • 이성현;박원규;강창호;오권영
    • Journal of Bio-Environment Control
    • /
    • v.7 no.2
    • /
    • pp.91-108
    • /
    • 1998
  • This study was carried out to survey basic information of swine farms on the machine holdings. facility type. management of manure by farm scale and operation, and then to develop the mechanization model. Manual feeding was common for sows and nursing sows. but automation feeding was normally furnished for weaners. growing pigs and castrated male pigs. Water supplies was completely automated for all of the surveyed swine farms. Fully mechanized and automated system would not be feasible and affordable for the small scale farms breeding less than 500 heads. Because the environmental control for the nursing sows and weaner was important, some swine houses were constructed with the windowless type. However, the furnished rates ranged from 22.2% to 44.4% of the surveyed nursing sow and weaner houses at the farm scales. In the future, a computerized ventilation system would be commended for the efficient use of heat energy and to maintain the desirable temperature of swine buildings. Over-investment for large scale farm and over-crowded pigpen of small farm would cause wasting construction expenses and spreading epidermic diseases Hence, the size of swine building should follow the recommended scale. The fermentation drier was recommended for the manure management. Urine could be recycled or discharged after treating by the activated sludge process.

  • PDF

The study on the effect of fracture zone and its orientation on the behavior of shield TBM cable tunnel (단층파쇄대 규모 및 조우 조건에 따른 전력구 쉴드 TBM 터널의 거동 특성 분석)

  • Cho, Won-Sub;Song, Ki-Il;Kim, Kyoung-Yul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.4
    • /
    • pp.403-415
    • /
    • 2014
  • Recently, the temperature rise in the summer due to climate change, power usage is increasing rapidly. As a result, power generation facilities have been newly completed and the need for ultra-high-voltage transmission line for power transmission of electricity to the urban area has increased. The mechanized tunnelling method using a shield TBM have an advantage that it can minimize vibrations transmitted to the ground and ground subsidence as compared with the conventional tunnelling method. Despite the popularity of shield TBM for cable tunnel construction, study on the mechanical behavior of cable tunnel driven by shield TBM is insufficient. Thus, in this study, the effect of fractured zone ahead of tunnel face on the mechanical behavior of the shield TBM cable tunnel is investigated. In addition, it is intended to compare the behavior characteristics of the fractured zone with continuous model and applying the interface elements. Tunnelling with shield TBM is simulated using 3D FEM. According to the change of the direction and magnitude of the fractured zone, Sectional forces such as axial force, shear force and bending moment are monitored and vertical displacement at the ground surface is measured. Based on the stability analysis with the results obtained from the numerical analysis, it is possible to predict fractured zone ahead of the shield TBM and ensure the stability of the tunnel structure.

Characteristics of Korean Inshore Fishing Boats (한국(韓國) 연근해어선(沿近海漁船)의 특성(特性))

  • Keuck-Chun,Kim
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.8 no.1
    • /
    • pp.67-94
    • /
    • 1971
  • Korean fisheries industry holds 57,255 boats amounting to 269,079 tons in gross as of the end of 1967. The boats of the size under 30G.T., about sixty-two per cent of the total in tonnage, are utilized in coastal and their contribution to the total production of Korean fisheries industry is estimated at over seventy-five percent. Hull forms and construction method of them are partly in transition stage to the western tradition from the oriental tradition, which employs the chine-type straight-framed section, and tick and wide wooden planking fastened on naturally bent timber frames. And only about a half of them are mechanized. About fifty-seven per cent, 7,525 boats amounting to 91,751 gross tons, of the coastal and inshore fishing boats are those of the size ranging 5G.T. to 30G.T., which are engaged mostly in draft-and gill-netting, angling, longlining, anchovy seining, squid fishing and set-netting. The important fishing boats forming main structure of the inshore fishing fleets can be classified as 5G.T.-class multi-purpose boats, 10G.T.-class angling/longlining boats and 20G.T.-class drift-/gill-netters mostly utilized in the east-sea, 15G.T.-class anchovy seiner in the south-sea-sea, 20G.T.- and 28G.T.-class stow-netters in the west sea. Each of the three sea regions, east, south, and west, of Korean water has distinctly different characters from one another in topography, geology and sea aspects, and consequently in marine resources, fishing grounds and fishing tactics desired. Hence, the finishing boats in each sea region have also their own characters in hull form, structural features, deck design and equipments. In this report, analyzing the characteristics of the existing inshore fishing boats ranging 5G.T. to 30G.T. in size from view points of naval architecture and engineering, the author made an integrated investigation of their characteristics, covering size and principal dimensions, hull form, deck design, structural features and mechanization, in close connection with the natural circumstances of Korean water and local techno-socio-economic problems, and, finally, made some suggestions for the rational improvement or modernization of the inshore fishing boats. Further details of the characteristics of Korean inshore finishing boats are referred to the drawings of them compiled by the author and given in the reference[23] listed at the end of this report.

  • PDF