Kim, Cheol;Sa, Jae-Hwan;Kim, YunSoung;Jeon, Eui-Chan
Journal of Climate Change Research
/
v.1
no.3
/
pp.219-226
/
2010
This study is analyzed the financial feasibility of biomass power plant in China in terms of fuel marginal price of biomass power plant. The range of fuel price is 150~300 RMB and IRR(Internal Rate of Return), NPV(Net Present Value), DSCR(Debt Service Coverage Ratio) and operation time are analyzed by 10 RMB from 150 RMB. The sensitivity of IRR went down by 1.35 on average. The sensibility of NPV showed big difference by 20% on 260 RMB and 270 RMB. In addition, DSCR of loan is at 1.0 at raw cost of 242 RMB and at lower than 1.0 when the raw cost over 242 RMB. It means that the pay-off of principal and interest of the loan is expected to be difficult in that case. The operation time of power plant should be 88% against standard operation time to maintain over 1.0 of DSCR. Therefore, the factors affecting the cost of raw material to build the power plant and to operate it should be prioritized.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.8
/
pp.1504-1511
/
2009
By development of renewable energies and high-efficient facilities and deregulated electricity market, the operation cost of distributed generation(DG) becomes more competitive. The amount of distributed resource is considerably increasing in the distribution network consequently. Also, international environmental regulations of the leaking carbon become effective to keep pace with the global efforts for low-carbon paradigm. It contributes to spread out the business of DG. Therefore, the operator of DG is able to supply electric power to customers who are connected directly to DG as well as loads that are connected to entire network. In this situation, community energy system(CES) having DGs is recently a new participant in the energy market. DG's purchase price from the market is different from the DG's sales price to the market due to the transmission service charges and etc. Therefore, CES who owns DGs has to control the produced electric power per hourly period in order to maximize the profit. If there is no regulation for carbon emission(CE), the generators which get higher production than generation cost will hold a prominent position in a competitive price. However, considering the international environment regulation, CE newly will be an important element to decide the marginal cost of generators as well as the classified fuel unit cost and unit's efficiency. This paper will introduce the optimal operation of CES's DG connected to the distribution network considering CE. The purpose of optimization is to maximize the profit of CES and Particle Swarm Optimization (PSO) will be used to solve this problem. The optimal operation of DG represented in this paper is to be resource to CES and system operator for determining the decision making criteria.
Purpose: The purpose of this study was to investigate the cognition of denture fabrication activities and its cost in National Health Insurance for elderly denture. Methods: A self-administered questionnaire was completed by 41 dental laboratories' owner who was research subjects of HIRA(Health Insurance Review & Assessment Service)'s policy research for elderly denture in 2011. The questionnaire consisted of general characteristics of the subjects, dental technicians' knowledge of national health insurance coverage of elderly denture, job-related changes after national health insurance coverage of elderly denture including validity of denture fabrication activity classification and the cost for each service. Each question was measured by Likert 5 point scale or frequency. The collected data were analyzed by SPSS 16.0. Results: Most of the research subjects had been fabricating national health insurance coverage denture(92.7%), also had ample knowledge of national health insurance coverage denture for elderly. Job-related changes after national health insurance coverage of elderly denture revealed marginal differences in the quality. The validity of fabrication activity classification of resin based complete denture was $3.71{\pm}1.023$ by Likert 5 point scale. Conclusion: The goal of national health insurance for elderly denture is to promote elderly's health and well-being. To fabricate denture is a very important part of the denture treatment. For this reason, denture fabrication activity classification and the cost analysis plan should be duly reflected in the policy of national health insurance for elderly denture.
Waste sector has been a target of abatement policies by the most governments, even though its greenhouse gas (GHG) emission is not so high, since it is related to almost of other sectors. This study propose new GHG calculation equations which resolves logical contradiction of IPCC GL (Intergovernmental Panel on Climate Change Guideline) equations by including waste-to-energy effects. According to two GHG calculation equations, GHG emission inventory and BAU by the year 2050 have been computed. And GHG abatement potential and marginal cost for the five abatement policies carefully selected from the previous researches have been calculated for the year 2020. The policy that makes solid fuel like RDF from flammable wastes and uses them as combustion fuel of electricity generations has been found to be the most efficient and effective one among five policies. The cumulative abatement amount when five policies not mutually exclusive are applied sequentially has been reckoned.
Purpose - This study aims to analyzing of solar power generation cost-benefit. Design/methodology/approach - We analyzed whether there is economic feasibility by selecting parking lots and idle sites located in four areas of Seoul, Gyeonggi, Chungcheong, Jeolla, and Gyeongsang areas nationwide, and analyzing site conditions and installation capacity. Findings - According to the results of the analysis, it was found that there is low profitability in Seoul, Gyeonggi and Chungcheong regions, where the solar radiation was not excellent even if REC is selected through the contract market. However, it is necessary to analyzed the economical validity the profitable validity including environmental benefits (greenhouse gas reduction, NOx, SOx reduction effect) and social benefits (renewable power supply) that is analyzed by income and operating costs which is occurred from electricity sales and REC sales when installing solar power generation facilities. Research implications or Originality - In this study, economic feasibility was evaluated additionally in consideration of environmental and social benefits. In conclusion, it was shown that businesses are not economical when considering only simple financial aspects are also sufficiently economical when it is considering environmental and social benefits.
The commercialization has been of great importance to the clean energy research sector for investing the wind farm development, but it would be difficult to reach a social consensus on the need to expand the economic feasibility of renewable energy due to the lack of reliable and continuous information on levelized cost of Energy (LCOE). Regarding this fact, this paper presents the evaluation of LCOE, focusing on Ulsan offshore region targeting to build the first floating offshore wind farm. Energy production is estimated by the meteorology data combined with the Leanwind Project power curve of an exemplar wind turbine. This work aims to analyze the costs of the Capex depending on site-specific variables. The cost of final LCOE was estimated by using Monte-Carlo method, and it became an average range 297,090 KRW/MWh, a minimum of 251,080 KRW/MWh, and a maximum of 341,910 KRW/MWh. In the year 2021, the SMP (system marginal price) and 4.5 REC (renewable energy certificate) can be paid if 1 MWh of electricity is generated by renewable energy. Considering current SMP and REC price, the floating platform industry, which can earn around 502,000 KRW/MWh, can be finally estimated highly competitive in the Korean market.
It has been taken for 10 years since Climate Change Convention could it be made. And Kyoto Protocol will come into force as an international law as from 16. Feb 2005. As based on it, Annex I countries will implement their mitigation projects on GHG reductions and press developing countries on GHG reduction target. Korea has not duty target on it yet. But it will be held a COP(Conference of Party) on negotiation for reduction target of second commitment period. If Korea has a real duty, Industry sector should reduce GHG emissions. Then Market mechanism will be need to introduce for this. This study started having a question "Is it possible to introduce emissions trading in Korea?". To solve the problem, this study analysed GHG emissions, marginal abatement cost, market price with 11 companies of industry (about 36% of Korea emissions). minus target is impossible to implement reduction target ver base year (2002). And emissions trading scheme also can't make the market without additional policy and measures. This study suggest that it is need to import credits and give a subsidy of government to encourage it. The imported credit can reduce the demand curve within the marginal abatement cost curves. But the effectiveness of credit is not the same as continually growth. As a result, Allowing 40% credit into emissions trading market is the best to reduce costs. However, a subsidy is the little bit difference. A subsidy make marginal abatement cost curves down for itself. Giving 30% for subsidy, it is the best. Considering both of importing credits and subsidy, it is the best effects in the reducing cost for company. especially 30% is the best effects respectively. This Study show that government wants to consider designing emissions trading, encourage participants competitiveness, and encourage the early action, government has to allow credit trading and give a subsidy to participants.
The introduction of a mobile virtual network operator (MVNO) system is expected to increase consumer benefits, boost competition in the mobile market, utilize idle bandwidth, and expedite mobile-fixed line convergence and growth in the mobile Internet market. This research endeavors to study the optimal access charge for an MVNO system, which is expected to be introduced to the Korean mobile communications market. We found that the optimal access charge is higher in the interdependent model than in the independent model if demand for mobile phone service is based on a substitution relationship. We also found that the optimal access charge is higher than the marginal cost.
In restorative treatment using fixed dental prostheses, dentists should select appropriate restoration material among various types of dental materials. The strength, marginal fit, esthetics, wear resistance, biocompatibility, and cost are important factors in the choice of restoration materials. The present case showed a surface stain on a monolithic zirconia restoration that was due to wear between the monolithic zirconia restoration and the base metal alloy restoration. This phenomenon was confirmed by surface roughness measurement and electron probe micro-analysis.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.7
/
pp.889-895
/
2014
Korea electric power industry had been under vertical monopoly but is typically getting restructured for free competition. An ideal pricing system under the competitive market system is 'unbundled pricing system' and 'marginal pricing system', but the current pricing system still adheres to the traditional bundled system and the average cost pricing system. Especially, progressive electricity rates for residential use reflect governmental policy-making which is focused on income redistribution & welfare, industrial supports and energy saving. This study proposes new and reasonable residential electricity pricing systems which are Time-Of-Use (TOU) and Real-Time Pricing (RTP) to reflect variations in the wholesale price of electricity. It also presents examples of various tariffs for residential electricity pricing systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.