• Title/Summary/Keyword: management and maintenance cost

Search Result 793, Processing Time 0.027 seconds

A Study on the Rationalization of Management and Maintenance Cost for Railway Investment Assessment - Focus on High Speed Railway - (철도투자평가를 위한 운영.유지보수비용 합리화 방안 - 고속철도를 중심으로 -)

  • Suh, Sang-Kyo;Sung, Deok-Yong;Roh, Byoung-Kuk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.331-340
    • /
    • 2009
  • This study is objected by suggesting rationalization method of management and maintenance cost for railway investment assessment. The estimate of rational benefit and cost are a work of vital importance to decide railway investment as preliminary feasibility investigation is institutionally reinforced since January 2007. In particular, railway management and maintenance cost have to be applied to realistic and detail cost as railway investment assessment guide. For example, types of railway, construction of new line, improvement of conventional line, double tracking, railway electrification. However, railway investment assessment is inconsistency because of estimating the railway management and maintenance cost using existing unrealistic management and maintenance cost. Therefore, this study is performed parametric analysis effecting on the railway management and maintenance cost considered new technique, enhanced facilities and improved standard. Also, it suggests the itemized standard management and maintenance cost. Finally, it will be helped to establish the base of railway investment through the rationalization method of management and maintenance cost.

  • PDF

The Maintenance Cost Estimation Model for Information System Maintenance Based on the Operation, Management and Service Metrics (운영·관리 및 서비스 지표에 기반한 정보시스템 유지보수 비용 추정 모델)

  • Lee, Byoung-Chol;Rhew, SungYul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.5
    • /
    • pp.77-85
    • /
    • 2013
  • In this paper, we present the cost measurement metrics for the operation management and service improvement besides the general maintenance. The cost measurement metrics of the operation management and service improvement are based on the metrics that are classified and summarized precedent studies and complemented by empirical measuring indicators, and we propose the maintenance cost estimation model based on this metrics. The maintenance costs can be calculated detailedly, because the proposed metrics can be used selectively, depending on the scope of the information system maintenance. The effectiveness of the proposed maintenance cost measurement metrics and cost estimation model is verified by comparison between existing studies and our research.

Investigating the Maintenance Cost of Rest Areas: A Case Study of Nevada

  • Shrestha, Kishor;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.624-631
    • /
    • 2022
  • Highway Rest Areas are envisioned to provide an accessible space for rest and parking for travelers, especially those driving a long distance. In addition, modern highway Rest Areas provide many amenities to highway users, including wifi service, picnic tables, litter barrels, running water, public telephones, and sometimes even free coffee. Various studies were conducted in the domain of Rest Area facility design and their operating costs in different states; however, limited studies were conducted on the maintenance costs of these facilities. Therefore, this study's main objective is to compute the annual maintenance cost of Rest Areas in the state of Nevada. This study also analyzes the main cost categories of the maintenance works. The raw cost data of Nevada Rest Area maintenance from 1990 to 2012 were collected from the Nevada Department of Transportation (NDOT). Results show that the maintenance cost fluctuated over the study period; the maintenance cost decreased from 1991 to 2004 and then increased until 2012. The primary cost categories of maintenance work are labor, equipment, and material costs. Among these, labor cost was the largest category with 56 percent of the total maintenance cost, followed by equipment cost and material cost. The findings of this study may help NDOT and other transportation agencies plan their budget for future Rest Area maintenance activities.

  • PDF

Study on Optimal LCC Considering Asset Management Through Maintenance-Period Analysis about Railway Truss Bridge (철도트러스 교량의 유지보수주기분석을 통한 자산관리 차원의 최적LCC에 관한 연구)

  • Kim, Tae-Hee;Park, Mi-Yun;Moon, Jae-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1350-1358
    • /
    • 2008
  • Recently the study related to life cycle cost analysis of railway structure consisted of a complex is proceeded covering several range, which is considering the methodology of efficiency and rationalization for maintenance and analysing long-time behavior of the structure of looking at standpoint from asset management and safety. But LCCA(life cycle cost analysis) of railway structure was almost impossible as there were not anything datum for maintenance plan, such as maintenance periods related to each of components(painting and corrosion of steel, and cracking of elements, etc)and maintenance proportion, despite of its 100-year history. According, for collecting data related to railway truss bridge, bridge record cards and testing safety papers, and researching question, etc are surveyed and classified for LCC Analysis. Especially, LCC assessment on the side of assets-maintenance considering about initial cost, maintenance cost, and indirect cost is constructed. Maintenance period and complementary measure rate are very important in maintenance. To decide maintenance period, Baysian updating method is applied.

  • PDF

Developing a Decision-Making Model to Determine the Preventive Maintenance Schedule for the Leased Equipment (대여 장비의 예방정비 일정 결정을 위한 의사 결정 모델 개발)

  • Lee, Ju-hyun;Bae, Ki-ho;Ahn, Sun-eung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.2
    • /
    • pp.24-31
    • /
    • 2018
  • As a system complexity increases and technology innovation progresses rapidly, leasing the equipment is considered as an important issue in many engineering areas. In practice, many engineering fields lease the equipment because it is an economical way to lease the equipment rather than to own the equipment. In addition, as the maintenance actions for the equipment are costly and need a specialist, the lessor is responsible for the maintenance actions in most leased contract. Hence, the lessor should establish the optimal maintenance strategy to minimize the maintenance cost. This paper proposes two periodic preventive maintenance policies for the leased equipment. The preventive maintenance action of policy 1 is performed with a periodic interval, in which their intervals are the same until the end of lease period. The other policy is to determine the periodic preventive maintenance interval minimizing total maintenance cost during the lease period. In addition, this paper presents two decision-making models to determine the preventive maintenance strategy for leased equipment based on the lessor's preference between the maintenance cost and the reliability at the end of lease period. The structural properties of the proposed decision-making model are investigated and algorithms to search the optimal maintenance policy that are satisfied by the lessor are provided. A numerical example is provided to illustrate the proposed model. The results show that a maintenance policy minimizing the maintenance cost is selected as a reasonable decision as the lease term becomes shorter. Moreover, the frequent preventive maintenance actions are performed when the minimal repair cost is higher than the preventive maintenance cost, resulting in higher maintenance cost.

A Software Maintenance Cost Estimation Model based on Real Maintenance Efforts (투입노력 양에 기반한 소프트웨어 유지보수 비용산정 모형)

  • Jeong, Eun-Joo;Yoo, Cheon-Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.181-196
    • /
    • 2012
  • The cost of software maintenance occupies about two thirds in the software lifecycle. However, it is not easy to estimate the cost of software maintenance because of various viewpoints about software maintenance, unclear estimation methods, and complex procedures. Until now, the cost estimation model has used compensation factors for software characteristic and environment on the basis of program size. Especially, most of existing models use maintenance rate of total software cost as a main variable. This paper suggests the software maintenance cost estimation model that uses the result of calculating real maintenance efforts. In this paper, we classify functional maintenance and non-functional maintenance as software maintenance activity type. For functional maintenance, present function point of target software is needed to evaluate. The suggested maintenance cost evaluation model is applied to a software case in public sector. This paper discusses some differences between our model and other modes.

Control system modeling of stock management for civil infrastructure

  • Abe, Masato
    • Smart Structures and Systems
    • /
    • v.15 no.3
    • /
    • pp.609-625
    • /
    • 2015
  • Management of infrastructure stock is essential in sustainability of society, and its analysis and optimization are studied in the light of control system modeling in this paper. At the first part of the paper, cost of stock management is analyzed based on macroscopic statistics on infrastructure stock and economical growth. Stock management burden relative to economy is observed to become larger at low economic growth periods in developed economies. Then, control system modeling of stock management is introduced and by augmenting maintenance actions as control input, dynamic behavior of stock is simulated and compared with existing time history statistics. Assuming steady state conditions, applicability of the model to cross sectional data is also demonstrated. The proposed model is enhanced so that both preventive and corrective maintenance can be included as system inputs, i.e., feedforward and feedback control inputs. Optimal management strategy to achieve specified deteriorated stock level with minimal cost, expressed in terms of preventive and corrective maintenance actions, is derived based on estimated parameter values for corrosion of steel bridges. Relative cost effectiveness of preventive maintenance is shown when target deteriorated stock level is lower.

MAINTENANCE COST ANALYSIS FOR LARGE HOSPITAL BUILDINGS

  • Sy-Jye Guo;Tzu-Ping Lo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.310-315
    • /
    • 2009
  • Large hospitals such as medical centers provide not only medical services, but also carry the responsibilities for emergency refuges, medical researches and education. The function of large hospitals is as important as other infrastructure systems such as highways, bridges, and utilities. When disasters occur, the hospitals have to provide emergency medical services for victims and support the patient's needs of health. In order to keep a smooth operation of hospitals, the maintenance management of hospital buildings should be carefully investigated. However, there are few researches focused on maintenance management issues of hospital buildings. This paper investigated the National Taiwan University Hospital (NTUH) and established a maintenance cost database. The NTUH is the best-known and most high-renowned medical center in Taiwan in which more than 4,000 employees serving approximately 2,000 in-patients and 7,000 out-patients daily. The data were collected from the NTUH which consisted of 16,228 maintenance records in the past ten years. This paper analyzed these data to obtain various characteristics of maintenance records, and revealed the key items of maintenance cost for large hospital buildings, which can provide the facility manager of hospital buildings to execute a proper maintenance policy for hospital buildings.

  • PDF

Implementable Strategy on Asset Management of Domestic Public Rental Housing (국내 공공임대주택의 자산관리 도입 방안)

  • Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.103-110
    • /
    • 2009
  • Recently, maintenance of public rental housing becomes a critical issue because its expenditure possesses the majority proportion of life cycle cost. The countries, such as USA and Singapore, have introduced the approaches for advanced property management, which are cost-effective in the maintenance management. However, as maintenance management system becomes advanced, risks associated with its application are also increased. Therefore, it is needed to assess the appropriate applicability of public rental housing maintenance management considering the constrains in domestic construction industry. The main objective of this study are to investigate international cases and systems and to propose strategic introduction, which satisfies the regulations and policies for domestic public rental housing. In order to evaluate the suitability of the investigated systems, practitioners' opinions were reviewed through the questionnaire surveys using analytic hierarchy process (AHP). The surveys indicate that advanced asset management was the suitable process for managing efficiently domestic public rental housing. Moreover, the results showed each weights of considerable criteria for assessing the effective application of maintenance management, and would contribute to further detailed and systematic management.

Ordering Policy for Planned Maintenance with Salvage Value

  • Park, Young T.;Jing, Sun
    • International Journal of Quality Innovation
    • /
    • v.7 no.3
    • /
    • pp.15-23
    • /
    • 2006
  • A spare ordering policy is considered for planned maintenance. Introducing the ordering, uptime, downtime, inventory costs and salvage value, we derive the expected cost effectiveness. The problem is to determine jointly the ordering time for a spare and the preventive replacement time for the operating unit which maximize the expected cost effectiveness. Some properties regarding the optimal policy are derived, and a numerical example is included to explain the proposed model.