• Title/Summary/Keyword: maintenance operation

Search Result 2,140, Processing Time 0.034 seconds

Case Study for Design and Implementation of Qualifying University Graduate System for Efficient Maintenance (효율적인 유지보수가 가능한 대학졸업사정시스템의 설계 및 구현: 사례 연구)

  • Lim, EunKi
    • Journal of Digital Convergence
    • /
    • v.11 no.2
    • /
    • pp.193-203
    • /
    • 2013
  • In our thesis we introduce case study for qualifying university graduates system for efficient maintenance. First, we find out factors to make maintenance difficult and present solution for them. Second, we convert system architecture from algorithm-oriented to driving-engine-based, design DB schema, develop algorithms for important components of proposed system, and implement them. Through results of system operation, we show that our system can reduce maintenance cost fairly.

A development of the maintenance function for the solar power plant based on IoT (IoT 기반의 태양광 발전소 유지보수 기능의 개발)

  • Nam, Kang-Hyun;Jeong, Moon-Jae
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.10
    • /
    • pp.1157-1162
    • /
    • 2015
  • The maintenance function of Solar power plant is configured with Sensor devices, Gateway, and Maintenance Function Platform. In this paper, we designed gateway resource tree and service scenario to fit the Maintenance Function and demonstrated appropriate operation of the maintenance service through intelligent functional modeling.

Reliability Estimation of End Beam for Uncorved Freight Car using Damage Summation Method (신뢰성 분석을 이용한 무개화차용 엔드빔의 피로수명 평가와 계획예방정비)

  • Lee, Kyoung-Young;Jeong, Joo-Heon;Baek, Seok-Heum;Cho, Seok-Swoo;Joo, Won-Sik
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.394-399
    • /
    • 2004
  • Increased cumulative running times of railroad vehicle brings out such degradation as wear and fatigue. It don't adapt corrective maintenance which repairs a poor pan after a trouble but use preventive maintenance which fixes a bad part before a trouble. There were a few researches for preventive maintenance such as inspect affairs and facilities management. They couldn't estimate the operation reliability on railroad vehicle. Therefore, this study proposes the preventive maintenance procedure that predict repair period of end beam for uncovered freight car using reliability function and instantaneous failure rate on the basis of fatigue test and load history data.

  • PDF

Optimal Preventive Maintenance Policy Based on Aperiodic Model

  • Kim, Hee-Soo;Yum, Joon-Keun;Park, Dong-Ho
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2000.11a
    • /
    • pp.335-342
    • /
    • 2000
  • Preventive maintenance(PM) is an action taken on a repairable system while it is still operating, which needs to be carried out in order to keep the system at the desired level of successful operation. The PM improves the reliability of the system by predicting the possible failures and thereby preventing such failures from its occurrence. In this paper, we develop the optimal preventive maintenance policies based on the aperiodic PM model. We investigate an aperiodic preventive maintenance policy and propose several optimal PM policies which minimize the expected cost over an infinite time span. Park, Jung and Yum(2000) determine the optimal period and the optimal number of PMs based on Canfield's(1986) periodic model. Our techniques to derive the optimal preventive maintenance policies based on our aperiodic PM model is similar to those in Park, Jung and Yum(2000), which can be considered as the special case of our results.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.57-64
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.143-150
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

Implementation of Traveling Wave Tube Amplifier Maintenance System for the Microwave Surveillance Radar (마이크로파 탐색레이더 진행파관증폭기 정비시스템 구현)

  • Yoon, In-Chul;Kwon, Jong-Woon;Park, Yong-Man;Odgerel, Odgerel;Kim, Hie-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2006.04a
    • /
    • pp.264-266
    • /
    • 2006
  • This traveling wave tube amplifier maintenance system was developed for performance of microwave Surveillance radar traveling wave tube amplification parts, and field operation. The Maintenance system is traveling wave tube amplification part RF output waveform measurement and HVPS Voltage adjustment and a maintenance function are offer. The system was developed as an embedded system base it consisted of Linux os which applied a top-down design and visual technique. Therefore change and easy extension of a system. This paper discussed characteristic of maintenance equipment function, composition, and an employment program.

  • PDF

Risk Monitor Development for On-Line Maintenance (가동중 정비를 위한 Risk Monitor 개발)

  • 김길유;한상훈;김태운
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.21-26
    • /
    • 1997
  • Korea Atomic Energy Research Institute (KAERI) developed a risk monitor called Risk Monster which supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Risk Monster can update the plant risk continuously according to the change of system/component configuration since Risk Monster reevaluates the plant risk based on the Probabilistic Safety Assessment (PSA) results. A brief description of Risk Monster is provided. The PSA model of UCN 3, 4 nuclear power plant was converted by KAERI to Risk Monster model. Using this Risk Monster model, a feasibility study of the on-line maintenance of an Essential Service Water (ESW) pump was performed. On-line maintenance of one ESW pump has been shown to be acceptably safe, and has economic benefits. In addition, it is not a violation of technical specification to continue plant operation with an out-of-service ESW pump.

  • PDF

Management System for Improving RAM of Equipment in Container Terminals (컨테이너 터미널 장비의 RAM 향상을 위한 관리 시스템)

  • Yun, Won-Young;Kim, Gui-Rae;Ha, Young-Ju;Son, Bum-Shin;Kim, Hey-Jeong
    • IE interfaces
    • /
    • v.19 no.3
    • /
    • pp.245-254
    • /
    • 2006
  • Equipments in container terminal have a lot of parts, and an equipment breakdown affects the productivity of terminal. In this paper, we develop a maintenance management system for improving reliability, availability and maintainability of equipments in container terminals. The developed system consists of five modules : equipment structure module, equipment operation management module, maintenance control module, spare part control module and data analysis module. The system supports reliability engineers to manage and improve RAM of equipments in container terminals. For example, FMEA, failure state analysis and life distribution parameters estimation are easily or automatically done by the system. This system also provides optimal preventive maintenance intervals by simulation and optimal yearly PM schedules for equipments in container terminal are recommended.

A Study on the Development of Generator Maintenance Scheduling Program Package (발전기 예방정비계획 전산화모형 개발에 관한 연구)

  • Won, Jong-Ryul;Yoon, Yong-Beum;Park, Si-Woo;Nam, Jae-Hyun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.11
    • /
    • pp.1374-1381
    • /
    • 1999
  • This paper describes development of a package for generator maintenance scheduling program with user-friendly interactive mode. Generator maintenance scheduling is to select desirable maintenance periods of generators in the given interval satisfying reliability or economic criteria. Window-based system for user-friendly mode and Oracle-based database system for efficient data management are established in our package. Reserve rate levelization and LOLP minimization are performed in calculation mode, which is composed of DLL programs. Many graphs and charts are illustrated for the user-analysis. Operation is carried out by day-based unit, not by week. The case study has been conducted with the data of practical KEPCO power system in 1999 and successfully demonstrated its effectiveness.

  • PDF