• Title/Summary/Keyword: maintenance management program

Search Result 367, Processing Time 0.027 seconds

A Development of the LCC Analysis Program Package for Optimal Maintenance of HVAC Systems (공조설비 유지관리용 LCC 분석 패키지 개발)

  • Kim, Yong-Ki;Woo, Nam-Sub;Lee, Tae-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.9
    • /
    • pp.513-518
    • /
    • 2009
  • The building HVAC systems generally have very different qualities of performance and durability with the superintendent's interest in or capability of management and maintenance of them. The poor management of these systems finally lead to the shortening of the life expectancy and result in the increase of operating cost and energy consumption due to their low efficiencies. So it is necessary to develop tools to maintain adequately and to operate efficiently various building service equipments in order to cope with actively the global environment problems and energy crises. In this study the LCC based calculation program and package were developed, which could be used for analyses of the economic performance and determination of the reasonable maintenance time and methods of building HVAC systems.

Development and Application of Reliability DB Program for K-AGT system (한국형경량전철(K-AGT)시스템의 신뢰성 DB 프로그램 개발과 활용)

  • Han Seok-Youn;Ha Chen-Soo;Lee Ho-Yong;Hong Soon-Ki;Yi Woo-June
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.2
    • /
    • pp.91-102
    • /
    • 2006
  • Korea Railroad Research Institute developed the driverless rubber-tired Korean-AGT system from 1999 to 2005 and has done its performance and reliability tests on the test line at Gyeongsan-city. We made the reliability management program to control required the RAMS(reliability, availability, maintainability & safety) of the K-AGT system. Therefore, we demonstrated the development and application of Reliability DB program. The main functions of K-AGT Reliability DB program manages failures and maintenance data systematically from the test line through test period and provides various analysis results based on the inputted data.

A Study on the Improvement of Supplement Education for Multi-family Housing Managers (공동주택 관리인을 위한 보수교육 개선에 관한 연구)

  • 김선중;권명희;전창미
    • Journal of the Korean housing association
    • /
    • v.15 no.2
    • /
    • pp.75-85
    • /
    • 2004
  • The purpose of this study was to make improvement plan of supplement education for multifamily housing managers. It had investigated a difficult degree of managerial work and troubles of education through questionnaires by 144 housing manager in Ulsan. Analysis methods adopted in this study were frequency, percentage, mean, one-way ANOVA by the SPSS 10.0 for windows program. The parts of evaluation tool were composed of maintenance, operating management, residential life management. The evaluation tool got contents through the documents research, present education contents and questions on the Internet. Likert summated scale(5 point) was used. The results of study showed that a difficult degree of managerial work in the residential life management was the highest. A difficult degree of maintenance work was the highest on the defect examination and decision of repair method of equipment facilities and construct frame. The degree of difficulty of the operating management was high on the homepage management through Internet and well-being progress of housing managers.

Study of maintenance behavior based on the experience of the tooth brushing instruction for implant patient (임플란트 환자의 잇솔질 교육경험에 따른 유지관리행태 연구)

  • Jeon, Ji-Hyun;Min, Hee-Hong
    • Journal of Korean society of Dental Hygiene
    • /
    • v.13 no.3
    • /
    • pp.403-410
    • /
    • 2013
  • Objectives : This study aims to provide the basic data for the maintenance and management of healthy implants through finding out the educational experience of toothbrushing and the oral hygiene management for the implant patients and to determine the maintenance measure. Methods : From April 1 to october 1, 2012, 250 patients in the dental clinic in Daejeon completed the self-reported questionnaire. Results : As for the educational experience of toothbrushing, 66.4 percent received the training for toothbrushing and 33.6 percent had not received the training for toothbrushing. Those who brushed three times a day accounted for 74.1 percent. Those who received the training for toothbrushing comprised 56.0 percent and took regular check up of every 6 months. Approximately 50.0% received regular scaling service every 6 months. Periodical medical check up comprised 55.6% among those who received toothbrushing education. Approximately 63.9% thought that periodical medical check up is the most important to maintain oral health. Conclusions : There were important factors for oral health. They were tooth-brushing, the utilization of various oral hygienic products, and the awareness of importance of oral hygiene management. The customized education program for the general public should be implemented as regular as possible.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

Integrating Machine Reliability and Preventive Maintenance Planning in Manufacturing Cell Design

  • Das, Kanchan;Lashkari, R.S.;Sengupta, S.
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.2
    • /
    • pp.113-125
    • /
    • 2008
  • This paper presents a model for designing cellular manufacturing systems (CMS) by integrating system cost, machine reliability, and preventive maintenance (PM) planning. In a CMS, a part is processed using alternative process routes, each consisting of a sequence of visits to machines. Thus, a level of 'system reliability' is associated with the machines along the process route assigned to a part type. Assuming machine reliabilities to follow the Weibull distribution, the model assigns the machines to cells, and selects, for each part type, a process route which maximizes the overall system reliability and minimizes the total costs of manufacturing operations, machine underutilization, and inter-cell material handling. The model also incorporates a reliability based PM plan and an algorithm to implement the plan. The algorithm determines effective PM intervals for the CMS machines based on a group maintenance policy and thus minimizes the maintenance costs subject to acceptable machine reliability thresholds. The model is a large mixed integer linear program, and is solved using LINGO. The results point out that integrating PM in the CMS design improves the overall system reliability markedly, and reduces the total costs significantly.

A Study on the degree of Residents' Dissatisfaction and Recognition to the Apartment Management Fee (아파트 관리비에 대한 거주자의 인지도 및 불만족에 관한 연구)

  • 김진영;강순주
    • Journal of the Korean housing association
    • /
    • v.9 no.3
    • /
    • pp.1-11
    • /
    • 1998
  • This study is intended to analyze residents' dissatisfaction and recogonition to the apartment management fee. The subjects of the study were 244 female residents who live in Seoul and who were surveyed by questionnaire from 15th of Nov. to 20th of Dec., 1997. Satistical method used were: frequency, percentage, mean, Cronbach's α, Factor Analysis, one-way ANOVA, DMR test, t-test Pearson Correlation and Regression by SPSS program. The main results of this study are as follows: 1) The resident didn't mostly know how to account the apartment management fee. 2) The degree of recogonition to distribution of the special maintenance contracts was the lowest level. 3) It was the most dissatisfactory factor not to show items of the special maintenance contracts. 4) The correlation coefficient of residents' dissatisfaction and recognition to the apartment management fee was negative.

  • PDF

Development and Operational Test of the Free Semester Program Education in Arboreta and Botanical Gardens: Focusing on 'Gardener for a Day' Program in Korea National Arboretum

  • Yun, Do-Lee;Yoon, Mi-Jeong
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.3
    • /
    • pp.289-298
    • /
    • 2019
  • As part of the free semester program, the 'Gardener for a day' program in the Korea National Arboretum was newly developed in 2018. The program was developed as a free semester program reflecting the works of a 'gardener' who performs the planning, preparation, maintenance and management of exhibition gardens. This 'Gardener for a day' program was applied to a total of 106 middle school students in October 2018. Educational elements were extracted from Korea National Arboretum exhibition gardens and career exploration of gardeners. The program was designed to provide education on theory and practices, including watching the gardener video, visiting the gardener booth, meeting with actual gardeners at Korea National Arboretum, visiting two exhibition gardens, and participating in three types of practical training as a gardener. A survey about program satisfaction and education was conducted after the program to analyze the students' satisfaction with the program (contents, management, instructor), free semester program (career planning, occupational attitude, independence), and education (awareness of forest biospecies, preservation will). The analysis showed that the following results: satisfaction with the program (score 4.0), free semester program (score 3.8), and education (score 4.0). Comparative analysis of the pretest-posttest questionnaires showed that there were significant educational effects in career planning, occupational attitude, and awareness of forest biospecies.

A Investigation on the Actual Condition of PV Maintenance on Residental Buildings

  • Lee, Eung-Jik
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.53-58
    • /
    • 2014
  • Residental photovoltaic power system achieved remarkable results in distribution and activation through 'One Million Green Homes Program' led by the government. However, system maintenance and management after installation are relative unsatisfactory. Thus, problems, such as malfunctioning, decrease in efficiency, breakage, etc, are occurring in succession which means that expensive facilities are not used effectively. This study attempted to propose a more preferred alternative to the photovoltaic power system currently applied and installed to the housing by investigating and analyzing the said system, identifying management practices, and deriving problems. For this study, 48 houses equipped with photovoltaic systems in J City were chosen and they were analyzed after preliminary research and field investigation. The results revealed that most of the surveyed systems in J City are still in fairly good conditions. But the instruction and information regarding the appropriate operational management of those surveyed systems have not been delivered to the owner. Therefore, promotion education and related manual deployment should be done by the contractor. In terms of installation, inadequate system location and some warranty services are required to be improved, which are usually caused by a lack of careful planning and construction. In addition, the follow-up management needs to be provided about five years later after installation considering system deterioration.