• Title/Summary/Keyword: loosening load

Search Result 62, Processing Time 0.024 seconds

A Study on the Characteristics of Tunnel Based on the Rock Mass Classification (암반분류법에 근거한 터널 특성 연구)

  • Lee Song;Ahn Tae-Hun
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.3
    • /
    • pp.19-25
    • /
    • 2005
  • A tunnel that uses the RMR method or the Q-system is called a 'modem tunnel' because the New Austrian Tunneling Method (NATM) is not employed, even though shotcrete and rock bolts are used as support. It is known that the modem tunnel, which is supported by shotcrete, is basically different from the conventional tunnel, which is supported by steel ribs. In order to preserve the load-carrying capacity of the rock mass, loosening and excessive rock deformations must be minimized. Although it is known that this can be achieved by applying shotcrete in the case of the modem tunnel, this has not been clearly demonstrated. In order to inspect the distinctions between the conventional tunnel and the modern tunnel, their support characteristics and the rock loads of the rock mass classifications are compared. Terzaghi's rock load classification was used as the conventional tunnel's representative rock mass classification. The RMR method and the Q-system were adopted as the modem tunnel's representative rock mass classification. The study's results show that the load-carrying capacity of shotcrete, when used as the main support in the modern tunnel, is greater than the load-capacity of the steel ribs used in the conventional tunnel. Because it has been verified that the rock loads of their rock mass classifications are not different, then, according to the rock mass classifications, the load-carrying capacity of the rock mass of the modern tunnel, which uses shotcrete, is not greater than that of the conventional tunnel.

A Numerical Study on the Response of the Tibial Component in Total Knee Arthroplasty to Longitudinal Impact (인공무릎관절 전치환술에 있어 축방향 충격에 의한 Tibial Component의 응답 특성 분석 연구)

  • 조용균;조철형;최재봉;이태수;최귀원
    • Journal of Biomedical Engineering Research
    • /
    • v.19 no.5
    • /
    • pp.503-511
    • /
    • 1998
  • In this study, the stress distribution for different tibial components was observed In order to Investigate the load transfer and potential failure mechanism of the tibial components subjected to dynamic impact loading and also to evacuate the effect of bone-implant bonding conditions on the implant system. The 3-dimensional finite element models included an intact tibia, cemented metal-backed tibial component, uncemented metal-blocked tibial component, cemented all-polyethylene tibial component, and metal-backed component with a debonded bone/stem interface. The results showed that the cemented metal-hocked component Induced slightly higher peak stress at stem tip than the uncemented component. The peak stress of the all-polyethylene tibia1 component at stem trip showed about half thats of metal-backed tibial components. The all-polyethylene component showed a similar dynamic response to intact tibia. In case of debonded bone/stem interface, the peak stress below the metal tray was three times Higher than that of the fully bonded interface and unstable stress distribution at the stem tip was observed with time, which causes another adverse bone apposition and implant loosening. Thus, the all-polyethylene tibial component bonded fully to the surrounding bone might be most desirable system under an impact loading.

  • PDF

Removal torque of a two-piece zirconia abutment with a novel titanium component in an internal connection implant system after dynamic cyclic loading (새로운 타이타늄 구성요소를 사용한 내부연결 임플란트용 지르코니아 지대주의 동적하중 후 나사 제거력)

  • Lee, Joo-Hee
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.55 no.2
    • /
    • pp.151-155
    • /
    • 2017
  • Purpose: The aim of this study was to evaluate screw removal torque of the two-piece zirconia abutment with the novel titanium component compared to the conventional one-piece titanium abutment in the internal connection implant before and after dynamic cyclic loading. Materials and methods: Two types of the abutment assemblies with internal connection were prepared and divided into the groups; titanium abutment-titanium abutment screw assemblies as control, and zirconia abutment-titanium socket-titanium abutment screw assemblies as experimental group. A total of 12 abutments and implants were used of six assemblies each group. Each assembly was tightened to 30 Ncm. A cyclic load of 300 N at an angle of 30 degrees in reference to the loading axis was applied until one million cycles or failure. The removal torque values (RTVs) of the abutment screws were measured with a digital torque gauge before and after cyclic loading. The RTVs of the pre load and post load were analyzed with t-test, and P-values < .05 were considered statistically significant. Results: The assemblies of both groups survived all after the dynamic cyclic loading test without screw loosening. The statistically significant differences were found between the mean RTVs before and after the cyclic loading in both groups (P < .05). The RTV differences for the control and the experimental group were $-7.25{\pm}1.50Ncm$ and $-7.33{\pm}0.93Ncm$, respectively. Statistical analysis revealed that the RTV differences in both groups were not significantly different from each other (P > .05). Conclusion: Within the limitation of this study, the two-piece zirconia abutment with the titanium component did not show a significant RTV difference of the abutment screw compared to the titanium abutment after dynamic cyclic loading.

PHOTOELASTIC ANALYSIS OF STRESS INDUCED BY FIXED PROSTHESES WITH RIGID OF NONRIGID CONNECTION BETWEEN NATURAL TOOTH AND OSSEOINTEGRATED IMPLANT (골육착성 보철 치료시 임플랜트와 자연 지대치와의 연결 방법에 따른 관탄성 응력 분석)

  • Kim, Young-Il;Chung, Chae-Heon;Cho, Kyu-Zong
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.31 no.2
    • /
    • pp.271-300
    • /
    • 1993
  • The purpose of this study was to analyze the stress distribution at supporting bone according to the types of connection modality between implant and tooth in the superstrcture. This investigation evaluated the stress patterns in a photoelastic model produced by three different types of dental implants such as Branemark, Steri-Oss, IMZ and resin tooth using the techniques of quasi three dimensional photoelasticity. The teeth-supported bridge had a first molar pontic supported by second premolar and second molar as a control group. The implant and toothsupported bridge had a first molar pontic supported by second premolar and implant posterior retainer as an experimental group. Prostheses were mechanically connected to an adjacent second premolar by the rigid of nonrigid connection, Nonrigid connection used an attachment placed between the tooth-supported and fixture-supported component. The female(keyway) of attachment was placed on the distal end of the retainer supported by the tooth ; the male(Key) of attachment connected to the osseointegrated bridge was engaged into the keyway. All prostheses were casted in the same nonprecious alloy and were cemented and screwed on their respective abutments and implants. 16㎏ of vertical loads on central fossae of second premolar, first molar pontic, implant of second molar were applied respectively and 6.5㎏ of inclined load on middle buccal surface of first molar pontic was applied. The results were as follows : 1. Under the vertical load on the central fossa of first mloar pontic, the stress developed at the apex of tooth of implat was more uniformly distributed in the case of nonrigid connection than in the case of rigid connection. 2. Under the vertical load on the central fossa of first molar pontic, the stress developed around the cervical area of tooth of implant was larger in the case of rigid connection than in the case of nonrigid connection because the bending moment was more occured in the case of rigid connection than in the case of nonrigid connection. 3. Stress was more restricted to the loaded side of nonrigid connection than to that of rigid connection 4. Under the inclined load. The set screw loosening of implant was more easily occured in the case of nonrigid connection than in the case of rigid connection due to torque moment. 5. In the case of Branemark implant, the stress concentration in second premolar was larger and the stress developed around the cervical area of implant was lower than any other cases under the vertical load, because Branemark implant with the flexible gold screw was showed in incline toward second premolar by a bending moment. 6. The stress developed around the apex of tooth or implant was more uniformly distributed in the case of Steri-Oss implant with stiff screw than in the case of Branemark implant under the vertical load. But, the stress developed around the cervical area of the Steri-Oss implant was larger than that of any other implants because bending moment was occured by vertical migration of second premolar. 7. The stress distribution in the case of IMZ implant was similar to the case of natural teeth under small vertical load. But, the residual stress around the implant was showed to occurdue to deformation of IMC and sinking of screw under larger vertical load.

  • PDF

A Damage Measurement of Steel Beam using PZT Sensor (PZT센서를 이용한 철골보 손상계측)

  • Seo, Hye-Won;Park, Min-Suk;Lee, Swoo-Heon;Shin, Kyung-Jae
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.5
    • /
    • pp.477-485
    • /
    • 2010
  • Various monitoring sensors are used to predict and detect structural damage. Smart sensors, such as glass-fiber sensors, PZT, and MEMS, among others, have replaced traditional sensors. They are now being used in many areas. This study aims to predict the damage by measuring the PZT voltage attached on the specimen by the applied impact load. In the experiment to detect damages in beam connection, simple $H-400{\times}200{\times}8{\times}13$ beams were spliced with bolts. The results of FFT between PZT sensor and accelrometer were compared to measure the sensitivity of the PZT sensor. The damage to the beam was presumed by loosening the bolt, and then the damage measurement was accompanied. Secondly, a steel $PL600{\times}65{\times}5.8$ plate beam was fabricated for the purpose of experimenting on damage measurement. Impact loading test on three different locations was carried out. Damage width varied between 6~42mm on both sides by cutting, using a steel saw. The ratio of frequencies before and after the damage was computed to quantify the damage level by using FFT, and the change in mode pattern with the increased damage was investigated to measure the damage.

A case study on the bolt failure of the moving parts of a marine diesel engine (선박용 디젤기관의 운동부 볼트 손상사례에 대한 연구)

  • Kim, Jong-Ho;Lee, Jae-Hyun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.41 no.1
    • /
    • pp.118-124
    • /
    • 2017
  • To investigate and analyze the cause of the failure of the connecting rod bolt and the crank pin bearing bolt of the diesel engine of this study, the following results were obtained through site surveying, the investigation of literature referring to similar failures, testing and inspection of the fracture surface, and the experience of the researchers. The fractured crank pin bearing bolt of the diesel engine is estimated to be damaged later than the connecting rod bolt. From the shape of fracture surface, it is evident that the failed connecting rod bolt is fractured by fatigue failure due to abnormally repeated loads (e.g. loosening of the connecting bolt, etc.), and is not failed by brittle fractures due to the impact load. The surface of the U-nut on the fractured connecting rod bolt has been worsening due to the improper use of lubricant (agent for prevention of thread fixing) and no usage of separating the each connecting rod on each cylinder. Moreover, there is the possibility that those poor surface conditions of the fractured connecting rod bolt have affected the failure of the connecting rod bolt of the main engine. And it could be assumed that the mechanical characteristic and manufacturing process of the failed connecting rod bolt and crank pin bearing bolt, which were made by a domestic company, conform to the design requirements for those bolts.

A study on the micromotion between the dental implant and superstructure (임플란트와 상부구조물 사이의 micromotion에 관한 연구)

  • Kim, Ji-Hye;Song, Kwang-Yeob;Jang, Tae-Yeob;Park, Ju-Mi
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.19 no.1
    • /
    • pp.17-25
    • /
    • 2003
  • Treatment with implants of single tooth missing cases is both functional and esthetic. Although the success rate of single-tooth implant treatments is increasing, sometimes it makes some problems. Problems with single-tooth implant treatments include soft tissue complications, abutment screw fracture, and most commonly, abutment screw loosening, and these involve the instability of the dental implant-superstructure interface. This study investigated and compared dental implant screw joint micromotion of various implant system with external connection or internal connection when tested under simulated clinical loading, Six groups (N=5) were assessed: (1) Branemark AurAdapt (Nobel Biocare, Goteborg, Sweden), (2) Branemark EsthetiCone (Nobel Biocare, Goteborg, Sweden), (3) Neoplant Conical (Neobiotec, Korea), (4) Neoplant UCLA (Neobiotec, Korea), (5) Neoplant 5.5mm Solid (Neobiotec, Korea), and (6) ITI SynOcta (Institute Straumann, Waldenburg, Switzerland). Six identical frameworks were fabricated. Abutment screws were tightened to 32-35 Ncm and occlusal screw were tightened to 15-20 Ncm with an electronic torque controller. A mechanical testing machine applied a compressive cyclic load of 20kg at 10Hz to a contact point on each implant crown. Strain gauge recorded the micromotion of the screw joint interface once a second. Data were selected at 1, 500, 5,000, 10,000, 20,000, 30,000, 40,000 and 50,000 cycle and 2-way ANOVA test was performed to assess the statistical significance. The results of this study were as follows; The micromotion of the implant-superstructure in the interface increased gradually through 50,000 cycles for all implant systems. In the case of the micromotion according to cycle increase, Neoplant Conical and Neoplant UCLA system exhibited significantly increasing micromotion at the implant-superstructure interface (p<0.05), but others not significant. In the case of the micromotion of the implant-superstructure interface at 50,000 cycle, the largest micromotion were recorded in the Branemark EsthetiCone, sequently followed by Neoplant Conical, Neoplant UCLA, Branemark AurAdapt, ITI SynOcta and Neplant Solid. Internal connection system showed smaller micromotion than external connection system. Specially, Neoplant Solid with internal connection system exhibited significantly smaller micromotion than other implant systems except ITI SynOcta with same internal connection system (p<0.05). In the case of external connection, Branemark EsthetiCone and Neoplant Conical system with abutment showed significantly larger micromotion than Branemark AurAdapt without abutment (p<0.05).

Comparison of Splices between Bolts and Welding Spliced PHC Piles (볼트 수직이음 PHC말뚝와 용접이음 PHC말뚝의 이음부 거동 비교)

  • Kim, Myunghak;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.12
    • /
    • pp.93-103
    • /
    • 2018
  • Behaviors of splices between bolts and welding spliced PHC piles using the tensile strength test were analyzed. The bolts spliced PHC piles, which were tightened over $200N{\cdot}m$ tightening torque, showed straight V shaped line at splices at the lowest 20 N load. Both sides of PHC piles stayed straight, so the full section of bolts spliced piles did not show the unifying behavior, which was the most important performance requirement as pile. Other bolts spliced PHC piles, tightened with $20N{\cdot}m$ loosening torque, also showed the same straight V shaped line at splices for each step of loading. The full section of bolts spliced piles did not return to the initial position after each step of unloading and did not show the elastic material behavior. The splices quality of bolts spliced piles is much lower than that of welding spliced piles with respect to displacement of splices during each step of loadings, residual displacements during each step of unloadings, and failure loads. Results showed that bolts spliced PHC piles, tightened with both over $200N{\cdot}m$ and as low as $20N{\cdot}m$ torque, fell short of performance requirements of spliced PHC pile.

A study on the field application of high strength steel pipe reinforcement grouting (고강도 강관 보강 그라우팅의 현장 적용성에 관한 연구)

  • Shin, Hyunkang;Jung, Hyuksang;Ryu, Yongsun;Kim, Donghoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.455-478
    • /
    • 2019
  • In this paper, we conducted experimental investigation on the field applicability through the verification of reinforcement effect of the steel pipe reinforcement grouting using high strength steel pipe. SGT275 (formerly known as STK400) steel pipe is generally applied to the traditional steel pipe reinforcement grouting method. However, the analysis of tunnel collapse cases applying the steel pipe reinforcement grouting shows that there are cases where the excessive bending and breakage of steel pipe occur. One of the reasons causing these collapses is the lack of steel pipe stiffness responding to the loosening load of tunnels caused by excavation. The strength of steel pipe has increased due to the recent development of high strength steel pipe (SGT550). However, since research on the reinforcement method considering strength increase is insufficient, there is a need for research on this. Therefore, in this study, we conducted experiments on the tensile and bending strength based on various conditions between high strength steel pipe, and carried out basic research on effective field application depending on the strength difference of steel pipe through the conventional design method. In particular, we verified the reinforcement effect of high strength steel pipe through the measurement results of deformed shape and stress of steel pipe arising from excavation after constructing high strength steel pipe and general steel pipe at actual sites. The research results show that high strength steel pipe has excellent bending strength and the reinforcement effect of reinforced grouting. Further, it is expected that high strength steel pipe will have an arching effect thanks to strength increase.

Removal Torque Values of Retaining Screws Tightened to Implant-Supported Prosthesis with Different Connection Systems by Various Tightening Technique (다른 연결 시스템을 갖는 임플랜트 상부 구조물에서 조임술식에 따른 지대주 나사의 풀림 토크값에 대한 연구)

  • Kim, Dong-Wook;Choi, Yu-Sung;Jo, In-Ho
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.27 no.4
    • /
    • pp.343-358
    • /
    • 2011
  • As implant treatment has become popular, lots of different shapes and materials of the implant upper component have been supplied. And there are also diverse reports about failures including loosening of the abutment screw which is one of the most common reason. Purpose : The purpose of this study is to find out how different screw tightening orders and methods influence on screw loosening according to the different connection systems. The upper component was fabricated by casting method. After fabricating master models that are precisely attached to the upper component, 5 experimental models each for the external connection system and internal connection system were fabricated using splinting impression technique. First, to find out the influence of the screw tightening order, screws were tightened in 3 orders; 1-2-3-4, 2-3-1-4, 2-4-3-1. After tightening, removal torque values (RTV) of each group was measured. And also to find out the influence of screw tightening method, a model with 2-3-1-4 screw tightening order was tightened with 30 Ncm at one time(1-step method) and the RTV was compared with the same order group (2-3-1-4) in the 2 step method. In the external connection system, RTV appeared significantly lower in group 2-3-1-4 than group 2-4-3-1 (p<0.05). And also in the internal connection system, the RTV of group 2-3-1-4 appeared significantly lower than that of group 2-4-3-1 and 1-2-3-4 (p<0.05). When comparing the tightening number of the screw without considering the screw tightening order, the first tightened screw appeared significantly higher RTV than the second one in the external connection system (p<0.05), however there was no significant difference from the first tightened screw to the last tightened screw in the internal connection system. And there was no statistically significant difference between the two screw tightening methods in both internal and external connection system. In the comparison of external and internal connection system, each RTV appeared 16.27 Ncm and 14.25 Ncm and appeared as a statistically significant difference (p<0.05). There was a significant difference in RTV measured according to the screw tightening order. The lowest RTV appeared in the groups started tightening from the middle. There was also a significant difference in RTV between the two connection system groups. A further study is needed to find out the influence factors in RTV and also a study is required related to the load condition.