• Title/Summary/Keyword: long term crest settlement

Search Result 6, Processing Time 0.017 seconds

A Study on Crest Settlement Characteristics of Rockfill Dam (락필댐의 정부침하 거동특성 연구)

  • Park, Han-Gue;Park, Dong-Soon;Kim, Yong-Seong;Lee, Jong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1219-1226
    • /
    • 2005
  • In this study, crest settlement characteristics of CFRD (Concrete Faced Rockfill Dam) and ECRD (Earth Cored Rockfill Dam) were analysed through the instrumentation data from representative 7 large dams in Korea. Also, We have studied the effect of valley shape and uniaxial compressive strength of intact rock to better understand the impact of the parent rock strength and the valley shape on the long term crest settlement of CFRDs. From the results, we found that the valley shape and strength of intact rock on crest settlement of dams are an important parameters. As a result, we obtained that the maximum crest settlement of CFRD is larger than that of ECRD and long term crest settlement rate per dam height of rockfill dams is less than 0.60% during service period.

  • PDF

Crest Settlement Prediction of Concrete Faced Rock-Fill Dam After Initial Impounding (CFRD의 담수 후 정부침하량 예측)

  • Kim, Yong-Seong;Park, Han-Gyu;Lim, Heui-Dae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.349-354
    • /
    • 2005
  • In this study, settlement characteristics of 23 CFRD was investigated from monitoring data and the method to estimate the crest settlements considering internal settlement during constructions was proposed. Moreover, crest settlement smaller than 20cm and deflection of face slab smaller than 20cm are not considered to be critical to the stability of large dam whose height is over 40m. Therefore, we assigned the region as safe zone that can be used as a guideline of maintenance of dam. These estimated data can be used in the design, construction and long-term maintenance in domestic CFRD hereafter.

  • PDF

Analysis of post-construction deformation characteristics of concrete faced rockfill dams

  • Kim, You-Seong;Won, Myoung-Soo;Song, Young-Chul;Yoon, Deok-Joong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.528-541
    • /
    • 2007
  • To get the possible for management and maintenance, it was analyzed the deformation characteristics, such as crest of embankment and concrete face slab, and leakage of concrete faced rockfill dams (CFRD). There are trends that embankment deformation depends on intact strength used rockfills rather than dam height, deformation normal to concrete face slab during the first reservoir filling is occurred more than 80% of the total deformation in general, and the magnitude and trend of concrete face slab deformation is similar to post-construction crest settlement. The results showed that the range of post-construction crest settlement suggested by Sherard and Cooke (1987), and Clements (1984) had a good agreement in the cases using rockfill with very high intact strength, but it had a trend which underestimated crest settlement in the cases using rockfill with medium to high intact strength. The maximum leakage rate in general was observed during the first reservoir filling and long-term leakage rate was rapidly increased when the dam height exceeds approximately 120m.

  • PDF

The Stability Evaluation of Concrete Face Rockfill Dam(CFRD) Using Settlement Measured at the Dam Crest and Kelvin Model (계측자료 및 Kelvin 모델에 의한 콘크리트 표면차수벽형 석괴댐(CFRD)의 안정성 평가)

  • Lee, Heeman;Lim, Heuidae;Cho, Gyechun;Song, Kiil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.11
    • /
    • pp.33-46
    • /
    • 2013
  • Recently, the projects which are to increase the capacity of the flood control are being actively performed because of the abnormal climate changes throughout the country. In this study, the regression analysis was performed using both Kelvin model and the real settlement measured at the crest of the existing concrete face rockfill dam(CFRD) to estimate the long-term deformation behavior characteristics such as creep which occurs without additional load. In addition, the effects on changes in physical properties (E, G, K) of the dam construction materials by deformation characteristics of the dam were evaluated, and the reasonable stability analysis method of the dam was proposed to obtain the long-term stability considering the changes in physical properties induced by the long-term deformation behavior in case of heightening the existing dams.

Long-term Settlement Prediction of Center-cored Rockfill Dam using Measured Data (계측자료를 이용한 중심코어형 석괴댐의 장기침하량 예측)

  • Lee, Chungwon;Kim, Yongseong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.11
    • /
    • pp.21-27
    • /
    • 2014
  • In this study, the prediction methods for the crest settlement after impounding and the maximum internal settlement during dam construction were proposed through the analysis on settlement data at 46 monitored points of 37 Center-Cored Rockfill Dams (CCRDs). Results from this analysis provided that the crest settlement increases with elapsed time, and from the relationship between the dam height and the maximum internal settlement during dam construction, it is confirmed that the internal settlement was largely evaluated when the coarse-grained material was used as the dam core. This internal settlement increased in proportion to the dam height. In addition, the crest settlement of the CCRD with the core compacted with fine-grained material was relatively large. It is expected that the results of this study would provide the practical tool for the design, construction and management of CCRDs.

Assessment of The Priority Order of Monitoring Devices on Maintenance for The Long-Term Safety of Existing Fill Dam (기존 필댐 장기간 안전관리를 위한 계측항목 유지보수 우선순위 산정)

  • Lee, Jongwook;Jeon, Jaesung;Lim, Heuidae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.67-79
    • /
    • 2009
  • Although readjustment of monitoring system for existing fill dam maintenance is needed by the sustainable increasing of the abandonment rate of monitoring devices by malfunction through the life-cycle of dam, monitoring plans for long-term dam safety has relied on the experience and the opinion of minor expert group without systematic and quantitative analysis on the failure modes and the priority order of monitoring devices on maintenance. In this study the priority order of monitoring devices of existing 5 fill dams was evaluated quantitatively based on the preceding study (Andersen et al, 1999) and the result recommended the establishment of real-time monitoring system for seepage, pore pressure and crest settlement as the readjustment plan for existing fill dam monitoring system. This readjustment plan matches well with the recommendation of PWRI (1984), JCOLD (1986) and the results from Bagherzadeh-Khakkahali and Mirghasemi (2005).

  • PDF