• 제목/요약/키워드: long term crest settlement

검색결과 6건 처리시간 0.023초

락필댐의 정부침하 거동특성 연구 (A Study on Crest Settlement Characteristics of Rockfill Dam)

  • 박한규;박동순;김용성;이종욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1219-1226
    • /
    • 2005
  • In this study, crest settlement characteristics of CFRD (Concrete Faced Rockfill Dam) and ECRD (Earth Cored Rockfill Dam) were analysed through the instrumentation data from representative 7 large dams in Korea. Also, We have studied the effect of valley shape and uniaxial compressive strength of intact rock to better understand the impact of the parent rock strength and the valley shape on the long term crest settlement of CFRDs. From the results, we found that the valley shape and strength of intact rock on crest settlement of dams are an important parameters. As a result, we obtained that the maximum crest settlement of CFRD is larger than that of ECRD and long term crest settlement rate per dam height of rockfill dams is less than 0.60% during service period.

  • PDF

CFRD의 담수 후 정부침하량 예측 (Crest Settlement Prediction of Concrete Faced Rock-Fill Dam After Initial Impounding)

  • 김용성;박한규;임희대
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.349-354
    • /
    • 2005
  • In this study, settlement characteristics of 23 CFRD was investigated from monitoring data and the method to estimate the crest settlements considering internal settlement during constructions was proposed. Moreover, crest settlement smaller than 20cm and deflection of face slab smaller than 20cm are not considered to be critical to the stability of large dam whose height is over 40m. Therefore, we assigned the region as safe zone that can be used as a guideline of maintenance of dam. These estimated data can be used in the design, construction and long-term maintenance in domestic CFRD hereafter.

  • PDF

Analysis of post-construction deformation characteristics of concrete faced rockfill dams

  • Kim, You-Seong;Won, Myoung-Soo;Song, Young-Chul;Yoon, Deok-Joong
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.528-541
    • /
    • 2007
  • To get the possible for management and maintenance, it was analyzed the deformation characteristics, such as crest of embankment and concrete face slab, and leakage of concrete faced rockfill dams (CFRD). There are trends that embankment deformation depends on intact strength used rockfills rather than dam height, deformation normal to concrete face slab during the first reservoir filling is occurred more than 80% of the total deformation in general, and the magnitude and trend of concrete face slab deformation is similar to post-construction crest settlement. The results showed that the range of post-construction crest settlement suggested by Sherard and Cooke (1987), and Clements (1984) had a good agreement in the cases using rockfill with very high intact strength, but it had a trend which underestimated crest settlement in the cases using rockfill with medium to high intact strength. The maximum leakage rate in general was observed during the first reservoir filling and long-term leakage rate was rapidly increased when the dam height exceeds approximately 120m.

  • PDF

계측자료 및 Kelvin 모델에 의한 콘크리트 표면차수벽형 석괴댐(CFRD)의 안정성 평가 (The Stability Evaluation of Concrete Face Rockfill Dam(CFRD) Using Settlement Measured at the Dam Crest and Kelvin Model)

  • 이희만;임희대;조계춘;송기일
    • 한국지반환경공학회 논문집
    • /
    • 제14권11호
    • /
    • pp.33-46
    • /
    • 2013
  • 본 연구는 최근 기상이변의 영향으로 활발히 진행 중인 댐 치수능력사업의 일환으로, 운영 중인 콘크리트 표면차수벽형석괴댐(Concrete Face Rockfill Dam, CFRD)에서 측정된 계측결과와 시간 의존적 점탄성모델인 Kelvin 모델을 회귀분석하여 댐완공 이후 추가적인 하중증가 없이도 발생되고 있는 크리프(Creep)와 같은 댐의 장기 변형특성을 예측하고, 이와 같은 댐의 변형특성이 댐 제체를 구성하는 재료의 물리적 특성치(E, G, K) 변화에 미치는 영향을 분석하였다. 또한 댐의 장기적인 변형거동에 따른 물리적 특성치 변화가 댐 안정성에 미치는 영향과 댐 증고 시 댐의 장기적인 안정성 확보를 위한 합리적인 댐 안정성 평가방법을 제시하였다.

계측자료를 이용한 중심코어형 석괴댐의 장기침하량 예측 (Long-term Settlement Prediction of Center-cored Rockfill Dam using Measured Data)

  • 이충원;김용성
    • 한국지반환경공학회 논문집
    • /
    • 제15권11호
    • /
    • pp.21-27
    • /
    • 2014
  • 본 연구에서는 37개의 CCRD에 대한 계측자료(46개 지점)를 통해 댐 축조단계에서 얻어지는 계측자료를 이용하여 담수 후 댐의 정부침하량 및 내부침하량 예측기법을 제안하였다. 전체 데이터에 대한 분석 결과, 담수 후 시간경과에 따라 정부침하량이 함께 증가함이 확인되었으며, 댐 코어의 재료를 조립질과 세립질의 2가지 유형으로 구분한 댐 높이와 시공 중 최대 내부침하량의 관계로부터 조립질 재료를 사용 시의 내부침하량이 다소 크게 평가되었다. 또한 내부침하량은 댐 높이에 비례하여 증가하였으며, 댐 코어로서 세립질 재료를 사용하는 경우의 정부침하량이 상대적으로 크게 평가되었다. 본 연구결과는 향후 CCRD의 설계, 시공, 장기적 유지관리를 위한 유용한 도구가 될 것으로 전망된다.

기존 필댐 장기간 안전관리를 위한 계측항목 유지보수 우선순위 산정 (Assessment of The Priority Order of Monitoring Devices on Maintenance for The Long-Term Safety of Existing Fill Dam)

  • 이종욱;전제성;임희대
    • 한국지반환경공학회 논문집
    • /
    • 제10권7호
    • /
    • pp.67-79
    • /
    • 2009
  • 댐의 경과년수에 따라 고장으로 폐기되는 매설계기의 지속적인 증가로 인해 기존 필댐의 유지관리를 위한 계측시스템의 재정립이 필요한 상황이지만 필댐의 파괴모드와 계측기의 중요도에 대한 체계적이고 정량적인 분석 없이 과거의 경험과 소수 전문가의 자문의견에만 의존하여 유지관리 계측계획을 수립하고 있는 실정이다. 본 연구에서는 선행연구(Andersen 등, 1999)를 기초로 하여 5개 기존 필댐 계측항목의 중요도를 정량적으로 분석하여 우선순위를 산정한 결과로서 상세 외관조사와 함께 침투수량계, 표면 침하점, 간극수압계에 대한 상시 모니터링 체계의 구축을 기존 필댐 계측시스템의 재정립 방안으로 제시하였으며 이것은 일본토목연구소(1984), 일본 대댐회(국토교통성, 1986)의 권고사항과 Bagherzadeh-Khakkahali와 Mirghasemi(2005)의 분석결과와도 잘 일치하는 것으로 나타났다.

  • PDF