• Title/Summary/Keyword: long duration load

Search Result 60, Processing Time 0.026 seconds

Stochastic Method to Assess Voltage Sag Performance Considering Sag Duration in Large Power System (대규모 계통에서의 순간전압강하 지속시간을 고려한 추계적 평가 방법)

  • Lee, Myeong-Cheol;Park, Chang-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.30 no.2
    • /
    • pp.85-92
    • /
    • 2016
  • The paper presents a method to assess system voltage sag performance considering sag durations as well as magnitudes. In general, voltage sag assessment for large power systems is performed only considering sag magnitudes at sensitive load points. However some equipment can be affected by certain sag durations. The duration of the voltage sag is depend on the time of fault current flow in the system. Therefore, the duration can be determined by analyzing the operating characteristic of the protection system. In this paper, an effective method to evaluate sag durations regarding the characteristics and failure rates of the protection system is described. The proposed method can be used to assess the long-term performance of the voltage sags in large power system.

An Efficient Revenue/Profit Evaluation Method Based on Probabilistic Production Costing Technique (확률적 운전비계산 모형에 기초한 발전기 수입/순익 평가 방법론 개발)

  • 박종배;신중린;김민수;전영환
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.638-646
    • /
    • 2002
  • This paper presents an efficient algorithm for evaluating the Profit and revenue of generating units in a competitive electricity market based on the probabilistic production costing technique. The accurate evaluation of the profit and revenue of generating units for long-term perspectives is one of the most important issues in a competitive electricity market environment. For efficient calculation of the profit and revenue of generating units under the equivalent load duration curve(ELDC), a new approach to figure out the marginal plants and the corresponding market clearing prices during a time period in a probabilistic manner is developed. The mathematical formulation and illustrative application of the suggested method is presented.

A Study on the Applicability of Load Duration Curve for the Management of Nonpoint Source Pollution in Seohwacheon Basin (서화천 유역 비점오염원 관리를 위한 부하지속곡선 적용성 연구)

  • KAL, Byung-Seok;MUN, Hyun-Saing;HONG, Seon-Hwa;PARK, Chun-Dong;MIN, Kyeong-Ok;PARK, Jae-Beom
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.3
    • /
    • pp.174-191
    • /
    • 2020
  • In this study, we analyzed the vulnerable areas of non-point source pollutants and management pollutants and management time by subwatershed curves in the Seohwacheon basin located upstream of Daecheongho. First, in order to create a load duration curve, a long-term flow model SWAT was constructed to create a flow duration curve, and the result was multiplied by the target water quality to create a load duration curve. For the target water quality, monitoring data values measured from November 2017 were used for the management of nonpoint source pollutants in Seohwacheon, and a value corresponding to 60 percentile of the measured data was set as the target water quality. At this time, the target water quality was limited to"slightly good"(II) when the calculated value exceeded"slightly good"(II) of the river living environment standard. The vulnerable areas of non-point source of pollution were selected using the excess rate exceeding the target water quality, and the excess pollutant was judged as a management substance and the management time was selected through seasonal evaluation.

An Experimental Study on the Dynamic Load Characteristics of Surface Mount Device(SMD) (칩마운트 (SMD) 장비의 동하중(動荷重) 발생특성에 관한 실험적 연구)

  • Baek, Jae-Ho;Lee, Hong-Ki;Kim, Kang-Boo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.1913-1917
    • /
    • 2000
  • SMD Equipment convey an electronic parts at high speed, then assemble parts into a circuit board, and it develop a long time-duration dynamic force to be caused by moving mass. Vibration problem to be caused by SMD Equipment have an effect on micro-meter level's precision production process, directly, and dynamic stability of building. In the cause of quantitatively access about its vibration problem, input information(or data) of structure dynamic analysis need accuracy information of dynamic load. Determination of Dynamic load is various kinds of method using experimental and theory. In this paper, we got dynamic load using direct measurement method. We expect that an study on the dynamic load characteristic of SMD can be used to Equipment development of low level vibration and basis information of structure dynamic analysis.

  • PDF

Variation of Load Management Incentive Considering Prenotification Period (예고기간별 차이를 반영한 부하조정제도 지원금 차등방안)

  • Won, Jong-Ryul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.11
    • /
    • pp.1578-1583
    • /
    • 2012
  • There are 3 systems in incentive-based normal load management in Korea; day or hour-ahead, week-ahead, months-ahead. These are originally similar in their operational implementation, but differ in their pre-notification period. Therefore the incentive of these systems should be different according to prenotification period. This is the key problem in implementing these load managements. Customers participating in these load managements feel their economic differences, depending on the risk by prenotification dates. The shorter prenotification period, the more risk take the customers. This paper proposes the method of incentive variation in prenotification difference, by using the theory of financial yield curve, which is used in analysing short and long duration bond interesting rates and is reflecting risk premium in their period.

Development of Freeway Incident Duration Prediction Models (고속도로 돌발상황 지속시간 예측모형 개발)

  • 신치현;김정훈
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.3
    • /
    • pp.17-30
    • /
    • 2002
  • Incident duration prediction is one of the most important steps of the overall incident management process. An accurate and reliable estimate of the incident duration can be the main difference between an effective incident management operation and an unacceptable one since, without the knowledge of such time durations, traffic impact can not be estimated or calculated. This research presents several multiple linear regression models for incident duration prediction using data consisting of 384 incident cases. The main source of various incident cases was the Traffic Incident Reports filled out by the Motorist Assistant Units of the Korea Highway Corporation. The models were proposed separately according to the time of day(daytime vs. nighttime) and the fatality/injury incurred (fatality/injury vs. property damage only). Two models using an integrated dataset, one with an intercept and the other without it, were also calibrated and proposed for the generality of model application. Some findings are as follows ; ?Variables such as vehicle turnover, load spills, the number of heavy vehicles involved and the number of blocked lanes were found to significantly affect incident duration times. ?Models, however, tend to overestimate the duration times when a dummy variable, load spill, is used. It was simply because several of load spill incidents had excessively long clearance times. The precision was improved when load spills were further categorized into "small spills" and "large spills" based on the size of vehicles involved. ?Variables such as the number of vehicles involved and the number of blocked lanes found not significant when a regression model was calibrated with an intercept. whereas excluding the intercept from the model structure signifies those variables in a statistical sense.

Long-term behavior of segmentally-erected prestressed concrete box-girder bridges

  • Hedjazi, S.;Rahai, A.;Sennah, K.
    • Structural Engineering and Mechanics
    • /
    • v.20 no.6
    • /
    • pp.673-693
    • /
    • 2005
  • A general step-by-step simulation for the time-dependent analysis of segmentally-erected prestressed concrete box-girder bridges is presented. A three dimensional finite-element model for the balanced-cantilever construction of segmental bridges, including effects of the load history, material nonlinearity, creep, shrinkage, and aging of concrete and the relaxation of prestressing steel was developed using ABAQUS software. The models included three-dimensional shell elements to model the box-girder walls and Rebar elements representing the prestressing tendons. The step-by-step procedure allows simulating the construction stages, effects of time-dependent deformations of materials and changes in the structural system of the bridges. The structural responses during construction and throughout the service life were traced. A comparison of the developed computer simulation with available experimental results was conducted and good agreement was found. Deflection of the bridge deck, changes in stresses and strains and the redistribution of internal forces were calculated for different examples of bridges, built by the balanced-cantilever method, over thirty-year duration. Significant time-dependent effects on the bridge deflections and redistribution of internal forces and stresses were observed. The ultimate load carrying capacities of the bridges and the behavior before collapse were also determined. It was observed that the ultimate load carrying capacity of such bridges decreases with time as a result of time-dependent effects.

Analysis of Load Duration Curve Using Long Time Flow Measurement Data of Kyeongancheon (장기간 유량측정 자료를 이용한 경안천의 부하지속곡선 특성)

  • Noh, Changwan;Kwon, Phil-Sang;Jung, Woo-Seok;Lee, Myung-Gu;Cho, Yong-Chul;Yu, Soonju
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.1
    • /
    • pp.35-48
    • /
    • 2019
  • Long term flow measurement and water quality analysis data need to determine the target and allowable load for each basin in Total Water Pollution Load Management System (TWPLMS). The Load Duration Curve (LDC) is analyzed the relationship between flow data and water quality, and evaluates the pollutant load characterization by flow conditions. LDC of Kyeongancheon is created by the Flow Duration Curve (FDC) that was analyzed 8-day interval measured flow data from 2006 to 2015 and numeric water quality target in Kyeongancheon. As a result of this study, it is necessary to manage the point source pollutant because the numeric water quality target is not satisfied in the low flows. Also the numeric water quality target has been exceed for four months from March to June of the year and continuous and systematic watershed management is required to satisfy the numeric water quality target.

A simplified method for determining the acceleration amplitudes of long-span floor system under walking/running loads

  • Cao, Liang;Chen, Y. Frank
    • Structural Engineering and Mechanics
    • /
    • v.75 no.3
    • /
    • pp.377-387
    • /
    • 2020
  • Modern long-span floor system typically possesses low damping and low natural frequency, presenting a potential vibration sensitivity problem induced by human activities. Field test and numerical analysis methods are available to study this kind of problems, but would be inconvenient for design engineers. This paper proposes a simplified method to determine the acceleration amplitudes of long-span floor system subjected to walking or running load, which can be carried out manually. To theoretically analyze the acceleration response, the floor system is simplified as an anisotropic rectangular plate and the mode decomposition method is used. To facilitate the calculation of acceleration amplitude aP, a coefficient αwmn or αRmn is introduced, with the former depending on the geometry and support condition of floor system and the latter on the contact duration tR and natural frequency. The proposed simplified method is easy for practical use and gives safe structural designs.

Classification Methods for Automated Prediction of Power Load Patterns (전력 부하 패턴 자동 예측을 위한 분류 기법)

  • Minghao, Piao;Park, Jin-Hyung;Lee, Heon-Gyu;Ryu, Keun-Ho
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2008.06c
    • /
    • pp.26-30
    • /
    • 2008
  • Currently an automated methodology based on data mining techniques is presented for the prediction of customer load patterns in long duration load profiles. The proposed our approach consists of three stages: (i) data pre-processing: noise or outlier is removed and the continuous attribute-valued features are transformed to discrete values, (ii) cluster analysis: k-means clustering is used to create load pattern classes and the representative load profiles for each class and (iii) classification: we evaluated several supervised learning methods in order to select a suitable prediction method. According to the proposed methodology, power load measured from AMR (automatic meter reading) system, as well as customer indexes, were used as inputs for clustering. The output of clustering was the classification of representative load profiles (or classes). In order to evaluate the result of forecasting load patterns, the several classification methods were applied on a set of high voltage customers of the Korea power system and derived class labels from clustering and other features are used as input to produce classifiers. Lastly, the result of our experiments was presented.

  • PDF