• 제목/요약/키워드: logging road

Search Result 33, Processing Time 0.026 seconds

Progression of Restoration of Soil Physical Properties and Vegetation in Logging Roads - In Case of 9 Years Results after Construction of Logging Road - (벌채지내(伐採地內) 운재로(運材路)의 토양물리성(土壤物理性) 및 식생(植生)의 회복과정(回復過程) - 운재로(運材路) 개설(開設)이후 9년 경과의 경우 -)

  • Woo, Bo-Myeong;Kim, Kyung-Hoon;Park, Jae-Hyeon;Choi, Hyung-Tae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.18-27
    • /
    • 1998
  • To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.

  • PDF

Influences of Environmental Factors on Soil Erosion of the Logging Road in Timber Harvested Area (성숙임목벌채지(成熟林木伐採地)에서 운재로(運材路)의 침식(浸蝕)에 미치는 환경요인(環境要因)의 영향(影響))

  • Park, Jae-Hyeon;Woo, Bo-Myeong;Jeong, Do-Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.84 no.2
    • /
    • pp.239-246
    • /
    • 1995
  • This research aimed at the contribution to obtaining the scientifical data which were required for planning she environmentally sound and sustainable management, particularly in the field of the logging road construction. Main natural environmental variables including natural vegetation, rainfall, soil runoff were measured in the logging road on-sites and analysed. This project was carried out at the (mt.)Paekunsan Research sorest of Seoul National University, located in Gwangyang, Chollanam-do in southern part of Korea, from 1993 to 1994. 1. The explanatory variables for erosion and sedimentation on logging road surface were accumulated rainfall, erosion distance, cross-sectional gradient, and soil hardness. The erosion and sedimentation on logging road was increasing positively in proportion to the accumulated rainfall, soil distance from starting point of the logging road, and cross-sectional gradient. 2. On cut-slope of logging road, cut-slope shape, part of the slope, plant coverage, soil hardness, sand content, accumulated rainfall, clay content, and silt content were effective factors. Cut-slope erosion and sedimentation on logging roam increased as with the lower plant coverage, the lower accumulated rainfall, the high sand content in the soil. 3. On fill-slope of logging road, there were three significant variables such as total rainfall and number of rainfall-storm. Fill-slope erosion and sedimentation had a positive correlation with the amount of rainfall, the number of rainfall, the soil hardness. 4. The total erosion and sedimentation on logging road were $5.04{\times}10^{-2}m^2/m^2$ in logging road construction year, $7.37{\times}10^{-2}m^2/m^2$ in next year. The erosion and sedimentation on logging road surface were 32.7% of total erosion and sedimentation on Logging road in construction year, and 57.1% in next year, respectively. The erosion and sedimentation on cut-slopes were 30.4% on logging road in construction year, fill-slopes of total erosion and sedimentation and 21.0% in next year, respectively. The erosion and sedimentation on fill-slopes were 36.9% on logging road in construction year, 21.9 in next year. To decrease the erosion and sedimentation at the logging road from the beginning stage of construction, the effective revegetation works should be implemented on the cut-slope and fill slopes, and erosion control measures such as optima. road design must be constructed on read surface.

  • PDF

A Study on Sub-base Composition Effect of Forest Road Using Geosynthetics for Passage of Large Logging Trucks (대형 목재운송차량 통행에 적합한 토목섬유 활용 임도 노반조성 효과분석)

  • Hwang, Jin-seong;Ji, Byoung-yun;Kweon, Hyeong-keun;Lee, Kwan-hee
    • Journal of Korean Society of Forest Science
    • /
    • v.107 no.3
    • /
    • pp.287-293
    • /
    • 2018
  • This study was carried out to provide surface bearing capacity reinforcement of forest road by sub-base facilities based on a soft ground use of geosynthetics to prevent the damage of the road surface passing heavy logging trucks and to pass smoothly heavy truck against growing timber harvesting. The analysis of the road surface bearing capacity as progressing time and the increase of the number of passage of heavy logging trucks were conducted experimental section of forest road on the soft ground in the Forest Technology and Management Research Center. As a result, it was found that the road surface bearing capacity were stabilized at CBR of 15% or more, the effect of reinforcement by type of geosynthetics showed no significant difference after the lapse of about 1 year. After reaching the passage of 300 times for the heavy logging trucks on the sub-base construction section, the settlements was stabilized below the allowable standard of 50 mm, road surface bearing capacity also improved to more than CBR 20% and there was no significant difference in the thickness of the sub-base. However, in the section where the sub-base is not constructed, it is found that the lack of surface bearing capacity with the settlements more than the allowable standard is not possible to pass the heavy logging trucks. Therefore, in order to reinforce the road surface bearing capacity of the soft ground for the passage of the heavy logging trucks, it is necessary to construct a sub-base of at least 0.2 m when using geosynthetics.

Variations of Soil Bulk Density and Natural Revegetation on the Logging Road of Timber Harvested-Sites (벌채적지(伐採跡地) 운재로(運材路)의 토양가밀도(土壤假密度) 변화(變化)와 자연식생회복(自然植生回復)에 관한 연구(硏究))

  • Woo, Bo-Myeong;Park, Jae-Hyeon;Kim, Kyung-Hoon
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.4
    • /
    • pp.545-555
    • /
    • 1994
  • The objective of the study was to provide the useful scientific data on the early rehabilitation of the legging road after timber harvesting in the forest area. This study was carried out at logging roads which were constructed during 1989 and 1994 in Mt. Baekwoon. The field survey was conducted in July, 1991. Judging from the analysis of soil bulk density, time required for recovery as the undisturbed forest soil condition was more than 10 years in the road which was left, and the regression equation is as follows, $$Y_1=1.4195-0.0744{\cdot}X(R^2=0.91)$$ $$Y_2=1.4673-0.0688{\cdot}X(R^2=0.73)$$ (X : elapsed year after road construction. $Y_1$, $Y_2$ : soil bulk density($g/cm^3$) at 0~7.5cm, and 7.5~15.0cm, respectively) Especially soil bulk density with buffer strip-woods was $0.890-0.903g/cm^3$, so it was 20% lower than that of logging road surface without buffer strip-woods. Among the 7 factors, location, sand content, and soil hardness had statistically significant effect on the soil bulk density in logging road surface. The pioneer species on logging road surface were Rhus cratargifolius, Prunus chinensis, and Lespedeza cyrtobotrya, etc. in woody species, and Pteridium aquilinum, Arundinella hirta, and Lysimachia clethroides, etc. in herb species. So, in process of year, average plant coverage were 70% on cutting and banking slope and 20% on logging road surface which elapsed 6 years after logging road construction. Through this research, buffer strip-woods must be remained for environmental conservation of forest conditions, and from the time to be closed the road, planting, seeding, and grazing works could be effective to the soil condition and vegetation recovery.

  • PDF

Development of Computer Program for the Arrangement of the Forest-road Network to Maximize the Investment Effect on the Forest-road Construction (임도개설(林道開設)에 있어서 투자효과(投資效果)를 최대(最大)로 하는 임도배치(林道配置)프로그램 개발(開發))

  • Park, Sang-Jun;Son, Doo-Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.90 no.4
    • /
    • pp.420-430
    • /
    • 2001
  • The object of this study is to develop a computer program for the arrangement of the forest-road network maximizing the investment effect in forest-road construction with factors such as terrains, forest physiognomy, management plan, logging system, cost of forest-road construction, capacity of inputted labour, capacity of timber production and so on. The operating system developed by this study is Korean Windows 95/98 and Microsoft Visual Basic ver. 5.0. User interface was designed as systematic structure, it is presented as a kind of GUI(graphic user interface). The developed program has result of the most suitable forest-road arrangement, has suitable forest-road density calculated with cost of logging, cost of forest-road construction, diversion ratio of forest-road, cost of walking in forest. And the most suitable forest-road arrangement was designed for forest-road arrangement network which maximized investment effect through minimizing the sum of cost of logging and cost of forest-road construction. Input data were divided into map data and control data. Digital terrain model, division of forest-road layout plan, division of forest function and the existing road network are obtained from map data. on the other hand, cost of logging related terrain division, diversion ratio of forest-road and working road, cost of forest-road construction, cost of walking, cost of labor, walking speed, capacity of inputted labor, capacity of timber production and total distance of forest-road are inputted from control data. And map data was designed to be inputted by mesh method for common matrix. This program can be used to construct a new forest-road or vice forest-road which compensate already existing forest-road for the functional forestry.

  • PDF

A Study on the Correlation of Resistivity and Rock Quality (전기비저항과 암반등급의 상관관계에 대한 고찰)

  • 권형석;신중호;황세호;백환조;김기석;김종수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.81-88
    • /
    • 2001
  • Electrical resistivity is one of physical property of the earth and measured by electrical resistivity survey, electrical resistivity logging and laboratory test. Recently, electrical resistivity is widely used in determination of rock quality in road and railway tunnel design. To get more reliable rock quality data from electrical resistivity, it needs a lot of test and study on correlation of resistivity and rock quality. Firstly, we did rock property test in laboratory, such as uniaxial compressive strength(UCS), p wave velocity, Young's modulus and electrical resistivity. We correlate each test results and we found out that electrical resistivity has exponentially related to UCS and P wave velocity and linearly related to Young's modulus. And we accomplished electrical resistivity survey in field site and carried out electrical resistivity logging at in-situ area. Also we peformed rock classification, such as RQD, RMR and Q-system and we correlate electrical resistivity to rock classification results. We found out that electrical resistivity logging data are highly correlate to RQD, Q and RMR. Also we found out that electrical resistivity survey data are lower than electrical resistivity logging data when there are faults or fractures. And it cause electrical resistivity survey data to lowly correlate to RQD, Q and RMR.

  • PDF

Logging for a Stone Column Using Crosshole Seismic Testing (크로스홀 탄성파 시험을 이용한 쇄석말뚝의 검측)

  • Kim, Hak-Sung;Mok, Young-Jin
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.139-145
    • /
    • 2010
  • An integrity testing for stone columns was attempted using crosshole S-wave logging. The method is conceptionally quite similar to the crosshole sonic logging (CSL) for drilled piers. The critical difference in the logging is the use of S-wave rather than P-wave, which is used in CSL, because swave is the only wave sensing the stiffness of slower unbounded materials than water. An electro-mechanical source, which can generate reversed Swave signals, was utilized in the logging. The stone column was delineated using the S-wave travel times across the stone column, the S-wave velocity profile of the crushed stone($V_{cs}$-profile) and that of surrounding soil($V_s$-profile). In the calculation of $V_{cs}$-profile of the crushed stone, its friction angle and Ko (coefficient of lateral earth pressure at rest) are recommended to be used. The calculation of the column diameter is not much affected by the values of friction angle and Ko.

An Analysis of the Operational Cost in the Whole-tree and Cut-to-Length Logging Operation System (전목 및 단목 집재작업시스템에서 작업비용 분석)

  • Kim, Min-Kyu;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.2
    • /
    • pp.229-238
    • /
    • 2013
  • This study was conducted to analyze on the operational cost of logging operations in the whole-tree logging operation system by tower-yarder and swing-yarder, and in the cut-to-length logging operation system by excavator with grapple in order to spread efficient logging operation technique and to establish the logging operation system. In the results of the analysis of operation cost, in case of the whole-tree logging operation system, the operation cost was 2,099 won/$m^3$ in felling by chain saw, 28,286 won/$m^3$ in yarding by tower-yarder, 18,265 won/$m^3$ in yarding by swing-yarder, 18,939 won/$m^3$ in bucking by excavator with grapple and chain saw, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle. In case of the cut-to-length logging operation system, the operation cost was 10,160 won/$m^3$ in felling and bucking by chain saw, 7,567 won/$m^3$ in cut-to-length extraction by excavator with grapple, 6,982 won/$m^3$ in branches and leaves extraction by excavator with grapple, 3,040 won/$m^3$ in the operation road construction by excavator with grapple, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle.

Speed Index of Logging Truck in Forest Road (임도에서 운재차량의 속도지수)

  • Lee, Joon Woo
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.138-149
    • /
    • 1996
  • This study was aimed at predicting to running speed related to alignment factors of forest road, and recommending the improvement method of forest road construction using the running speed of vehicles. For these purposes, this study proceeds to select forest roads after reviewing the planning papers and maps, to measure the road alignment factors such as longitudinal gradient, width of roadway, radius of curve, length of curve, superelevation, and conditions of road surface on the subject forest road. It was found that the average running speed of logging truck showed lower value than that of the expected speed of 'Forest Road Construction Regulations and Rules', and the average running speed of loaded truck showed 70-85% of the speed of empty truck. According to the road conditions, speed index (reductive ratio of running speed) was also calculated with respect to radius of curve, longitudinal dradient. The results of the study on the running speed of vehicle subject to the alignment of forest roads make it possible for one to judge the quality of the existed and to be constructed forest roads, to select the structure of forest road to improve the running speed of vehicle on forest road.

  • PDF

A Case Study for Rock Mass Classification using Geophysical Exploration (물리탐사에 의한 터널구간의 암반등급 산정)

  • 김기석;권형석;김종훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06b
    • /
    • pp.119-137
    • /
    • 2003
  • Electrical resistivity is one of physical property of the earth and measured by electrical resistivity survey, electrical resistivity logging and laboratory test. Recently, electrical resistivity Is widely used In determination of rock quality in road and railway tunnel design. To get more reliable rock quality data from electrical resistivity, it needs a lot of test and study on correlation of resistivity and rock quality. Firstly, we did rock property test In laboratory, such as uniaxial compressive strength(UCS), P wave velocity, Young's modulus and electrical resistivity. We correlate each test results and we found out that electrical resistivity has exponentially related to UCS and P wave velocity and linearly related to Young's modulus. And we accomplished electrical resistivity survey in field site and carried out electrical resistivity togging at In-situ area. Also we performed rock classification, such as RQD, RMR and Q-system and we correlate electrical resistivity to rock classification results. We found out that electrical resistivity logging data are highly correlate to RQD, Q and RMR. Also we found out that electrical resistivity survey data are lower than electrical resistivity logging data when there are faults or fractures. And it cause electrical resistivity survey data to lowly correlate to RQD, Q and RMR.

  • PDF