• 제목/요약/키워드: loading scheduling

검색결과 60건 처리시간 0.023초

조선산업에서의 블록 배량계획과 일정계획에 관한 연구 (A Study on Loading and Scheduling of Assembly Block in Shipbuilding)

  • 김기동;전인우;김태현
    • 산업기술연구
    • /
    • 제22권B호
    • /
    • pp.61-70
    • /
    • 2002
  • The shipbuilding scheduling has many possible alternatives because of its long time horizon and a lot of jobs, so it is required that the scheduling system can generate and search feasible alternatives rapidly. The scheduling in the assembly shop is initiated by allocating, namely loading, the assembly blocks to each shop. In this step, the resource capacities (such as available man/hour, available crane) of each shop must be considered. The result of loading without above consideration can make the scheduling result based on that infeasible or worse one. In this paper, we developed the optimal scheduling system of shipbuilding, specifically for loading and scheduling of assembly block, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general-purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives. Also, in order to enhance the system performance, we conducted various experiments of ILOG search strategies. The experimental results showed that the impact of search strategies is significant.

  • PDF

계층적 클러스티링 방법을 통한 컨테이너 적재순서 결정 방법 (The Method of Container Loading Scheduling through Hierarchical Clustering)

  • 홍동희
    • 한국컴퓨터정보학회논문지
    • /
    • 제10권1호
    • /
    • pp.201-208
    • /
    • 2005
  • 오늘날 컨테이너터미널의 운영방식의 변화를 통해 컨테이너터미널의 효율을 증대시키기 위한 대처방안에 대한 연구가 활발히 이루어지고 있다. 컨테이너터미널의 효율을 증대시키기 위해서는 적하계획 수립이 상당히 중요한 역할을 한다. 적하계획은 크게 적재의 위치를 결정하는 문제와 적재의 순서를 결정하는 문제로 나눌 수 있는데, 본 논문에서는 보다 효율적인 적재순서 결정 방안을 제시한다. 컨테이너 적재순서 결정 문제는 장치위치 및 운영 장비 등 여러 가지 경우의 수를 고려해야 하는 조합 최적화 문제이다. 컨테이너 적재순서를 결정하는 기존의 클러스터 구성방식은 재처리 문제로 작업의 효율성을 높이는데 한계가 있다. 따라서 선적지시서와 야드맵을 기초로 동일한 속성을 가진 컨테이너들을 계층적 클러스터링 방법을 적용하여 스택단위의 클러스터로 구성하고, 작업순서의 제약을 정의하는 보다 효율적인 컨테이너 적재순서결정 방법을 제안한다. 그 과정에서 작업순서 제약을 정의함으로서 클러스터간의 가능한 작업경로를 파악할 수 있고, 작업경로에 대한 제약적 탐색이 가능하여 기존의 방식에 비해 탐색효율이 증가됨을 알 수 있다.

  • PDF

공구이송이 가능한 유연제조시스템에서의 공구 할당 및 스케쥴링을 위한 발견적 기법 (A Heuristic Algorithm for Tool Loading and Scheduling in a Flexible Manufacturing System with an Automatic Tool Transporter)

  • 박상실;김영대
    • 대한산업공학회지
    • /
    • 제21권1호
    • /
    • pp.119-135
    • /
    • 1995
  • We consider problems of tool loading and scheduling in a flexible manufacturing system (FMS) in which tool transportation constitutes the major portion of material flows. In this type of FMSs, parts are initially assigned to machines and released to the machines according to input sequencing rules. Operations for the parts released to the machines are performed by tools initially loaded onto the machines or provided by an automatic tool transport robot when needed. For an efficient operation of such systems, therefore, we may have to consider loading and scheduling problems for tools in addition to those for parts. In this paper, we consider three problems, part loading, tool loading, and tool scheduling problems with the overall objective of minimizing the makespan. The part loading problem is solved by a method similar to that for the bin packing problem and then a heuristic based on the frequency of tool usage is applied for tool loading. Also suggested are part input sequencing and tool scheduling rules. To show the effectiveness of the overall algorithm suggested here, we compare it with an existing algorithm through a series of computational tests on randomly generated test problems.

  • PDF

FMS 부하할당과 일정계획에 대한 통합적 접근법 (An Integrated Approach for Loading an Scheduling of a Flexible Manufacturing System)

  • 우상복;김기태;정대영;박진우
    • 대한산업공학회지
    • /
    • 제25권3호
    • /
    • pp.298-309
    • /
    • 1999
  • In this study, we attempt to solve the loading and scheduling problems of an FMS in an integrated manner. We propose an integrated approach and its solution methodologies which can fully exploit the flexibility of an FMS effectively and make decisions about tool allocation, machine selection, and job sequencing simultaneously. The proposed approach consists of two main modules : 'schedule generating module' which makes partial schedules and 'tool-allocation checking module' which investigates the feasibility of tool-allocation for unscheduled tasks. Utilizing two interacting modules, we can finally settle the loading and scheduling problems. Experimental results show that in most cases the proposed integrated approach outperforms existing hierarchical approaches in the scheduling performance and the computational time required. In addition to that, the difference between the two approaches tends to increase when the number of part types and the number of alternative machines increase and the tool constraints become tight. To conclude, the experimental results show that the proposed approach is a viable one for solving practical problems.

  • PDF

배선 및 선박운항일정계획에 관한 연구 -유조선의 운항일정계획을 중심으로- (A Study on Cargo Ships Routing and Scheduling Emphasis on Crude Oil Tanker Scheduling Problems)

  • 허일
    • 한국항해학회지
    • /
    • 제14권1호
    • /
    • pp.21-38
    • /
    • 1990
  • This paper discusses the various modes of operations of cargo ships which are liner operations, tramp shipping and industrial operations, and mathematical programming, simulation , and heuristic method that can be used to solve ships routing and scheduling problems for each of these operations. In particular, this paper put emphasis on a crude oil tanker scheduling problem. The problem is to achieve an optimal sequence of cargoes or an optimal schedule for each ship in a given fleet during a given period. Each cargo is characterized by its type, size, loading and discharging ports, loading and discharging dates, cost, and revenue. Our approach is to enumerate all feasible candidate schedate schedules for each ship, where a candidate schedule specifies a set of cargoes that can be feasibly carried by a ship within the planning horizon , together with loading and discharging dates for each cargo in the set. Provided that candidate schedules have been generated for each ship, the problem of choosing from these an optimal schedule for each ship is formulated as a set partitioning problem, a set packing problem, and a integer generalized network problem respectively. We write the PASCAL programs for schedule generator and apply our approach to the crude oil tanker scheduling problem similar to a realistic system.

  • PDF

FMS의 생산계획 및 일정계획을 위한 의사결정을 위한 의사결정 지원시스템의 개발 (Development of an integrated decision support system for FMS production planning and scheduling problems)

  • 장성용;장병만;박진우
    • 경영과학
    • /
    • 제8권1호
    • /
    • pp.51-70
    • /
    • 1991
  • This paper discusses planning and scheduling problems for efficient utilization of an FMS and presents an integrated decision support system for FMS production planning and scheduling problems. The decision support system, FMSDS(Flexible Manufacturing Systems Decision Support System), includes of data of handling module, part selection module, loading module, load adjusting module, scheduling module and simulation module etc. This paper includes the solution methodology of each subproblem. And an integrated interface scheme between the subproblems is presented. The interface scheme considers the relationships between the subproblems and generates solution using hierarchical and looping approaches. FMSDS is made up of six alternative models considering 3 loading objectives and 2 production order processing strategies. Performance comparisons among 6 alternatives and other decision support systems are shown using the non-terminating simulation techniques.

  • PDF

A Mixed Integer Programming Model for Bulk Cargo Ship Scheduling with a Single Loading Port

  • Seong-Cheol Cho
    • 한국항해학회지
    • /
    • 제22권4호
    • /
    • pp.15-19
    • /
    • 1998
  • This paper concerns a bulk or semibulk cargo ship scheduling problem with a single loading port. This type of ship scheduling problem is frequently needed in real world for carrying minerals or agricultural produce from a major single production zone to many destinations scattered over a large area of the world. The first optimization model for this problem was introduced by Ronen (1986) as a nonlinear mixed integer program. The model developed in this paper is an improvement of his model in the sense that nonlinearities and numerous unnecessary integer variables have been eliminated. By this improvement we could expect real world instances of moderate sizes to be solved optimal solutions by commercial integer programming software. Similarity between the ship scheduling model and the capacitated facility location model is also discussed.

  • PDF

유연생산시스템의 일정계획에 관한 연구 (A Scheduling Model for FMS)

  • 이동춘;신현재
    • 품질경영학회지
    • /
    • 제20권1호
    • /
    • pp.136-146
    • /
    • 1992
  • Most of scheduling papers on FMS have been considered that the fabrication process, the machining process and the assembly process etc. are independent and the releasing, routing, dependent, batching, loading problem are treated separetely. In this paper, we discuss that the integrated scheduling problem which can be solved for efficient use. We combine two systems that each process system which in order to produce a product is treated dependently, the releasing and the routing problem are combined one system and we present the efficient flexible manufacturing system as including the alternate process.

  • PDF

유연 생산 시스템의 일정계획 모형에 관한 연구 (A study on the Scheduling Model for FMS)

  • 이상완;신대혁
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.43-50
    • /
    • 1995
  • Generally scheduling papers focused on the processing time only. But this paper intend to develope the scheduling problem which deal with the precessing time, transport time between machine and processing cost in a flexible manufacturing system(FMS) simultaneously. And this work considers a releasing, loading and alternative routing problem together. As a case study, numerical example is demonstrated to show the simplicity and the effectiveness of the proposed model.

  • PDF

Transmission Scheduling Algorithm with Cell Loading Control in a DS/CDMA Cellular System

  • Yu, Zhi-cheng
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2002년도 하계종합학술대회 논문집(1)
    • /
    • pp.85-88
    • /
    • 2002
  • Maintaining a proper level of cell lead, system throughput can be maximized by a transmission rate control over the uplink in DS/CDMA cellular system to support integrated services of real-time and delay-tolerant traffic. We find that the cell load-based rate control scheme can be further enhanced by taking the varying channel condition into account In conjunction with some fair scheduling algorithm. Our simulation results show that the proposed scheme outperforms the original cell load-based rate control with the round-robin sharing scheduling scheme.

  • PDF