• Title/Summary/Keyword: line test

Search Result 4,445, Processing Time 0.031 seconds

Development and Test of Automatic/Driverless Operation System for Standardized EMU (표준전동차 자동/무인운전장치 개발 및 주행시험)

  • 안태기;이수길;한성호;이관섭
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.3
    • /
    • pp.154-160
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design and testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control and Monitoring System), ATO(Automatic Train Operation), ATC(Automatic Train Control), and TWC(Train to Wayside Communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

A Study for on-Line Test of Electric Devices in KHST (KHST 차량 전기장치의 본선시운전시험에 관한 연구)

  • 한영재;김기환;목진용;김종영;이병석;최종선;김정수
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.138-143
    • /
    • 2003
  • KHST(Korean High-Speed Train, 350km/h), composed of 7 cars that are 2 power cars, 2 motorized car and 3 trailer cars, has been developed and is under on-line test. To verify hte design requirements about the functions and traction performances of this train, KRRI(Korea Railroad Research Institute) decided to evaluate traction performances of the train during on-line test. For this purpose, such as torque, velocity, voltage and current, must be measured. BRRI has developed the measurement system that can be measured vast and various signals effectively. In this paper, we introduce traction performances of KHST. The traction measurement items are focused on the verification of motor block performances.

  • PDF

Characteristics of Lightning Impulse Current of Zno Block for Transmission Line Arrester with External Gap (송전선로에 사용되는 갭형 피뢰기 소자의 뇌임펄스 전류특성)

  • Cho, Han-Goo;Yoo, Dae-Hoon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.04b
    • /
    • pp.61-62
    • /
    • 2009
  • This paper describes the characteristics of lightning impulse current of ZnO block for transmission line arrester with external gap. The ageing parameters of lightning arresters ate impulse current, moisture ingress, temperature ageing and so on. Especially it is important to estimate the change of electrical characteristics by impulse current. Total energy applied to the ZnO arrester each time is $4/10{\mu}s$, 30kA and $2/20{\mu}s$, 10kA impulse current. Before and After the test, the residual voltage variation of varistors passed was below 5%. According to the test, it is thought that the ZnO arrester shows good stability with impulse current test.

  • PDF

Test operation and development of Automatic/Driverless operation system for the standardized type EMU (표준전동차 자동/무인운전기술 개발 및 시운전에 관한 연구)

  • 한성호;안태기;이수길;이관섭;김원경;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.172-179
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design iかd testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control md Monitoring System), ATO(Automatic train Operation), ATC(Automatic train Control), and TWC(Train to wayside communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

Characteristics of Lightning Impulse Current of ZnO Block for Transmission Line Arrester with External Gap (송전선로에 사용되는 갭형 피뢰기 소자의 뇌임펄스 전류특성)

  • Cho, Han-Goo;Yoo, Dae-Hoon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.06a
    • /
    • pp.458-459
    • /
    • 2007
  • This paper describes the characteristics of lightning impulse current of ZnO block for transmission line arrester with external gap. The ageing parameters of lightning arresters are impulse current, moisture ingress, temperature ageing and so on. Especially it is important to estimate the change of electrical characteristics by impulse current. Total energy applied to the ZnO arrester each time is $4/10{\mu}s$, 30kA and $2/20{\mu}s$, 10kA impulse current. Before and After the test, the residual voltage variation of varistors passed was below 5%. According to the test, it is thought that the ZnO arrester shows good stability with impulse current test.

  • PDF

Filter Test for Partial Discharge Detection of Underground Distribution Cables (지중배전케이블의 PD 검출용 필터 시험 연구)

  • Lee, Yong-Sung;Kim, Jung-Yoon;Lee, Kwan-Woo;Choi, Yong-Sung;Park, Dae-Hee
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2005.07a
    • /
    • pp.215-216
    • /
    • 2005
  • To decrease and remove of much noises that is detected in PD (partial discharge) measuring test. we forced on detection of those. We made W-LC filter for measuring PD. which adapted that to field test. We tested after design laboratory circumstances like field line. and then the phase change properties of detected signal in UHF sensor were measured by Lemke Probe and oscilloscope (TDS-3054. Tektronix). Eventually we checked decrement of noises from experimental result. Also from experimental result at the joint box of 22.9[kV] distribution line. we obtained reasonable data which enable noises to decrease. Hereafter those results will be adapted at ultra-high voltage for trouble prevention and on-line cable watch. diagnosis of those.

  • PDF

A Study on the Integrated Computer Program for the Multi Analysis of In-Situ Aquifer and Geothermal Response Test (현장 열응답시험과 현장 대수성시험결과를 동시 분석 가능한 통합전산 Program에 관한 연구)

  • Hahn, Jeong-Sang;Han, Hyuk-Sang;Yonn, Yun-Sang
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.4 no.1
    • /
    • pp.11-19
    • /
    • 2008
  • Groundwater flow in confined aquifer and heat transport in underground geologic media are using same governing equation(line source) like well fuction. Therefore the conventional slope method using only later data obtained from in-situ thermal response test to determine the thermal conductivity of vertical geothermal heat exchanger(GHEX) is basically identical with one of Theis straight line method of aquifer test under artesian condition. In case that the pumping rate(Q, $m^3$/d) and drawdown(s,m) which are used for input data of existing hydrogeologic computer programs for aquifer test are replaced and converted to supplying heat energy per unit length of bore hole(Q/L,w/m or Kcal/h.m) and temperatures (T,$^{\circ}C$)measured at in and out-let of GHEX as in put data respectively, thermal conductivity around geothermal heat exchanger can be easily estimated without any special modification of the existing hydrogeologic computer program. Two numbers of time series temperature variation data obtained from in situ geothermal response test are analized using Theismethods(standard curve and straight line method) by using existing aquifer test program and conventional Slope method proposed by ASHRAE. The results show that thermal conductivity values estimated by two straight methods are identical and the difference of estimated values between standard curve methods and Slope method are also within acceptable ranges. In general,the thermal conductivity estimated from Theis straight linemethod gives more accurate value than the one of Slope method due to that Slope method uses only visual matching otherwise Theis method uses automatic curve matching estimation with reducing RSS.

  • PDF

Performance Test and Calculation of Recirculation Line in Propellant Feeding System (기체공급계 재순환배관의 성능시험 및 계산)

  • Kwon, Oh-Sung;Cho, Nam-Kyung;Chung, Yong-Gahp;Han, Sang-Yeop;Kim, Young-Mog
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.11 no.2
    • /
    • pp.9-17
    • /
    • 2007
  • The performance test of recirculation line in propellant feeding system was carried out. Liquid oxygen was used as cryogenic propellant and helium was used as recirculation promotion gas. Tests were done in cases at atmospheric pressure and at pressure of 4 barg in the ullage space of propellant tank. Liquid oxygen recirculation flowrate with helium injection flowrate and temperature distribution along the line were measured. There was appropriate helium injection flowrate for gas-lift recirculation system. Test data were used to make calculation program by test data correlation method. In this paper the procedure of calculation was presented and the results were compared to test data.

Test Process Execution Tool: Test PET (테스트 프로세스 수행 도구)

  • 천은정;최병주
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.10 no.2
    • /
    • pp.125-133
    • /
    • 2004
  • In order to test reflecting the features of a development methodology and domain, it is required to tailor process standards and perform testing according to the tailored process. However, since commercial testing tools support only a part of the tailored process, it is essential to either acquire or develop testing tools appropriate for a development environment. This paper proposes a method to develop a test process execution tool which has common features of standards, and variousness in methodologies and domains. ‘Test Process Execution Tool: Test PET’ which is a test process execution tool developed adapting the concept of product line. Our Test PET generates the test process suitable for the development methodology and domain and then executes the produced test process.

An Overload Alleviation Algorithm by Line Switching (선로절환에 의한 과부화 해소 앨고리즘)

  • 박규홍;정재길
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.5
    • /
    • pp.459-467
    • /
    • 1992
  • This paper presents a new algorithm for the countermeasure to alleviate the line overloads due to contingency without shedding loads in a power system. This method for relieving the line overloads by line switching is based on obtaining the kine outage distribution factors-the linear sensitivity factors, which give the amount of change in the power flow of each line due to the removal of a line in a power system. There factors are made up of the elements of sparse bus reactance matrix and brach reactances. In this paper a fast algorithm and program is presented for obtaining only the required bus reactance elements which corresponds to a non-zero elements of bus admittance matrix, and elements of columns which correspond to two terminal buses of the overloaded(monitored) line. The proposed algorithm has been validated in tests on a 6-bus and the 30-bus test system.

  • PDF