• Title/Summary/Keyword: line loads

Search Result 472, Processing Time 0.032 seconds

Numerical prediction of transient hydraulic loads acting on PWR steam generator tubes and supports during blowdown following a feedwater line break

  • Jo, Jong Chull;Jeong, Jae Jun;Yun, Byong Jo;Kim, Jongkap
    • Nuclear Engineering and Technology
    • /
    • v.53 no.1
    • /
    • pp.322-336
    • /
    • 2021
  • This paper presents a numerical prediction of the transient hydraulic loads acting on the tubes and external supports of a pressurized water reactor (PWR) steam generator (SG) during blowdown following a sudden feedwater line break (FWLB). A simplified SG model was used to easily demonstrate the prediction. The blowdown discharge flow was treated as a flashing flow to realistically simulate the transient flow fields inside the SG and the connected broken feedwater pipe. The effects of the SG initial pressure or the broken feedwater pipe length on the intensities or magnitudes of transient hydraulic loads were investigated. Then predictions of the decompression pressure wave-induced impulsive pressure differential loads on SG tubes and the transient blowdown loads on SG external supports were demonstrated and the general aspects of transient responses of such transient hydraulic loads to the FWLB were discussed.

A Study on the Current & Load Unbalance Factor in using Linear & Nonlinear Load (선형 및 비선형 부하 사용시 전류 및 부하불평형률에 대한 연구)

  • Kim, Jong-Gyeum;Kim, Ji-Myeong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.8
    • /
    • pp.1291-1296
    • /
    • 2017
  • Single-phase and three-phase load can be used together in 3-phase 4-wire system. Single-phase and three-phase loads can be classified as linear loads without harmonics and nonlinear with harmonics. Single-phase linear loads are linear loads such as lamps and heat, and single-phase nonlinear loads are power converters such as rectifiers. It is recommended that the distribution of loads in the 3-phase, 4-wire distribution lines be evenly distributed within a certain range. However, harmonic currents generated in a nonlinear load flow on the neutral line and affect the phase current magnitude. The difference in the magnitude of the individual phase current due to the influence of the harmonic current present in the neutral line can produce a difference in current and load unbalance. In this study, current unbalance ratio and load unbalance ratio which can occur when a combination of linear and nonlinear loads are applied to 3-phase 4-wire distribution line are calculated.

A Cost-Effective, Single-Phase Line-Interactive UPS System that Eliminates Inrush Current Phenomenon for Transformer-Coupled Loads

  • Bukhari, Syed Sabir Hussain;Atiq, Shahid;Lipo, Thomas A.;Kwon, Byung-il
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.675-682
    • /
    • 2016
  • Sudden voltage drops and outages frequently disturb the operation of sensitive loads for domestic, commercial, and industrial use. In some cases, these events may even impair the functioning of relevant equipment. To maintain power under such conditions, a UPS system is usually installed. Once a disturbance happens at the grid side, the line-interactive UPS system takes over the load to prevent an interruption. But, due to magnetic saturation of the transformer, a significant inrush current may occur for the transformer-coupled loads during this transition. The generation of such transient currents may in turn decrease the line voltage and activates over-current protecting devices of the system. In this work, a cost-effective, line-interactive UPS system is proposed that eliminates the inrush current phenomenon associated with transformer-coupled loads. The strategy was implemented by connecting a standard current-regulated voltage source inverter (CRVSI) to the secondary winding of the load transformer. During any transient condition at the grid side, the load current is monitored and regulated to achieve either seamless compensation of the load current or complete transferal of load from grid to the inverter. Experimental results were obtained for a prototype under all possible operating conditions so as to validate the performance of the proposed topology.

A STUDY ON THE EFFECTS OF CAVITY FORMS ON FRACTURE OF AMALGAM RESTORATION IN DECIDUOUS MOALRS (유구치 와동형성이 아말감 파절에 미치는 영향에 관한 연구)

  • Ha, Dae-Song;Kim, Chong-Kwan;Lee, Jong-Gap
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.11 no.1
    • /
    • pp.159-167
    • /
    • 1984
  • In this experiments, the fracture loads were measured and analysed by using of Instron universal testing machine (Model 1132). With 80 upper and lower deciduous molars that were free of dental caries. Isthmus of teeth were prepared to 1/3 and 1/4 of intercuspal width, and internal line angles with round and sharp shape, and then amalgam restoration were performed. The results of this study were as follows; 1. Resistance to fracture loads were greater with isthmus of 1/3 intercuspal width than of 1/4 intercuspal width, especially, statistically significant difference on upper and lower second deciduous molars. 2. Resistance to fracture loads were greater with rounded internal line angle than sharp internal line angle. The above results were as follows, the fracture loads had greater resistance on isthmus of 1/3 intercuspal width, and rounded internal line angle, but normal physiological occlusal forces could permit isthmus of 1/4 intercuspal width and rounded internal line angle.

  • PDF

Development of On-Line Type Voltage Sag Compensation Systems by Using a Supercapacitor (수퍼커패시터를 이용한 상시가동형 순시전압강하 보상시스템의 개발)

  • Shon, Jin-Geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.2
    • /
    • pp.101-107
    • /
    • 2009
  • This paper deal with development of on-line type voltage sag compensation system using supercapacitor EDLC to solve the voltage sag problems which are considered to be dominant disturbances affecting the power quality. With the wide use of semiconductor devices in electrical equipment, modem-type loads are becoming increasingly sensitive to the voltage sags and the disturbances prove to be costly to industries. Supercapacitor EDLC is employed to compensate dynamically for the voltage sag of system with sensitive loads. This capacitor has higher energy density than the electrolytic capacitor. Also, this capacitor has a lot of advantage such as no maintenance, longer life cycle and faster charge-discharge time than the battery system. Therefore, in this paper, the energy design scheme of supercapacitor and the configuration technique of on-line type voltage sag compensation systems are newly introduced. According to the results of experimental of prototype 5[kVA] system, it is verified that the developed system has effectiveness of voltage sag compensation by using a supercapacitor EDLC.

Rotational Viscoelastic Dampers for the Mitigation of Wind Loads on Transmission Tower Transferred from Transmission Lines (송전선에 의해 송전철탑에 전달되는 풍하중 저감을 위한 회전형 점탄성감쇠기)

  • Moon, Byoung-Wook;Min, Kyung-Won
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.16 no.4 s.109
    • /
    • pp.420-427
    • /
    • 2006
  • In this study, wind loads transmitted to a transmission tower from transmission lines are mitigated using rotational viscoelastic dampers. First, the wind load characteristics in a transmission tower is investigated considering the effect of the transmission lines through stochastic analysis. The assemblage of the transmission line and insulator are modeled as a double pendulum system connected to the SDOF model of the tower. From the result of the stochastic analysis, the background component of the overturing moment caused by the wind loads acting on the transmission lines are found to have considerable portion in the total overturning moment. Based on this observation result, a strategy Installing rotational viscoelastic damper (VED) between tower arm and transmission line is proposed for the mitigation of the transmission line reactions, which play a role as dynamic loads on a transmission tower. For the purpose of verification, time history analysis is conducted for different wind velocities and VED parameters. The analysis result shows that the rotational VED is effective for the mitigation of the background component rather than the resonance component of the transmission line reactions and achieves the reduction ratio of 50% even for higher wind speed.

A Study on the Analysis of Damping Loads to Prevent Harmonic Resonance (고조파 공진 억제를 위한 완충부하 투입량 분석에 관한 연구)

  • Lim, Chan-Ho;Lee, Kyeong-Seob;Yu, Won-Kun;Lee, Heung-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.262-266
    • /
    • 2010
  • During the restoration process of primary restorative transmission system, the over voltage may happen due to nonlinear interaction between the unloaded transformer and the transmission system. This over voltage is caused by harmonic resonance and can be prevented by damping loads that are connected before restoration process of primary restorative transmission system. But it is very difficult to predict the occurrence possibility of the harmonic resonance previously. This paper analyzes the relationship between the harmonic resonance and the amount of damping loads to prevent the harmonic resonance. This paper calculates the minimum amount of damping loads to prevent harmonic resonance while changing the length of primary restorative transmission line. And this paper confirmed that the amount of damping loads is not proportional to length of transmission line. The result of this paper will be used as important experiment data to predict the occurrence possibility of harmonic resonance previously.

The Distribution of the Normal Traffic Loads on the Steel Plate Girder Bridge (실동하중에 의한 강판형교의 교통하중 분포)

  • Woo, Sang-Ik;Jung, Kyoung-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.2
    • /
    • pp.103-111
    • /
    • 2000
  • The objectives of the study are to know the strain distribution and modal dynamic behaviour of steel bridge girders by actual traffic load. The live load effect depends on many parameters including the span length, gross vehicle weight, axle weight, axle configuration so on. For the estimation of static and dynamic characteristic, strain data caused by moving loads and traffic characteristics of passing vehicle under actual traffic load have measured using Bridge Weigh in Motion. To confirm the reliability of BWIM system, strain data measured using the $120{\Omega}$ strain gauge under the same condition. It is considered that the data acquired from BWIM system have reliability through the analysis and comparison between stress measured by strain data from BWIM and computed by FEM. Additionally according to the measured strain data of up-line and down-line on the highway, the up-line bridge grows more faster than the down-line bridge and girder 4 and 5 carry more load when vehicles pass the inner line and girder 2 and 3 does when vehicles pass the outer line as this case(the bridge composed with 5 girders).

  • PDF

A Study on Effect of Aerodynamic Loads on Mooring Line Responses of a Floating Offshore Wind Turbine (공기 동역학 하중이 부유식 해상 풍력 발전기의 계류선 응답에 미치는 영향에 관한 연구)

  • Kim, Hyungjun;Han, Seungoh;Choung, Joonmo
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.1
    • /
    • pp.43-51
    • /
    • 2015
  • This paper presents effect of aerodynamic loads on mooring line responses of a floating offshore wind turbine. A Matlab code based on blade element momentum (BEM) theory is developed to consider aerodynamic loads acting on NREL 5MW wind turbine. The aerodynamic loads are coupled with time-domain hydrodynamic analyses using one-way interaction scheme of the wave and wind loads. A semi-submersible floating platform which is from Offshore Code Comparison Collaborative Continuation(OC4) DeepCWind platform is used with catenary mooring lines simply composed of studless chain links. Average values of mooring peak tensions obtained from aerodynamic load consideration are significantly increased compared to those from simple wind drag force consideration. Consideration of aerodynamic loads also yield larger tension ranges which can be important factor to reduce fatigue life of the mooring lines.

An Approach to Allocate Real Power Losses of Transmission Lines to Individual Loads (송전선로의 유효전력 손실을 각 부하에 배분하는 방법)

  • Ro, Kyoung-Soo
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.1
    • /
    • pp.13-18
    • /
    • 2000
  • The paper proposes a simple method to calculate the portion of real power losses of transmission lines allocated to individual loads. The method is implemented by defining loss distribution factors, and analyses the loads shares in the transmission line losses. The paper also performs calculation of sensitivities of the line losses with respect to load changes so as to be easily employed in on-line applications. Effectiveness of the algorithm is verified by computer simulations and it is estimated that the results can be used to compute the cost of one ancillary service under deregulated environment in electric power industries.

  • PDF