• Title/Summary/Keyword: line capacity simulation

Search Result 164, Processing Time 0.029 seconds

Capacity Characteristics of the Indoor Propagation Channel for MIMO System at 5 GHz (5GHz 대역 MIMO 시스템에 대한 실내 전파 채널용량 특성)

  • Ryu, Seong-Hyun;Kim, Jung-Ha;Kwon, Se-Woong;Yoon, Young-Joong
    • Proceedings of the Korea Electromagnetic Engineering Society Conference
    • /
    • 2003.11a
    • /
    • pp.43-46
    • /
    • 2003
  • This paper presents capacity characteristics of the indoor LOS(Line-Of-Sight) propagation channel for MIMO system at 5GHz. The distance between antenna elements, their moving path, and number of transmitting and receiving antennas can be determined by wanted eigen-vlaue, and channel capacity of the MIMO communication channel using only reliable simulation without measurements. The simulation uses 3D Ray tracing and patch scattering model to which electromagnetic material constants are applied. As distance between antenna elements increases, distribution of the eigen-value show a tendency to decrease, but channel capacity increases in LOS environment. However, despite of short distance between antenna elements, large value of channel capacity is obtained in positions which have high AS. When the position of receiver antennas are shifted, channel capacity hardly changed, and as number of antenna elements increases, channel capacity also increases regularly.

  • PDF

An Analysis of Hyd-Cylinder Shop Facilities Planning by Simulation (시뮬레이션 기법을 이용한 유압생산부 설비배치 계획의 분석)

  • Chung, K.H.;Chung, S.W.;Park, D.H.;Kim, J.C.;Kwon, K.Y.
    • IE interfaces
    • /
    • v.5 no.2
    • /
    • pp.39-52
    • /
    • 1992
  • This paper presents alternatives for facilities planning and analyses them using simulation approach. For this purpose, hydro-cylinder production line was sampled as a case study. Several facilities planning alternatives are evaluated based on the several factors such as line balancing, equipment utilization, optimum number of equipments, inventory size, flow time, bottleneck machine, and productive capacity. An optimal facilities planning is proposed based on the degree of meeting with the all factors evaluated. The simulation language employed in this study is SIMAN and the data used for simulation are provided by hydro-cylinder shop.

  • PDF

Analysis of Lighting Overvoltage and Induced Voltage of Neutral Line on the 22.9kV Combined Distribution Line (22.9kV 혼합배전선로의 뇌과전압 해석 및 중성선 유기 전압 해석)

  • Hong, Dong-Suk;Lee, Jong-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.510-512
    • /
    • 2000
  • This paper describes the voltage induced at neutral line and the proper location of lightning arrester in combined 22.9 kV class distribution line jointed overhead line and cable each other Modeling is established in ATP Draw to perform simulation. Simulated distribution line at this paper consists of distribution line 4.2km and underground distribution line 2km. Overvoltage and induced voltage are analyzed at several point of combined line. Analysis results was compared to select the best point to install arrester. Such analysis technology will be applied to obtaining capacity and location of arrester in the similar combined distribution line.

  • PDF

Determining the Capacity and Installation Positions of Regenerative Inverters at DC 1500V Electric Railway Substations (직류 1500V 전기철도용 변전소의 회생인버터 용량 및 설치위치 선정 방법)

  • Bae, Chang-Han;Han, Moon-Seub;Kim, Yong-Ki;Kwon, Sam-Young;Park, Hyun-June
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.55 no.9
    • /
    • pp.478-484
    • /
    • 2006
  • The paper presents methods of determining the capacity and installation positions of regenerative inverters installed in DC 1500V electric railway system. We suggested a method that approximates using parameters related to substations where regenerative inverters are installed, railway lines and operating motor cars, and another that calculates using regenerative power obtained from Train performance Simulation (TPS) and Power Flow Simulation (PFS). We carried out TPS and PFS for Seoul Subway Line $5{\sim}8$, calculating regenerative power and determining substations where regenerative inverters would be installed and the optimal capacity and number of inverters to be installed.

Study on Integrated Storage Systems for Automobile Production (자동차 생산을 위한 통합창고 연구)

  • Ok, Chang-Hun;Kim, Duk-Su;Gong, Jung-Su;Seo, Yoon-Ho
    • Journal of the Korea Society for Simulation
    • /
    • v.21 no.2
    • /
    • pp.91-101
    • /
    • 2012
  • Automobile manufacturing consists of body-line, painting-line, and assembly-line. These production lines are disposed in series and go through a flow process, so according to the status of pre & post processing, a suspension happens in a line by a starvation(impossibility of production by insufficient supply) or blocking(impossibility of production by exceed capacity). Therefore, to prevent a loss of production coming from a starvation or blocking, a storage such as WBS or PBS is independently owned and operated. The paper suggests the simulation model of integrated storage which can operate it by integrating each storage performing a role as a buffer of line. Specifically, the paper found the answers about reasonable number of Stacker Crane and AGV(Automatic Guided Vehicle) and suggested a methodology of operation which is available to operate them. Also, it compared an efficiency between a model of current storage and integrated storage through simulation. As a result, it turned out that the model suggested in the paper was more efficient on suspension of painting-line stop than a current storage.

Analysis of Line Regulator Valve and Ratio Control Valve Considering CVT Shift Dynamics (CVT 변속 동역학을 고려한 라인 레귤레이터 및 변속비 제어 밸브의 응답 특성 해석)

  • 정근수;김현수
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.8 no.2
    • /
    • pp.81-91
    • /
    • 2000
  • Dynamic models of line regulator valve(LRV) and ratio control valve (RCV) are obtained for an electronic controlled CVT. LRV and RCV are operated by variable force solenoid(VFS). Considering the CVT shift dynamics, oil pump's efficiency and saturation characteristics of VFS, simulations are performed and compared with test results. Simulation results are in good agreement with the experiments, which shows the validity of the dynamic models of LRV and RCV obtained. In addition, the effects of the orifice size in the exhaust port of RCV are investigated. Simulation results show that as the orifice size decreases, the residual pressure in the primary actuator increases which insures the large torque transmission capacity, meanwhile the duration time for the downshift increases.

  • PDF

A Study on Simulation of Chip Recycling System for the Management of Cutting Chip in 5-Axis FMS Line (5축 FMS라인의 절삭 칩 처리를 위한 칩 회수처리장치 시뮬레이션에 관한 연구)

  • Lee, In-Su;Kim, Hae-Ji;Kim, Deok-Hyun;Kim, Nam-Kyung
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.12 no.6
    • /
    • pp.175-181
    • /
    • 2013
  • The primary element of machining automation is to maximize the utilization of machine tools, which determines the output and lead-time. In particular, 95% of raw materials for wing ribs are cut into chips and 0.6 ton of chips are generated every hour from each machine tool. In order to verify the chip recycling system that controls the chips from the machines in five-axis FMS line, a simulation of the virtual model is constructed using the QUEST simulation program. The optimum speed of the chip conveyor and its operating conditions that directly affect the efficiency of the FMS line are presented including the chip conveyor speed, the maximum capacity of the hopper, and the number of chip compressors.

Power System Simulation in Seoul matropolitain subway Line-6 system (서울 지하철 6호선에 대한 전력계통 시뮬레이션)

  • Lee, Tae-Shik;Moon, Young-Hyun;Sung, Soo-Young;Yoon, Kap-Koo
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.137-139
    • /
    • 1993
  • This paper details methods used to verify the adquacy of a dc traction power supply for design in Seoul matropolitain subway Line-6 system. Examples of the approach are given for a major subway presently under construction. The performance of trains operating at maximum system design capacity is modelled using a train simulation program. Using a dc network analyser program, the maximum train operating timetable, and a model of the ac and dc electrical suppy system, the electrical performance of the entire system can be modelled over a 24-hour period. The results of this analysis are used to determime: train voltage at a level sufficient to ensure train schedules: adequacy of traction transformers, rectifier, and switchgear ratings; sizes of the overhead contact systern conductors, and ac and de feeder cables: and power and energy demands at the utility company's supply points for inital and final timetable operations.

  • PDF

Simulation of Ventilation Capability Effect on The Smoke Spread in Railway Station (제연 팬 용량이 철도역사 연기확산에 미치는 영향 분석)

  • Jang, Yong-Jun;Koo, In-Hyuk;Kim, Hag-Beom;Kim, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.7-13
    • /
    • 2011
  • Simulation study were performed for ventilation capability effect on the smoke spread in the deeply-underground subway station(DUSS). Singeumho station(The line # 5, Depth: 46m) was modeled and were analyzed for smoke-spread speed difference between the originally-designed-ventilation-capacity and the measured-ventilation-capacity. Field test data for actual fan in DUSS was applied as a boundary condition of a simulation. The whole station was covered in this analysis and total of 4 million grids were generated for this simulation. The fire-driven flow was analyzed case by case to compare the smoke-spread effects. In order to enhance the efficiency of calculation, parallel processing by MPI was employed and large eddy simulation method in FDS code was adopted.

  • PDF

The Study on the Efficient HVDC Capacity Considering Extremely Low Probability of 765kV Double Circuit Transmission Lines Trip

  • Moon, Bong-Soo;Ko, Boyung;Choi, Jin-San
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.3
    • /
    • pp.1046-1052
    • /
    • 2017
  • The load on the power grid of South Korea is expected to grow continuously until the late 2020s, and it is necessary to increase the transfer capacity from the Eastern grid to the Seoul-Gyeonggi region by reinforcing the transmission network for the electric power system to remain stable. To this end, the grid reinforcement by two bipole LCC HVDC transmission systems have been considered on account of the public acceptability and high growth of the fault current level, even though an additional 765kV system construction is more economical. Since the probability of the existing 765kV double circuit transmission line trip is extremely low, a dynamic simulation study was carried out to estimate the efficient HVDC capacity able to stabilize the transient stability by utilizing the HVDC overload capability. This paper suggests the application plan to reduce the HVDC construction capacity with ensuring the transient stability during the 765kV line trip.