• Title/Summary/Keyword: limit setting system

Search Result 64, Processing Time 0.023 seconds

The Planning of Micro-climate Control by Complex Types (단지 유형에 따른 도시의 미기후 조절 계획에 관한 연구)

  • Jeong, Juri;Chung, Min Hee
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.49-54
    • /
    • 2017
  • Purpose: Temperature in urban areas increase much more than suburban areas and it is called urban heat island (UHI) phenomenon. There are several solutions to control UHI phenomenon such as green roof system, water space construction, and cool roof system. However, application of green roof system and cool roof system to some of the buildings which compose the city has a critical limit. Therefore, in order to diminish the temperature rising and UHI phenomenon due to climate change of the city, it needs to approach from the viewpoint of site or city, rather than the viewpoint of individual buildings. This study is aims at analyzing UHI phenomenon by characteristics of surface materials and suggesting the solutions to reduce UHI phenomenon by types of complex. Method: Literature reviews were conducted to analyze the cause, mitigating plan, and recent trends of UHI phenomenon. For the simulation analysis, the type of complex was classified 3 representative complex. Based on measured reflectivity, simulation about UHI phenomenon was conducted by setting 4 strategies; albedo of roof, road pavement, green roof system, and vegetating around buildings. Result: As the results of simulating the UHI reduction factor by types of complex, it showed that the effect of temperature reduction on the building roof layer is more effective than adjusting the reflectivity of buildings such as green roof system, planting near the buildings in both the detached house complex, apartment complex, and commercial complex.

A Study on Loading Arm Envelope and Alarm Setting according to Ship Movement

  • Choi, Byoung-Yeol;Jo, Hyo-Jae;Choi, Han-Sik;Choi, Dong-Eon
    • Journal of Advanced Research in Ocean Engineering
    • /
    • v.4 no.3
    • /
    • pp.115-123
    • /
    • 2018
  • This study was carried using the new approach method to design appropriately the Loading Arm length and the alarm setting according to ship movements on Loading and Unloading marine Berth. The quasi-static mooring analysis was performed to estimate 110,000DWT ship's movements based on environmental conditions such as wind, current and wave. The mooring motion of the ship is very important to determine the loading arm scope, and in this case, the operation condition is performed on the ship without considering the damaged condition of the mooring line because the ship movement in case of damage is larger than intact, and all operations are stopped, the loading arm being released due to control system. From the result of mooring analysis, motion displacements, velocities and accelerations were simulated. They were used to simulate the maximum drifting speeds and distances. The maximum drifting speeds were checked to be satisfied within drifting speed limits. The total maximum drifting distances were simulated with alarm steps of the new approach method. Finally, the loading arm envelopes using the total maximum drifting distances were completed. Therefore, it was confirmed that the new approach method for loading arm envelopes and alarm settings was appropriate from the above results. In the future, it will be necessary to perform the further advanced dynamic mooring analysis instead of the quasi-static mooring analysis and to use the precise computer program analysis for various environments and ship movement conditions.

A Study on the Control System of Permanent Magnet Linear Synchronous Motor Applied to the Z-axis Operation Structure (Z축 운전구조를 갖는 선형 영구자석형 동기 전동기 운전제어에 관한 연구)

  • Choi, Chul;Lee, Jin-Ha;Park, Han-Woong;Kim, Chul-Woo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.9 no.2
    • /
    • pp.142-149
    • /
    • 2004
  • PMLSM(Permanent Magnet linear Synchronous Motor) has widely applied to industrial automations, machine tools and semiconductor equipments due to the merit on the reduction of noise, vibration and the superior dynamic characteristics in comparison to the conventional method, which uses mechanical transfer equipments. Especially, in the case of applying to Z-axis operation structure, control system needs the method of an initial angle setting and the improvement of up/down operation characteristics. This paper proposes an initial angle setting algorithm and a variable gain schedule using real speed and moving direction to improve up/down operation characteristics. The effectiveness of proposed algorithms Is demonstrated by comparing to a conventional gain system via 4-point absolute positions profile with each velocity, acceleration and deceleration.

Wideband RF Interference Reduction Module

  • Kang, Sanggee;Hong, Heonjin;Chong, Youngjun
    • International journal of advanced smart convergence
    • /
    • v.11 no.3
    • /
    • pp.28-35
    • /
    • 2022
  • Interference always exists between wireless communication systems used in the same frequency band or adjacent frequency bands. In order to deploy a new wireless communication system such as a 5G system, a new frequency band must be allocated to the system. For this purpose, after analyzing interference between the existing system and the new system, a method of setting a frequency guard band or a minimum separation distance has been used as a passive method to limit the interference effect. This paper presents a wideband RF IRM(Interference Reduction Module) that can actively reduce the influence of interference between wireless communication systems. The wideband RF IRM can reduce the interference effects of 5G signals on satellite signals. The principle and structure of the wideband RF IRM are presented. The wideband RF IRM can suppress approximately 20dB of interference signal in 100MHz bandwidth when only interference signal exists. It also shows that when a 5G interference signal of -45dBm/100MHz and a satellite signal of -55dBm/40MHz exist simultaneously at a center frequency of 3.83GHz, about 15dB of 5G interference signal can be reduced in the frequency range covered by the satellite signal. The experimental results demonstrate that the wideband RF IRM can actively reduce the 5G interference signal on the satellite signal and can be used for the purpose of reducing the interference effect in a similar environment.

The Effective Heating Control Method of the Radiant Floor Heating System (바닥복사 난방공간의 효율적인 난방제어방법)

  • Cho, S.H.;Tae, C.S.
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.8 no.3
    • /
    • pp.317-329
    • /
    • 1996
  • By describing the floor slab of a radiant heating system as a one dimensional transient heat exchanger problem, a dynamic analysis model to incorperate with TRNSYS program was developed and their results were compared with experimental results. Results showed that the both of TPOC(Two Parameter On-off Control) and TPSC(Two Parameter Switching Control) method using room air temperature and floor surface temperature as the control parameters does not maintain room air and floor surface temperature exactly at the setting temperatures. But TPSC method is a better candidate for the temperature regulations of room air and floor surface temperature than TPOC method which can keep on the upper and lower limit temperature according to outside temeperature and wall structure etc. And better thermal circumstance can be given by TPSC method than On-off and TPOC method and the overheating which can be occured at the radiant floor heating system with on-off heating control will be reduced.

  • PDF

Determination of the Resetting Time to the Process Mean Shift by the Loss Function (손실함수를 적용한 공정평균 이동에 대한 조정시기 결정)

  • Lee, Do-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.165-172
    • /
    • 2017
  • Machines are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. Under the process mean shift, production cost, failure cost and quality loss function cost are increasing continuously. Therefore a periodic preventive resetting the process is necessary. We suppose that the wear level is observable. In this case, process mean shift problem has similar characteristics to the maintenance policy model. In the previous studies, process mean shift problem has been studied in several fields such as 'Tool wear limit', 'Canning Process' and 'Quality Loss Function' separately or partially integrated form. This paper proposes an integrated cost model which involves production cost by the material, failure cost by the nonconforming items, quality loss function cost by the deviation between the quality characteristics from the target value and resetting the process cost. We expand this process mean shift problem a little more by dealing the process variance as a function, not a constant value. We suggested a multiplier function model to the process variance according to the analysis result with practical data. We adopted two-side specification to our model. The initial process mean is generally set somewhat above the lower specification. The objective function is total integrated costs per unit wear and independent variables are wear limit and initial setting process mean. The optimum is derived from numerical analysis because the integral form of the objective function is not possible. A numerical example is presented.

Analysis of an Active Superconducting Current Controller (ASCC) Considering the Transient Stability and OCR Operation in Transmission and Distribution Systems

  • Gusheh, Ahmad Ghafari;Soreshjani, Mohsen Hosseinzadeh;Rahat, Omid
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.543-550
    • /
    • 2016
  • The Active Superconducting Current Controller (ASCC) is a new type of Superconducting Fault Current Limiters (SFCL) which can limit the fault current in different modes. It also has the particular abilities of compensating active and reactive powers for electrical networks. In this paper, it is confirmed that the performance of ASCC in different operating modes introduces a limiting impedance in series with the network which can even degrade the transient stability and the operation of the Over-Current Relays (OCR) employed in a power system. In addition, the model of a three-phase ASCC is simulated, and the effect of descriptive modes on the current limiting level is investigated. For the transient stability analysis, a single machine-infinite bus system is tested, and the effect of operation modes is studied based on an equal area criterion obtaining the critical time and the critical angle. Modifying the setting parameters of OCR such as time dial and pick-up current, the protective coordination is also studied in different operating modes.

A Study on the Improvement of Aircraft Contract Maintenance System (항공장비 외주정비체계 개선방안 연구)

  • Suh Sung-chul;Park Seung-hwan
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.96-107
    • /
    • 2004
  • This paper deals with $\ulcorner$Requirement Decision Model for Repair Parts supplied by the Government$\lrcorner$ which is to reduce Aircraft Contract Maintenance Cost. It aims to find solutions to the fundamental problems of the Aircraft Contract Maintenance System. Under the current Aircraft Contract Maintenance System, it is hard to forecast the exact demand of repair parts, so support rate of Repair Parts supplied by the Government is restricted under 50 percent. It is inevitable to purchase Repair Parts from the firm with much higher price than those of Government source. However, absence of fixed demand pattern makes it difficult to improve accuracy of demand forecast. As a solution to these problems, this model prevents a cost increase due to the unit price difference between Repair Parts supplied by the Government and Repair Parts purchased by the Firm. It also reflects demand characteristics of each repair part, and prevents continual stock increase by setting an upper limit on the amount of Repair Parts supplied by the Government. The effectiveness of this model is verified by empirical analysis using the latest raw data. By applying this model to real situation, we expect to reduce about 4 billion won every year.

Problems on the Arbitral Awards Enforcement in the 2016 Korean Arbitration Act (2016년 개정 중재법의 중재판정 집행에 관한 문제점)

  • Yoon, Jin-Ki
    • Journal of Arbitration Studies
    • /
    • v.26 no.4
    • /
    • pp.3-41
    • /
    • 2016
  • This paper reviews the problems on the arbitral awards enforcement in the 2016 Korean Arbitration Act. In order to get easy and rapid enforcement of the arbitral awards, the new arbitration act changed the enforcement procedure from an enforcement judgement procedure to an enforcement decision procedure. However, like the old arbitration act, the new act is still not arbitration friendly. First of all, there are various problems in the new act because it does not approve that an arbitral award can be a schuldtitel (title of enforcement) of which the arbitral award can be enforced. In this paper, several problems of the new act are discussed: effect of arbitral award, approval to res judicata of enforcement decision, different trial process and result for same ground, possibility of abuse of litigation for setting aside arbitral awards and delay of enforcement caused by setting aside, infringement of arbitration customer's right to be informed, and non-internationality of enforcement of interim measures of protection, inter alia. The new arbitration act added a proviso on article 35 (Effect of Arbitral Awards). According to article 35 of the old arbitration act, arbitral awards shall have the same effect on the parties as the final and conclusive judgement of the court. The proviso of article 35 in the new act can be interpret two ways: if arbitral awards have any ground of refusal of recognition or enforcement according to article 38, the arbitral awards do not have the same effect on the parties as the final and conclusive judgement of the court; if arbitral awards have not recognised or been enforced according to article 38, the arbitral awards do not have the same effect on the parties as the final and conclusive judgement of the court. In the case of the former, the parties cannot file action for setting aside arbitral awards in article 36 to the court, and this is one of the important problems of the new act. In the new act, same ground of setting aside arbitral awards can be tried in different trial process with or without plead according to article 35 and 37. Therefore, progress of enforcement decision of arbitral awards can be blocked by the action of setting aside arbitral awards. If so, parties have to spend their time and money to go on unexpected litigation. In order to simplify enforcement procedure of arbitral awards, the new act changed enforcement judgement procedure to enforcement decision procedure. However, there is still room for the court to hear a case in the same way of enforcement judgement procedure. Although the new act simplifies enforcement procedure by changing enforcement judgement procedure to enforcement decision procedure, there still remains action of setting aside arbitral awards, so that enforcement of arbitral awards still can be delayed by it. Moreover, another problem exists in that the parties could have to wait until a seventh trial (maximum) for a final decision. This result in not good for the arbitration system itself in the respect of confidence as well as cost. If the arbitration institution promotes to use arbitration by emphasizing single-trial system of arbitration without enough improvement of enforcement procedure in the arbitration system, it would infringe the arbitration customer's right to be informed, and further raise a problem of legal responsibility of arbitration institution. With reference to enforcement procedure of interim measures of protection, the new act did not provide preliminary orders, and moreover limit the court not to recognize interim measures of protection done in a foreign country. These have a bad effect on the internationalization of the Korean arbitration system.

Reproducibility of Reaeration in Sewer using Batch Reactor Test (실험반응조를 이용한 하수관에서의 재포기현상 재현 가능성에 관한 연구)

  • Hwang, Hwankook;Min, Sangyun;Cho, Jinkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.8
    • /
    • pp.45-50
    • /
    • 2014
  • The microorganism decomposition experiment of sewage in the underground sewer has the limit of experiment condition and time. The way to reproduce the microorganism decomposition in the underground sewer was studied using batch reactor setting up the DO as a limiting condition. The DO concentration in the sewer is controlled by reaeration. It is possible to obtain correlation between flow condition and reaeration coefficient through the reproduction of reaeration phenomenon by controlling the flow condition in the sewer using this phenomenon. And it is possible to set the flow condition and agitation intensity (velocity gradient) that has the same reaeration coefficient using the correlation between the reaeration coefficient with the flow condition and reaeration coefficient with the agitation intensity. The circumstances in the sewer system was reproduced using batch reactor setting up the DO as a limiting condition from these results.