• Title/Summary/Keyword: life-cycle cost(LCC)

Search Result 319, Processing Time 0.027 seconds

A risk-based framework for design of concrete structures against earthquake

  • Hassani, Mohammadhassan;Behnam, Behrouz;Maknoon, Reza
    • Computers and Concrete
    • /
    • v.25 no.2
    • /
    • pp.167-179
    • /
    • 2020
  • Optimal design of structures against earthquake loads is often limited to reduce initial construction costs, while the cost induced to structures during their useful life may be several times greater than the initial costs. Therefore, it is necessary to consider the indirect costs due to earthquakes in the design process. In this research, an integrated methodology for calculating life cycle cost (LCC) of moment-resisting concrete frames is presented. Increasing seismic safety of structures and reducing human casualties can play an important role in determining the optimal design. Costs incurred for structures are added to the costs of construction, including the costs of reconstruction, financial losses due to the time spent on reconstruction, interruption in building functionality, the value of people's life or disability, and content loss are a major part of the future costs. In this research, fifty years of useful life of structures from the beginning of the construction is considered as the life cycle. These costs should be considered as factors of calculating indirect costs of a structure. The results of this work represent the life cycle cost of a 4 story, 7 story, and 10 story moment-resisting concrete frame by details. This methodology is developed based on the economic conditions of Iran in 2016 and for the case of Tehran city.

Economic Feasibility of Various HVAC Systems for Commercial Building and Comparison of Energy Tariffs between Korea and USA (업무시설용 건물 적용 복합 지열원 공조시스템의 경제성 평가 및 한미 요금 비교)

  • Koh, Jae-Yoon;Park, Yool;Seo, Dong-Hyun
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.9
    • /
    • pp.599-607
    • /
    • 2008
  • In this study, air conditioning systems include ground source heat pump (GSHP), are evaluated for economic feasibility. The building is modeled an air conditioned for 280kW scale. This analysis is compared with the energy tariff programs of Korea and USA. The objectives of this paper are to evaluate the cost-effectiveness of the GSHP and combined system using Life-Cycle Cost (LCC) analysis, and to carry out the sensitivity analysis of key parameters. The paper considered the cases including the base case of air source heat pump and the other two alternates for comparisons. The combined system is not only a cost-effective way to the low energy consumption but also a way to avoid a high initial investment. The variations of initial investment and energy rates give a significant effect on the total LCC and payback period.

Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level (Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정)

  • Kwon, Se-Gon;Park, Mi-Yun;Do, Jeong-Yun;Kim, Do-Kie
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

Development of LCC-LCA Integrated Analysis Model for Efficiency (경제성 평가를 위한 LCC-LCA 종합분석 모델 개발 및 사례적용)

  • Ahn, Hye-Ryeon;Lim, Jin Ho;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.585-593
    • /
    • 2013
  • For a successful construction project, systematic and objective decision-making is a prerequisite from the planning and designing stages. However, previous LCC analysis methods have focused only on simple cost savings and the accompanying economic efficacy while missing the environmental aspects of a structure. Although recently, a new approach of integrated $CO_2$ analysis has been introduced, which is more advanced than the existing simple LCC methods, it is difficult to collect all of the data necessary for each evaluation item since the product-specific cost is not presented under the LCC. In this research, cost evaluation items were selected by relatively high weights and items with heavy influence over a decision-making process in order to suggest an LCC-LCA integrated analysis model that is useful in comprehensively assessing the economic cost and environmental cost throughout the whole life cycle of a structure. The developed LCC-LCA integrated analysis model was applied to actual practices and compared with previous methods to test the model's effectiveness.

The Methodology of Design to LCC (수명주기비용을 고려한 설계 및 관리 방안)

  • Na, In-Sung;Lee, Jae-Won;Park, Myeong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.131-137
    • /
    • 2006
  • The Cost has been much emphasized in inside of an army because of the promotion of reconciliation atmosphere between South and North Korea and the reduction of defense budget since 1990. So we are now faced with the problem that we should consider a cost above all besides the performance and arrangement for such a restriction of budget in time of developing new generation weapon systems. In this research we are suggested following two methodologies. One is the develop a weapon system with optimum cost considering a Life Cycle Cost from the first stage of design and the other is the cost control and management with the establishment of Target cost.

Practices in VE/LCC based Design of Harbor Structures (VE/LCC기법의 항만구조물 설계적용 사례분석연구)

  • Yoon, Gil-Lim;Kang, Oh-Ram;Kim, Dong-Hyawn
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.4
    • /
    • pp.390-400
    • /
    • 2008
  • Reports on VE/LCC based coastal structural design were analyzed to derive possible improvement. VE/LCC technique may be effectively applied to making decisions in coastal structural design. However, it has not been well utilized in recent projects for some problems. Therefore, recent project reports on VE/LCC have been analyzed and merits and demerits were classified. Then, the reason why VE/LCC cannot be effectively applied to real projects was drived. Finally, some pre-requisites to improve the technique were summarized.

The Economic Comparision through LCC Analysis on each Graded Alternatives for Green Remodeling of Public Building (공공건축물의 그린리모델링 수준별 LCC (Life Cycle Cost) 분석을 통한 경제성 비교)

  • Kim, Jaemoon;Lee, Junghyuk;Lee, Duhwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.38-49
    • /
    • 2018
  • Since the ratification of the Paris Agreement (COP21), the government is continuously strengthening policies for the reduction of greenhouse gas of the construction industry in accordance with the growing importance of reducing greenhouse gas and obligation of the government. Especially, the government emphasizes the need to improve the energy performance of old public buildings. Since 2014, the government is running a pilot project in which the government supports the construction cost of the green remodeling project of old public buildings and it is intended to develop the best practice of green remodeling and activate the green remodeling in the private sector. In this study, we analyzed the economical efficiency of the old public buildings by each level through green remodeling and conducted building related investigation and equipment measurement to plan the alternatives of the corresponding buildings. The improvement plan is a green remodeling plan that integrates alternatives. Five improvement plans were developed for each level to analyze the economic feasibility of each plan. As for the analysis method, the first energy demand amount calculation and the LCC analysis were performed through ECO2. In the LCC aspect, the improved 3/4 plan (middle level plan) was the most excellent and results were obtained in the order of the highest cost plan followed by the lowest cost plan. As a result, it is expected that it can be utilized as a basic data for future green remodeling performance plan and economic feasibility analysis in the future.

A study on the improvement in decision making analysis for the selection of tunnel construction method (터널건설공법 선정을 위한 의사결정기법의 개선방안 연구)

  • Park, Jun-Kyung;Jun, Sung-Kwon;Kim, Young-Keun;Heo, Eun-Nyeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.261-276
    • /
    • 2002
  • Recently, for the purpose of choosing reasonable and economical construction, the decision making analyses, such as VE (Value Engineering) and LCC (Life Cycle Cost), are generally performed. But, these methods have some limitations for the application to subway tunnel construction method. So, the AHP (Analytical Hierarchy Process) analysis is applied to determine relative importance for obtaining objectivity in quantitative analysis. And, the LCSC (Life Cycle Social Cost) method is developed to account for the social loss and risk by tunnel construction. From the case of the subway ${\bigcirc}{\bigcirc}$ lot, those methods are very useful to decision making analysis. And, in that case, both quantitative and quantitative analysis appraisement, the drilling and blasting method is evaluated useful alternative proposal in comparing with the cut and cover method.

  • PDF

Life Cycle Cost Evaluation Index Enhancing of Public Facilities (공공시설물의 LCC 평가기준 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.412-415
    • /
    • 2007
  • Recently advanced nations utilize evaluation system about LCC, and KOREA begin to introduce the system to reduce construction expense. And Introducing "Technical proposal type bid" that is new government construction order mode made needs for valuation of price to evaluate facilities LCC. These days LCC is evaluated by BTL and turnkey project in KOREA, but it is suffering from difficulty in evaluation. because evaluation element and standard are indefinite. In addition LCC evaluation of public construction business except BTL and turnkey is not consisting. Therefore, in this research we present LCC evaluation Index for systematic and objective evaluation.

  • PDF

Application of Generally Annual Maintenance Concept for LCC Analysis with a Highway (고속도로 LCC분석시 연간일상유지관리 개념의 적용)

  • Heo, In;Lee, Yong-Gu;Yang, Jae-Gyeong;Choe, Yeong-Min;Kim, Seung-Hyeon
    • Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.43-54
    • /
    • 2011
  • LCC(Life Cycle Cost) analysis on design process has to be performed for a selection of reasonable and economical design alternatives in highway construction projects. To be performed of LCC analysis, the maintenance data such that are maintenance periods, rate of repair, maintenance cost, and so on are required. Therefore the Hi-Portal System had been developed and the maintenance data has been accumulating in the Korean Expressway Corporation. However, the data are not effectively used because the system have no consideration for LCC concept, and currently, th data are acquired by survey with experts. In the study, it is proposed that the concept of Generally Annual Maintenance are practically and easily used to perform LCC analysis. Some of generally annual maintenance data are suggested through Hi-portal data analysis due to the proposed concept and LCC analysis of a real highway construction project is preformed by comparison with a current approach. From the results, it make sure that the proposed concept are effectively used to preform LCC analysis until during exactly practical data from Hi-Portal system are obtained.