• 제목/요약/키워드: life-cycle cost(LCC)

검색결과 317건 처리시간 0.025초

BIM기반 건축물 수선교체비 산정 자동화방안 제시 (Suggestion of an Automatic BIM-based Repair & Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2016
  • In order to assess the design value of engineering work from the point of view of LCC (Life Cycle Cost) in Korea, it is mandatory for all construction works that the total construction costs are over 10 billion won. The LCC includes initial construction costs, maintenance & operation costs, energy costs, end-of-life costs, and so on. Among these, the portion for maintenance & operation costs for a building is sizeable, as compared to the initial construction costs. Furthermore, the paradigm for construction industry has rapidly shifted from 2D to BIM, which includes design planning and data management. However, the study of BIM-based LCC analysis is not adequate today, even though all domestic construction projects ordered by the Public Procurement Service have to adopt BIM. Therefore, this study suggests a methodology of BIM-based LCC analysis that is particularly focused on repair and replacement (R&R) cost. For this purpose, we defined requirements of calculating R&R cost and extracted X from the relevant IFC data. Thereafter, we input them to the ontology of calculating the initial construction costs to obtain an objective output. Finally, in order to automatically calculate R&R cost, mapping with R&R criteria was performed. We expect that our methodology will contribute to more efficiently calculate R&R cost and, furthermore, that this methodology will be applicable to all range of total LCC. Thus, the proposed process of automatic BIM-based LCC analysis will contribute to making LCC analysis more fast and accurate than it is at present.

  • PDF

LCC 분석을 통한 공기조화 열원설비의 최적 관리방안 (Optimum Management Plan of the HVAC Equipments with LCC Analysis)

  • 김용기;우남섭;강성주;이태원
    • 설비공학논문집
    • /
    • 제20권8호
    • /
    • pp.556-562
    • /
    • 2008
  • The building HVAC systems have very different qualities of performance and durability with the superintendent's ability for management and maintenance. The poor management of these systems finally lead to the shortening of the life expectancy and result in the increase of operating costs and energy consumptions due to low efficiencies. This study presents an example of appropriate use of the LCC(Life Cycle Cost) analysis in a process of maintaining and repairing old HVAC equipments, by demonstrating the difference of optimal economic life, decrease of running cost, and energy consumption according to the management level of the HVAC equipments. But there are no reliable life expectancy and performance history data at present for optimal management of various building service equipments. Therefore, it is necessary to construct long-term database on operation results of them for more accurate and optimized LCC analysis.

LCC분석을 통한 도시철도 전동차의 경제적 사용내구년한 추정(서울메트로 사례를 중심으로) (Estimation of the Life-span for Urban Rolling Stock through LCC Analysis (Focused on Seoul Metro))

  • 정수영;이원영
    • 한국철도학회논문집
    • /
    • 제15권5호
    • /
    • pp.508-516
    • /
    • 2012
  • 전동차의 사용내구년한은 도시철도법에 의해 25년으로 되어있다. 그 사용제한에 의해 전동차 성능이 양호해도 사용연장을 위해서는 정밀안전진단을 받아야 한다. 사용내구연한의 연장은 내구년한 만료일의 다음 날부터 15년의 범위에서 정밀진단자가 인정하는 기간까지로 규정되어있다. 서울메트로 전동차의 일부가 25년간의 법정 사용내구년한을 채우고 1996년과 2008년에 신형전동차로 교체되었다. 교체된VVVF제어 신형전동차는 구형전동차에 비해서 안전성 유지보수성 내구성이 향상되어 그 성능에 알맞은 내구년한 설정이 필요하다. 본 논문에서는 LCC분석을 통하여 적정한 전동차의 경제적내구년한을 산출하였다. 25년부터 유지보수비용가중치 10%를 고려할 때에는 41년, 고려하지 않을 때에는 46년의 결과가 얻어졌다.

'H'대학교 훈련용 항공기의 경제적 수명주기에 관한 연구 (A Study on the Economic Life Cycle of Training Airplane in 'H' University)

  • 장조원;최세종;은희봉
    • 한국항공운항학회지
    • /
    • 제10권1호
    • /
    • pp.57-68
    • /
    • 2002
  • The economical aspects should be evaluated to decide the LCC(Life Cycle Cost) of the long life facilities or equipments. Airplane operators evaluate the economical aspects to decide whether they maintain the existing airplane or substitute the new one. This paper presents economic life cycle and economic life cost for both Cessna 172R and Mooney 20J that are operated for flight training in 'H' University. The residual value that is used to calculate the capital recovery rate of the airplane is calculated based on the data from Blue Book published in USA. The annual equivalent on operation cost is calculated based on the 500 flight hours per year which is the annual flight hour for the airplane in 'H' university. This paper showed that economic life cycle of Cessna 172R is nine years since it was introduced in 2001, and Mooney 20J which was introduced in 1991 exceeds the economic life cycle in 2002.

  • PDF

바닥판과 주형의 유지보수 이력을 고려한 LCC 최적설계 (Life Cycle Cost Optimization Considering Maintenance History of Bridge Beck and Girders)

  • 안예준;이현섭;신영석;박장호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.719-726
    • /
    • 2005
  • The optimal design was performed for the bridge superstructure composed of steel box girders and concrete deck considering life cycle cost. The service life of the superstructure was estimated, after load carry capacity curves for steel girder and concrete deck were derived on the basis of condition grade curves and maintenance histories. The object function was determined as life cycle cost, including initial cost, total maintenance cost, disposal cost and user cost, for a period of the estimated service life. The optimal design of the superstructure was performed for the various service lifes. The annual costs were used to compare calculated results and to get the most economical design. Also this paper presents reasonable idea for the use of user cost with uncertainty.

  • PDF

STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF

초기계획단계에서 열원시스템 선정을 위한 경제성 간이 평가법에 관한 연구 (A Study on the Simplified Economics Evaluation Method for Selecting a Heat Source System at the Pre-design Phase)

  • 박률;박종일
    • 설비공학논문집
    • /
    • 제16권11호
    • /
    • pp.1060-1067
    • /
    • 2004
  • To apply an analysis method of life cycle cost when assessing economics of equipment system, we should basically set up preconditions such as useful life, price escalation rate, interest rate, etc. as well as consider a calculation algorism of source energy and heat source system, which is a complex process for life cycle costing. For this reason, equipment designers tend to plan heat source systems, without a thorough investigation on economics of alternative systems at the pre-design phase. In this process, architectural designers should adopt a proper heat source system, which is one of the most important factors for planning an appropriate architectural design, through a discussion with equipment designers in a short time. In order to offer an evaluation method for equipment designers to analyze economics of an alternative heat source system easily at the pre-design phase, this research would define the simplified economics, evaluation method through analysis of existing papers for economics evaluation, and examine validity through comparison of simplified method values ($LCC_{EC}$) and life cycle costing values ($LCC_{15}$) for six alternative heat source systems.

이중 축열조를 갖는 축열식 지열원 히트펌프시스템의 노인공동주택 적용 분석연구 (Application analysis to a shared apartment house of heat storage type GSHP system with dual storage tank)

  • 박종우;이상훈;조성환
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.27-32
    • /
    • 2008
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) which are installed at the same building in the shared an apartment house. Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,050,910,000won) is more profitable than GSHP by 68.9% initial cost. And SPP appeared 3.0 year overcome the different initial cost by different annual energy cost.

  • PDF