• 제목/요약/키워드: life cycle cost breakdown structure

검색결과 23건 처리시간 0.025초

고속철도차량(KTX-1) 추진제어장치의 유지보수정보를 이용한 수명주기비용 예측 (The Life Cycle Cost Estimation using the Maintenance Information of a Propulsion Control System in the High Speed Train(KTX-1))

  • 김재문;윤차중;김양수;장진영;이종성
    • 전기학회논문지
    • /
    • 제60권11호
    • /
    • pp.2176-2181
    • /
    • 2011
  • This paper estimates the life cycle cost(LCC) of a propulsion control system using the maintenance information in the high speed train(KTX-1). Life cycle costing is one of the most effective approaches for the cost analysis of long-life systems such as the KTX-1. Until now, most life cycle cost of the system has been studied as a whole system viewpoint. But in case of railway industry, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. This paper proposes the life cycle cost model which fitted to estimate life cycle cost (LCC) using maintenance information manual. As a result, LCC on propulsion control system increased moderately expect for periodical time when major parts are replaced at the same time. Results will be reflected in the development of domestic products.

한국형 고속전철 시스템의 비용분석 (Life Cycle Cost Analysis for Korea High-Speed Rail Project)

  • 이태형;목진용;박춘수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.376-381
    • /
    • 2002
  • In this study, we have analyzed the cost of korea high-speed rail project. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research St development activity in planning phase is relatively correct.

  • PDF

시공단계와 유지관리단계 비용분류체계의 경계조건 분석 (Analysis of Boundary Conditions for Cost Breakdown Structure in the Construction and Maintenance phase)

  • 정재혁;신한우;김태희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.21-23
    • /
    • 2012
  • The process of building project for planning, designing, construction, maintenance, and waste disposal are related with each other. However, we have a difficulty for estimating building's LCC due not to be flexible each other. Therefore, we analyzed the boundary condition between the process of construction and maintenance, and analyzed the factor of segment. We also suggested the Link System for flexible relation.

  • PDF

경량전철 교량의 생애주기비용 분석에 관한 연구 (A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges)

  • 이두헌;김균태;안동근;전진택;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.384-389
    • /
    • 2006
  • 최근 경량전철 건설사업에 대한 수요가 증가하고 있으며, 경량전철 건설 사업은 주로 민자사업의 형태로 추진되고 있다. 따라서 사업에 투자할 비용을 계약기간 동안 해당 시설물 운영을 통해 수익창출을 해야 하는 민간건설업체 입장에서는 생애주기측면에서 보다 정확한 비용의 산정이 요구되고 있다. 특히, 경량전철 건설사업에 있어서 비용측면에서 많은 부분을 차지하고 있는 교량은 기존의 생애주기비용 산출방식보다 정밀한 비용 산출이 필요하였다. 이에 본 연구에서는 문헌고찰을 통해 LCC 분석 모델을 개발하고, 비용분류체계를 제시하였다. 제시된 비용분류체계를 바탕으로 경량전철 교량 상부구조 형식별 공사비와 보수 ${\cdot}$ 보강 ${\cdot}$ 교체 이력자료를 바탕으로 비용발생주기 및 비용단가 등을 수집 ${\cdot}$ 분석하였다. 또한, LCC분석을 위한 기본적인 가정사항을 설정한 후, 각 항목별 실적자료 정보를 활용하여 LCC 측면에서의 경제성 평가를 실시하였다. 그간 경량전철을 비롯한 철도교량에 대한 LCC분석연구가 많이 이루어지고 있지 않은 상황임을 감안할 때, 본 연구를 통해 제시된 비용분류체계와 유지관리 관련 데이터는 철도교량의 체계적인 유지관리 활동에 대한 기반이 될 것으로 기대된다.

  • PDF

하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축 (Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities)

  • 최성훈;김진철;권순욱
    • 한국콘텐츠학회논문지
    • /
    • 제21권8호
    • /
    • pp.356-366
    • /
    • 2021
  • 국가 경제를 이끌고 있는 하이테크 산업은 일반 건축물에 비해 투자비 규모가 크고 공사 기간이 짧으며 지속적인 투자가 필요한 특성으로 인하여 정확한 공사비 예측과 빠른 의사결정은 효율적인 비용 및 공정 관리를 위한 중요한 요소이다. 국외의 경우, 1980년부터 건설정보 분류체계 표준화를 시행하고 지속적인 발전을 이루어, 체계적으로 프로젝트 전 생애 주기 정보를 수집·활용하는 등 건설 생산성을 향상시키고 있다. 반면, 국내의 건설 현장에서는 건설정보 분류체계의 표준화를 위한 시도들이 있었으나, 표준화 주체의 부재, 건설사별 비용 및 공정관리 방식의 차이로 인한 지속적인 표준화 및 체계화가 이루어지는 데 어려움을 겪고 있다. 특히 하이테크 산업의 경우, 큰 규모, 수많은 공종, 복잡한 공사, 보안 등의 문제로 인하여 하이테크 공장 건설을 위한 건설정보 분류체계 표준화·체계화 수준이 매우 낮다. 따라서 본 연구의 목적은 국내 건설된 관련 프로젝트 데이터를 수집·분류·분석을 통하여 하이테크 공장 건설에 적합한 건설정보 분류체계를 구성하는 데 있다. 본 연구를 통해 분류·분석된 WBS(Work Breakdown Structure)·CBS(Cost Breakdown Structure)를 기반으로 계층적 구분을 통한 코드체계를 제안하였고, WBS와 CBS를 연계를 통한 건축물의 비용 모델을 입체화 및 활용 방법을 제시하였다. 이를 통하여, 일반적인 건설정보 구분 체계인 일 방향의 트리구조를 벗어나 상호 관계성을 기반으로 한 정보 분류체계가 가능하여, 공사 기간 단축 및 비용 절감 등 효과를 극대할 수 있을 것이다.

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제25권12호
    • /
    • pp.1-15
    • /
    • 2020
  • 본 논문에서는 토목 분야 설계와 시공 단계에서의 기존의 2D 프로세스들을 향후 BIM 방식의 프로세스들로 전환하기 위한 새로운 방법을 제안한다. 먼저, 생애주기 관점의 토공 및 도로 구조물의 BIM 설계와 시공 단계에서의 수량-공정(4D)-공사비(5D) 연계 활용의 전체 프로세스에 대하여 기존 2D 방식의 성과품과 3D BIM 방식의 성과품들의 실적용 과정을 비교 분석한다. 제안하는 방법은 IFC 국제 공통 표준 파일 정보와 CBS/OBS/WBS 표준 분류 체계 정보를 연계하여 설계 단계의 성과품을 만들고 수량-공정(4D)-공사비(5D) 연계 활용 모듈을 활용하여 시공 단계의 성과품을 만든다. 궁극적으로는 제안하는 방법을 사용하여 토목 분야 BIM 설계와 시공의 단계별 기술들을 상용화하고자 한다.

비교사례 연구를 통한 인프라 유지관리 기술 분류체계 도출 (Identification of Breakdown Structure for Infrastructure Maintenance, Repair, and Rehabilitation Technologies using Comparative Case Study)

  • 김두연;차용운;박원영;박태일
    • 한국산학기술학회논문지
    • /
    • 제21권10호
    • /
    • pp.248-258
    • /
    • 2020
  • 본 연구에서는 해외 선진국의 유지관리 체계를 벤치마킹하여 시설물의 생애주기 차원에서 종합적 자산 관리개념을 고려한 유지관리 기술 분류체계를 제안하였다. 이를 위하여 비교사례 연구 기법을 적용하였으며, 국내·외 유지관리 제도, 정의, 기술 분류체계 등을 비교·분석하였다. 비교사례 분석을 위하여 유지관리 비용 집행 비율이 높은 미국, 영국, 일본을 대상 국가로 선정하였고, 해당 국가들의 유지관리 체계를 분석하였다. 다음으로, 국내 유지관리 관련 법에 내포되어있는 인프라 유지관리 기술의 분류 및 정의에 대하여 분석하였다. 그 결과 해외 선진국들은 유지관리 기술의 효과에 따라 유지보수와 개선을 명확하게 분류하고, 예방적 유지관리 활동 중심의 체계를 구성하고 있었다. 반면, 우리나라의 시설물 유지관리 기술은 그 분류 및 정의가 명확하게 구분되지 않고 아직도 사후 대응적 구조 중심으로 이루어져 있어 개선이 필요한 것으로 나타났다. 비교사례연구 결과를 토대로 제안한 분류체계는 유지관리, 유지보수, 성능개선의 개념을 정립하고, 예방적 유지보수와 대응적 유지보수를 명확하게 구분하였다. 결과적으로 제안된 기술 분류체계는 자산관리관점에서 선제적 유지관리 활동과 합리적인 유지관리 예산 분배를 위한 기초연구로서의 활용도가 높을 것으로 기대된다.

정수장 시설공사의 통합관리를 위한 시설물분류체계 개발 (The Development of Information Breakdown Structure for Integrated Management of Water Filtration Plants)

  • 김창학;강인석;김효진
    • 대한토목학회논문집
    • /
    • 제37권5호
    • /
    • pp.863-869
    • /
    • 2017
  • 본 연구에서는 다양한 정수처리공법과 시설을 분류하여 정수장의 시설물 정보분할코드체계를 구축하였으며, 이것은 정수장 시설의 생애주기 동안 소요되는 유지관리비용, 에너지 사용비용 산정 및 배출된 환경오염원의 규명과 환경영향평가의 정량적 분석 등을 위한 정보를 통합하기 위한 전산시스템의 코드체계로 활용하게 된다. 건설공사의 정보는 많은 이질정보를 포함하고 있기 때문에 이를 통합해서 관리하기 위한 코드체계가 매우 중요하다. 또한 정수장 시설은 많은 프로세스를 포함한 시설물 설치공사가 주를 이루기 때문에 좀 더 세분화된 분활코드가 필요하다. 따라서 본 연구에서는 국내에서 시도되지 않은 정수장 관련 분류체계를 건설공사 분류체계인 파셋 분류체계 표현방식을 활용하여 구축하였다.

M&S를 활용한 RAM-C 기반 최적 정비 개념 설정 방안 연구 (A Study on the Method for Setting the Optimal Maintenance Concept based on RAM-C Using Modeling & Simulation)

  • 김경록;이기원;정준;차종한
    • 한국군사과학기술학회지
    • /
    • 제25권5호
    • /
    • pp.530-538
    • /
    • 2022
  • Recently, the R&D of weapon systems has been strengthened in terms of economic cost management throughout the entire life cycle from performance. This study proposes the method for setting the optimal maintenance concept based on RAM-C in weapon system acquisition stage by calculating the operation & maintenance cost as well as reliability, availability, and maintainability. First, we design a simulation model for analysis of weapon system logistic supportability. In addition, information such as weapon system Part Breakdown Structure, operation & maintenance system, cost, and etc for simulation analysis, is applied. Based on the obtained simulation results, the optimal plan is selected among alternatives designed with various maintenance concepts through normalization and weight setting. It is expected to be of technical help in the application of RAM-C in the weapon system acquisition stage.