• Title/Summary/Keyword: large workspace

Search Result 49, Processing Time 0.024 seconds

High Precision Hybrid Milling Machine Using Dual-Stage (듀얼스테이지를 이용한 고정밀도의 하이브리드 밀링머신)

  • Chung, Byeong-Mook;Yeo, In-Joo;Ko, Tae-Jo;Lee, Cheon
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.25 no.7
    • /
    • pp.39-46
    • /
    • 2008
  • High precision machining technology has become one of the important parts in the development of a precision machine. Such a machine requires high speed on a large workspace as well as high precision positioning. For machining systems having a long stroke with ultra precision, a dual-stage system including a global stage (coarse stage) and a micro stage (fine stage) is designed in this paper. Though linear motors have a long stroke and high precision feed drivers, they have some limitations for submicron positioning. Piezo-actuators with high precision also have severe disadvantage for the travel range, and the stroke is limited to a few microns. In the milling experiments, the positional accuracy has been readily achieved within 0.2 micron over the typical 20 mm stroke, and the path error over 2 micron was reduced within 0.2 micron. Therefore, this technique can be applied to develop high precision positioning and machining in the micro manufacturing and machining system.

Octree-Based Adaptive Tetrahedral Meshing (옥트리 기반의 적응적 사면체 요소망구성)

  • Kim, Chul-Won;Park, Suk-Hoon;Choi, Min-Gyu
    • Journal of the Korea Computer Graphics Society
    • /
    • v.17 no.2
    • /
    • pp.45-53
    • /
    • 2011
  • This paper proposes a volume meshing method that fills the inside of an object with tetrahedra, of which dihedral angles are good. The suggested method is fast, stable and easy to implement It can also utilize an octree structure to space-efficiently fill an object with graded tetrahedra by reducing the total number of tetrahedra. To obtain a high-quality mesh with good dihedral angles, we restrict the octree such that any pair of neighboring cells only differs by one level. To efficiently construct a restricted-octree and generate a volume mesh from the octree, we utilize a signed distance field of an object on its bounded workspace. The suggested method can be employed in FEM-based simulation of large elasto-plastic deformation and tetrahedral-mesh-based simulation of fluid flow.

Computer Desks Design for More Workspace Enlargement - Especially on the Case Study of Their Typical Development - (작업공간 활용증대를 위한 컴퓨터 데스크 디자인 연구 -유형별 개발사례를 중심으로 -)

  • 박규현
    • Archives of design research
    • /
    • v.14 no.3
    • /
    • pp.27-36
    • /
    • 2001
  • Minor enterprises can successfully build up their market share plans in a relatively shorter time than compared with major enterprises, which require long time for design developments in their big organization. Therefore, there are some items that are more suitable to the minor enterprises. For example, computer desk may be the one. It must be one of the strategically suitable items of minor enterprises rather than of large enterprises because of their own easy production policies. This paper is based on a research report that I submitted to Gyongsan-Si, Gyongbuk-Do which supported a small company for a special purpose of its provincial economic policy. I took part in the research and suggested five types of characteristic concepts and the ideas. And as a result. the type war accepted as the most appropriate one of them to produce. And the acception was based on the following five factors; consumer's need, productivity, proper price, energy saving, and user' easiness.

  • PDF

An Efficient QCLS Positioning Method Using Weight Estimation for TDOA Measurements (TDOA 측정치를 이용한 가중치 추정방식의 QCLS 측위 방법)

  • Kim, Dong-Hyouk;Song, Seung-Hun,;Park, Kyoung-Soon;Sung, Tae-Kyung
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.44 no.4 s.316
    • /
    • pp.1-7
    • /
    • 2007
  • When the sensor geometry is poor, the user position estimate obtained by of GN (Gauss-Newton) method is often diverged in radio navigation. In other to avoid divergence problem QCLS (Quadratic Correction Least Square) method using TDOA (Time Difference of Arrival) measurements is introduced, but the estimation error is somewhat large. This paper presents the modified QCLS method using weighted least square. Since the weighting matrix is influenced by the unknown user position, two-step approach is employed in the proposed method. The weighting matrix is estimated in the first step using least square, and then find user position is obtained using weighted least square. Simulation results show that the performance of the proposed method is superior to the conventional QCLS all over the workspace.

A Survey on the Spaces in Police Substation for Improving Area Standards (지역경찰관서 면적기준 개선을 위한 실태조사)

  • Kang, Kyung-Yeon;Han, Gi-Sung;Lee, Kyung-Hoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.2
    • /
    • pp.3-11
    • /
    • 2020
  • The police substation includes work spaces for civil services, interviews, and meetings, etc, and private spaces for rest, showers and cafeterias and so on. Since a large number of rooms for each function should be installed in a relatively small building, it is important to develop an area standard for efficient space organization in consideration of the functional characteristics and usage patterns of each space. The purpose of this study is to suggest the way for improving the area standards for spaces in police substation based on the results of existing standards analysis and case study. For this objective, architectural documents of 161 police substations built after 2013 in Korea were comparatively analyzed. Sixteen of these facilities were selected for field survey and investigated how the workspace and private area were organized and used. The results of investigation showed that there were a number of problematic cases, such as spaces not installed or insufficient, spaces used for two or more functions, spaces installed even though they are not included in the standards. It was mainly due to the fact that several important spaces which had been installed in most police substations were not included in the existing standards. The ways for improvement were suggested like following four points: (1) Modifying the criteria for classifying facility size, (2) Modifying the lists of the required spaces, (3) Specifying the basis of calculation for each space in detail, and (4) Differentiating the way to organize spaces according to the facility size.

Design of Integrated Process-Based Model for Large Assembly Blocks Considering Resource Constraints in Shipbuilding (자원제약을 고려한 조선 대조립 공정의 통합 프로세스 기반 모델 설계)

  • Jeong, Eunsun;Jeong, Dongsu;Seo, Yoonho
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.2
    • /
    • pp.107-117
    • /
    • 2019
  • Because shipbuilding is single-product production with limited resources, production management technology is essential to manage the resources effectively and maximize the productivity of ship-process. Therefore, many shipbuilding companies are conducting research on ship production plan and process considering various constraints in the field by applying modeling and simulation. However, it is difficult to provide accurate production plan on sudden schedule and process changes, and to understand the interconnectivity between the processes that produce blocks in existing research. In addition, there are many differences between the production planning and field planning because detailed processes and quantity of blocks can not be considered. In this research, we propose the integrated process-based modeling method considering process-operation sequences, BOM(Bill of materials) and resource constraints of all the scheduled blocks in the indoor system. Through the integrated process-based model, it is easy for the user to grasp the assembly relationship, workspace and preliminary relationship of assembly process between the blocks in indoor system. Also, it is possible to obtain the overall production plan that maximizes resource efficiency without the separate simulation and resource modeling procedures because resource balancing that considers the amount of resource quantity shared in the indoor system is carried out.

Multi-day Trip Planning System with Collaborative Recommendation (협업적 추천 기반의 여행 계획 시스템)

  • Aprilia, Priska;Oh, Kyeong-Jin;Hong, Myung-Duk;Ga, Myeong-Hyeon;Jo, Geun-Sik
    • Journal of Intelligence and Information Systems
    • /
    • v.22 no.1
    • /
    • pp.159-185
    • /
    • 2016
  • Planning a multi-day trip is a complex, yet time-consuming task. It usually starts with selecting a list of points of interest (POIs) worth visiting and then arranging them into an itinerary, taking into consideration various constraints and preferences. When choosing POIs to visit, one might ask friends to suggest them, search for information on the Web, or seek advice from travel agents; however, those options have their limitations. First, the knowledge of friends is limited to the places they have visited. Second, the tourism information on the internet may be vast, but at the same time, might cause one to invest a lot of time reading and filtering the information. Lastly, travel agents might be biased towards providers of certain travel products when suggesting itineraries. In recent years, many researchers have tried to deal with the huge amount of tourism information available on the internet. They explored the wisdom of the crowd through overwhelming images shared by people on social media sites. Furthermore, trip planning problems are usually formulated as 'Tourist Trip Design Problems', and are solved using various search algorithms with heuristics. Various recommendation systems with various techniques have been set up to cope with the overwhelming tourism information available on the internet. Prediction models of recommendation systems are typically built using a large dataset. However, sometimes such a dataset is not always available. For other models, especially those that require input from people, human computation has emerged as a powerful and inexpensive approach. This study proposes CYTRIP (Crowdsource Your TRIP), a multi-day trip itinerary planning system that draws on the collective intelligence of contributors in recommending POIs. In order to enable the crowd to collaboratively recommend POIs to users, CYTRIP provides a shared workspace. In the shared workspace, the crowd can recommend as many POIs to as many requesters as they can, and they can also vote on the POIs recommended by other people when they find them interesting. In CYTRIP, anyone can make a contribution by recommending POIs to requesters based on requesters' specified preferences. CYTRIP takes input on the recommended POIs to build a multi-day trip itinerary taking into account the user's preferences, the various time constraints, and the locations. The input then becomes a multi-day trip planning problem that is formulated in Planning Domain Definition Language 3 (PDDL3). A sequence of actions formulated in a domain file is used to achieve the goals in the planning problem, which are the recommended POIs to be visited. The multi-day trip planning problem is a highly constrained problem. Sometimes, it is not feasible to visit all the recommended POIs with the limited resources available, such as the time the user can spend. In order to cope with an unachievable goal that can result in no solution for the other goals, CYTRIP selects a set of feasible POIs prior to the planning process. The planning problem is created for the selected POIs and fed into the planner. The solution returned by the planner is then parsed into a multi-day trip itinerary and displayed to the user on a map. The proposed system is implemented as a web-based application built using PHP on a CodeIgniter Web Framework. In order to evaluate the proposed system, an online experiment was conducted. From the online experiment, results show that with the help of the contributors, CYTRIP can plan and generate a multi-day trip itinerary that is tailored to the users' preferences and bound by their constraints, such as location or time constraints. The contributors also find that CYTRIP is a useful tool for collecting POIs from the crowd and planning a multi-day trip.

Development of a Real-time OS Based Control System for Laparoscopic Surgery Robot (복강경 수술로봇을 위한 실시간 운영체제 기반 제어 시스템의 개발)

  • Song, Seung-Joon;Park, Jun-Woo;Shin, Jung-Wook;Kim, Yun-Ho;Lee, Duk-Hee;Jo, Yung-Ho;Choi, Jae-Seoon;Sun, Kyung
    • Journal of Biomedical Engineering Research
    • /
    • v.29 no.1
    • /
    • pp.32-39
    • /
    • 2008
  • This paper reports on a realtime OS based master-slave configuration robot control system for laparoscopic surgery robot which enables telesurgery and overcomes shortcomings with conventional laparoscopic surgery. Surgery robot system requires control system that can process large volume information such as medical image data and video signal from endoscope in real-time manner, as well as precisely control the robot with high reliability. To meet the complex requirements, the use of high-level real-time OS (Operating System) in surgery robot controller is a must, which is as common as in many of modem robot controllers that adopt real-time OS as a base system software on which specific functional modules are implemened for more reliable and stable system. The control system consists of joint controllers, host controllers, and user interface units. The robot features a compact slave robot with 5 DOF (Degree-Of-Freedom) expanding the workspace of each tool and increasing the number of tools operating simultaneously. Each master, slave and Gill (Graphical User Interface) host runs a dedicated RTOS (Real-time OS), RTLinux-Pro (FSMLabs Inc., U.S.A.) on which functional modules such as motion control, communication, video signal integration and etc, are implemented, and all the hosts are in a gigabit Ethernet network for inter-host communication. Each master and slave controller set has a dedicated CAN (Controller Area Network) channel for control and monitoring signal communication with the joint controllers. Total 4 pairs of the master/slave manipulators as current are controlled by one host controller. The system showed satisfactory performance in both position control precision and master-slave motion synchronization in both bench test and animal experiment, and is now under further development for better safety and control fidelity for clinically applicable prototype.

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF