• Title/Summary/Keyword: large construction project

Search Result 600, Processing Time 0.026 seconds

Business Processes Automation and Analysis Techniques by Using BPM and SOA (BPM과 SOA기반의 비즈니스 프로세스 자동화와 분석기법)

  • Lee, Chung-Hun;Lee, Jong-Hak;Seo, Jeong-Man;Cho, Wan-Sup
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.4
    • /
    • pp.171-178
    • /
    • 2009
  • Recently, a combination of Business Process Management (BPM) and Service Oriented Architecture (SOA) is being recommended as the best approach for automating large business systems. And the need to create meaningful information from daily operational data is increased today. In this paper, we propose a methodology for automating business processes based on the BPM-SOA convergence trend and verify the methodology by implementing the project management business process. BPM-SOA convergence provides higher extensibility and productivity due to the loosely coupled system construction and maintenance. The system has good properties for frequent process changes and reuse of duplicate processes. We then analyze extensibility of the system as new business processes are added to the existing system. We finally analyze the data generated by BPM by using SAP business intelligence to support management's decision making and strategy. Business intelligence provides not only useful data for business decisions but also chance to optimize the business processes.

Change Analysis of Eulsukdo Wetland Using Qualitative Multi-temporal Image Data (다중시기 영상자료를 이용한 을숙도 습지 지역의 정성적 변화분석)

  • Lee, Jae-One;Kim, Yong-Suk;We, Gwang-Jae
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.13 no.2
    • /
    • pp.64-73
    • /
    • 2010
  • This research collected some multi-image information of Nakdong River Estuary Eulsukdo area in last 30 years, which are used as the basis information in running the qualitative analysis of the topography relief's deformation. First, to obtain the data, this research carried out a field survey and GCP measurement, then classified and collected the image information by analog and digital image. The acquired images which have passed a high-precise scan process and geometric correction is manufactured by Ortho Mosaic image, then divided them into 9 sections time period classification before we run a qualitative analysis. In late of 1980's there are many changes of environmental topography deformation of the Eulsukdo area which caused by large scale building constructions, appeared to be known through this research. And then in late of 1990's, we organized the wild cultivated lands, started the wetland restoration of the artificial ecology, in 2000's we are able to know the existence of topograph relief change which caused by big scale of bridge construction. Hereafter, in this quick process of the environmental and topographical change of this area caused by the 4 major rivers restoration project, the analysis results of this experiment are expected to be something applicable as important basic data.

Evaluation for Rehabilitation Countermeasures of Coal-mined Spoils and Denuded Lands (폐탄광지(廢炭鑛地)의 산림훼손지복구(山林毁損地復舊) 및 폐석유실방지대책(廢石流失防止對策)에 관한 연구(硏究))

  • Woo, Bo-Myeong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.2
    • /
    • pp.24-34
    • /
    • 2000
  • The project for rehabilitation and revegetation of the abandoned coal-mine lands is a very important national environmental restoration project in the view point of rehabilitation and revegetation of denuded forest-lands caused by coal mining as well as restoration of disturbed natural environment and control of the variable pollutions. In Korea, because a large number of coal mines had been developed in order to fill up abundantly consumption of coal as a major energy source in the developing period, a lot of denuded forest-lands caused by coal mining had distributed in the whole country. And, due to the absence of effective rehabilitation and revegetation works on the denuded forestlands caused by coal-mining, most of them had been remained with being damaged. In 1990, area of the abandoned coal-mine lands, requiring the rehabilitation and revegetation works, was about 1,437.1 ha. For the past ten years ('90~'99), about 1,081.8 ha out of them had been rehabilitated and revegetated, and the rehabilitation planning area was about 33.0 ha in 2000. So, remaining area out of abandoned coal-mine lands will be about 322.3 ha after 2000. In principle, after abandoning coal-mine, mine owners must carry out the rehabilitation and revegetation works on the abandoned mine lands by themselves. But, most of mine owners were in financial difficulty after abandoning coal-mine, so that principle couldn't have obtained the desired effects. To solve this problem, from 1995, Coal Industry Promotion Board (CIPB) have carried out the rehabilitation and revegetation works on the abandoned coal-mine lands at government budgets, and they have obtained good results in the construction area. However, due to application of the "conventional erosion control measures and techniques" to the rehabilitation and revegetation measures on the abandoned coal-mine lands, the results and effects of the works excuted have not been successful. Therefore, unique measures and techniques for rehabilitation and revegetation of the abandoned coal-mine lands will have to be developed, especially including development of new techniques on the soil-dressing and soil-covering, seed spray and hydro-seeding measures with seed-fertilizer-soil materials as the mechanized measures, and using of new materials for the tree planting and seedling measures.

  • PDF

A Study on the Creation Rural Experience Village Reflecting the Travel trends of the Post-Corona - A Case of Wi-bong Village in Jeollabuk-do - (포스트 코로나 시대 관광 트렌드를 반영한 농촌체험마을 조성방안 연구 - 전라북도 완주군 소양면 위봉마을을 사례로 -)

  • An, Phil-Gyun;Eom, Seong-Jun;Cho, Suk-Yeong;Kim, Sang-Bum
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.4
    • /
    • pp.27-39
    • /
    • 2020
  • With the COVID-19 pandemic, the global economy has stagnated and our daily lives have changed. The rural economy is also experiencing damage, such as an average of 65% or more decrease in the number of visitors to rural experience resort villages due to the spread of COVID-19. In order to minimize the damage arising from the prolonged coronavirus, a hospitality system in response to changes in rural tourism behavior and consumer demand is needed to revitalize rural areas and maintain continuous economic independence. Therefore, this study attempted to find ways to utilize landscape resources such as education, culture, history, and ecology in order to complement the existing experience programs in connection with local resources and local environment. Wibong Village, which is the subject of the study, attempted to revitalize the village using the resources through the "Creative village creation" project in 2015. Due to poor management of historical resources, difficulty in operating experience programs, and response to changes in the natural environment, the rate of implementation of the project plan was very low. Currently, the demand for experience is also decreasing due to the COVID-19 effect, so it was judged that it was necessary to develop an experience village program suitable for the needs of experienced visitors by discovering additional local resources for the continuous operation of the experience village. In order to solve the problem of the use of landscape resources and the spatial composition of the study site, additional investigations of local resources were made, and an experience program course that could be operated by theme was proposed by configuring a space suitable for the use of landscape resources. By dividing the additionally investigated landscape resources into history, ecology, and region, an experiential course was created to separate the traffic lines, and the space composition for large-scale experienced visitors that had been previously operated was constructed in a form suitable for the post-corona era. In addition, at least two experiential tour courses that can be operated by period were proposed to maintain economic effects. Starting with this study, if further research on the creation and spatial composition of a rural experience village centered on the connection with the region, it will be used as research results that can be referenced in projects such as village creation, rural space planning, and living area analysis. It is expected that it will be able to effectively cope with the construction of a rural area suitable for the post-corona era, where demand is expected to increase in the future.

Analysis on Priority of Influence Factors for Management of Vertical-extension Remodeling Project (수직증축 리모델링공사의 효율적 관리를 위한 영향요인 분석)

  • Lee, Dong-Heon;Lim, Hyoung-chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.314-321
    • /
    • 2016
  • After the 1980s, as the economy was growing rapidly and the real estate market was active, a large increase in population was supplied to the city. Accordingly, the national apartment housing market is located in the form of Urban Housing Culture. On the other hand, with time, the supply apartment houses became superannuated and the residential environment became poor. Therefore, the environment of old apartment houses has been changed to improve by reconstruction. Despite this, reconstruction incurred not only a lot of construction waste, but also problems of environmental degradation, noise, traffic congestion, increasing number of households, and so on. Recently, the housing law has changed, and vertical extension remodeling focused on Small/Medium Town House is underway. This has been changed in response to the demand. This is one of essential parts in the remodeling field for the future, even though it has some problems in how uses existing buildings. Therefore, this study analyzed occurrence risk factor for each type through research materials and case analysis regarding the vertical extension remodeling of apartment housing. In addition, the relative importance was determined through questionnaires and interviews from constructors, designers, and experts in the field.

A Study on the Installation of Groyne using Critical Movement Velocity and Limiting Tractive Force (이동한계유속과 한계소류력을 활용한 수제 설치에 관한 연구)

  • Kim, Yeong Sik;Park, Shang Ho;An, Ik Tae;Choo, Yeon Moon
    • Journal of Wetlands Research
    • /
    • v.22 no.3
    • /
    • pp.194-199
    • /
    • 2020
  • Unlike in the past, the world is facing water shortages due to climate change and difficulties in simultaneously managing the risks of flooding. The Four Major Rivers project was carried out with the aim of realizing a powerful nation of water by managing water resources and fostering the water industry, and the construction period was relatively short compared to the unprecedented scale. Therefore, the prediction and analysis of how the river environment changes after the Four Major Rivers Project is insufficient. Currently, part of the construction section of the Four Major Rivers Project is caused by repeated erosion and sedimentation due to the effects of sandification caused by large dredging and flood-time reservoirs, and the head erosion of the tributaries occurs. In order to solve these problems, the riverbed maintenance work was installed, but it resulted in erosion of both sides of the river and the development of new approaches and techniques to keep the river bed stable, such as erosion and excessive sedimentation, is required. The water agent plays a role of securing a certain depth of water for the main stream by concentrating the flow so much in the center and preventing levee erosion by controlling the flow direction and flow velocity. In addition, Groyne products provide various ecological environments by forming a natural form of riverbeds by inducing local erosion and deposition in addition to the protection functions of the river bank and embankment. Therefore, after reviewing the method of determining the shape of the Groyne structure currently in use by utilizing the mobile limit flow rate and marginal reflux force, a new Critical Movement Velocity(${\bar{U}}_d$) and a new resistance coefficient formula considering the mathematical factors applicable to the actual domestic stream were developed and the measures applicable to Groyne installation were proposed.

Analysis of Leasing Decision Determinants by the Store Size and Lend-Lease Perspectives for Mix-Used Shopping Mall Development (복합쇼핑몰 개발을 위한 매장규모 및 임대차 관점에 따른 임차인 입점결정요인에 관한 연구)

  • Park, Hyeyoon;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.49-57
    • /
    • 2017
  • This study intends to determine the decision making criteria of leasing in mix-used shopping mall, analyze the variation of their weight by store size inside mall and lend-lease perspective for lessor and lessee towards the identification of optimal leasing environment in mix-used shopping mall development. The decision making have been identified based on the number of prior literature review and expert consultation. And the AHP methodology and Fuzzy theory have been implemented to develop the weight for criteria based on experts survey. Research finding indicates that the 2 categories with 6 criteria and 24 sub-criteria have been determined. It is noteworthy that the large sized group would be located in both ends on main floor with their requested store size; middle sized group done over second floor with low rent by attracting with both competitive brands and key-tenants; small sized group done in both ends on main floor or on 2 to 3 floor connecting to main circulation. This should be examined in the planning stage of SPA lessee solicitation by the lessor in mix-used shopping mall development project.

Studies on the Frost Heave Revelation and Deformation Behaviour due to Thawing of Weathered Granite Soils (화강암 풍화토의 동상 발현 및 융해에 따른 변형 거동에 관한 연구)

  • 류능환;최중대;류영선
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.3_4
    • /
    • pp.61-71
    • /
    • 1995
  • Natural ground is a composite consisted of the three phases of water, air and soil paircies. Among the three components, water as a material is weU understood but soil particles are not in foundation engineering. Especially, weathered granite soil generally shows a large volumetric expansion when they freeze. And, the stability and durability of the soil have shown decreased with repetitive freezing and thawing processes. These unique charcteristics may cause various construction and management problems if the soil is used as a construction material and foundation layers. This project was initiated to investigate the soil's physical and engineering characteristics resulting from freezing and freezing-thawing processes. Research results may be used as a basic data in solving various problems related to the soil's unique characteristics. The following conclusions were obtained: The degree of decomposition of weathered granite soil in Kangwon-do was very different between the West and East sides of the divide of the Dae-Kwan Ryung. Soil particles distributed wide from very coarse to fine particles. Consistency could be predicted with a function of P200 as LL=0.8 P200+20. Permeability ranged from 10-2 to 10-4cm/sec, moisture content from 15 to 20% and maximum dry density from 1.55 to 1.73 g /cmΥ$^3$ By compaction, soil particles easily crushed, D50 of soil particles decreased and specific surface significantly increased. Shear characteristics varied wide depending on the disturbance of soil. Strain characteristics influenced the soil's dynamic behviour. Elastic failure mode was observed if strain was less than 1O-4/s and plastic failure mode was observed if strain was more than 10-2/s. The elastic wave velocity in the soil rapidly increased if dry density became larger than 1.5 g /cm$^3$ and these values were Vp=250, Vg= 150, respectively. Frost heave ratio was the highest around 0 $^{\circ}C$ and the maximum frost heave pressure was observed when deformation ratio was less than 10% which was the stability state of soil freezing. The state had no relation with frost depth. Over freezing process was observed when drainage or suction freezing process was undergone. Drainage freezing process was observed if freezing velocity was high under confined pressure and suction frost process was occurred if the velocity was low under the same confined process.

  • PDF

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Limitations of National Responsibility and its Application on Marine Environmental Pollution beyond Borders -Focused on the Effects of China's Three Gorges Dam on the Marine Environment in the East China Sea- (국경을 넘는 해양환경오염에 대한 국가책임과 적용의 한계 -중국의 산샤댐 건설로 인한 동중국해 해양환경 영향을 중심으로-)

  • Yang, Hee Cheol
    • Ocean and Polar Research
    • /
    • v.37 no.4
    • /
    • pp.341-356
    • /
    • 2015
  • A nation has a sovereign right to develop and use its natural resources according to its policies with regard to development and the relevant environment. A nation also has an obligation not to harm other countries or damage environments of neighboring countries as consequences of such actions of developments or use of natural resources. However, international precedents induce a nation to take additional actions not to cause more damages from the specific acts causing environmental damages beyond national borders, when such acts have economic and social importance. That is to say that there is a tendency to resolve such issues in a way to promote the balance between the mutual interests by allowing such actions to continue. A solution to China's Three Gorges Dam dilemma based on a soft law approach is more credible than relying on a good faith approach of national responsibilities and international legal proceedings since the construction and operation of the dam falls within the category of exercising national sovereign rights. If a large scale construction project such as the Three Gorges Dam or operation of a nuclear power plant causes or may cause environmental damage beyond the border of a nation engaged in such an undertaking, countries affected by this undertaking should jointly monitor the environmental effects in a spirit of cooperation rather than trying to stop the construction and should seek cooperative solutions of mutual understanding to establish measures to prevent further damages. If China's Three Gorges Dam construction and operation cause or contain the possibility of causing serious damages to marine environment, China cannot set aside its national responsibility to meet international obligations if China is aware of or knows about the damage that has occurred or may occur but fail to prevent, minimize, reverse or eliminate additional chances of such damages, or fails to put in place measures in order to prevent the recurrence of such damages. However, Korea must be able to prove a causal relationship between the relevant actions and resulting damages if it is to raise objections to the construction or request certain damage-prevention actions against crucial adverse effects on the marine environment out of respect for China's right to develop resources and acts of use thereof. Therefore, it is essential to cumulate continuous monitoring and evaluations information pertaining to marine environmental changes and impacts or responses of affected waters as well as acquisition of scientific baseline data with observed changes in such baseline. As China has adopted a somewhat nonchalant attitude toward taking adequate actions to protect against marine pollution risks or adverse effects caused by the construction and operation of China's Three Gorges Dam, there is a need to persuade China to adopt a more active stance and become involved in the monitoring and co-investigation of the Yellow Sea in order to protect the marine environment. Moreover, there is a need to build a regular environmental monitoring system that includes the evaluation of environmental effects beyond borders. The Espoo Convention can serve as a mechanism to ease potential conflicts of national interest in the Northeast Asian waters where political and historical sensitivities are acute. Especially, the recent diplomatic policy advanced by Korea and China can be implemented as an important example of gentle cooperation as the policy tool of choice is based on regional cooperation or cooperation between different regions.