• Title/Summary/Keyword: large construction project

Search Result 601, Processing Time 0.025 seconds

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Mistakes Made, Lessons Learned: The Eulsukdo Wetland Restoration Program

  • Lineman, Maurice J.M.;Do, Yuno;Kim, Ji-Yoon;Joo, Gea-Jae
    • Journal of Environmental Science International
    • /
    • v.23 no.8
    • /
    • pp.1523-1536
    • /
    • 2014
  • Restoration is the process of reducing or reversing damage to an ecosystem so that it can function in its original manner. However, many restoration programs do not achieve this. In the Nakdong Estuary, the largest migratory nesting site in the center of the East Asian-Australasian flyway, an estuarine barrage was constructed in the 1980s that required site restoration following its completion in 1987 and the expansion of several large industrial complexes(Noksan and Jangrim) and a residential development(Myeongji). The goal of the restoration was to restore the function of the wetland to its pre-disturbance state. To achieve this, a restoration program was designed consisting of three stages. The first stage(1993-1995), saw the construction of three artificial wetlands(Shinhori, Daemadeung, and Eulsuk), the second(2003-2005) involved the dredging and returning of farmed lands to their natural state, and the third(2008-2012) focused on the rehabilitation and vegetation development of the wetlands. However, the project has not achieved all of the desired goals, and it is an example of the lapses in ecological restoration following anthropogenic disturbance. Issues that resulted in an incomplete restoration included the timing of the stages, noncompliance with the restoration plan, not directly monitoring the restoration or continuing the monitoring following completion of the development project, and the political subversion of the restoration plan. For the success of the restoration plan, it is necessary to avoid mistakes such as inconsistent monitoring, unequal levels of stakeholder involvement, and political interference.

A Study on the Establishment of Concept and Selection criteria of Intelligent Security Technology Test-bed based on Spatial Information (공간정보 기반 지능형 방범 실증지구 개념 정립 및 선정기준에 관한 연구)

  • Shin, JuHo;Han, SunHee;Lee, JaeYong
    • Spatial Information Research
    • /
    • v.22 no.6
    • /
    • pp.45-54
    • /
    • 2014
  • Establishment of safety net for the socially disadvantaged attracts large attention because of the recent crime increasing against vulnerable groups. For the successful establishment of social safety net, the test-bed for evaluation and realization of crime-related research results is required. However, previous R&D test-bed projects such as The Korean Land Specialization Program or U-Eco City project remains only to the stage of verification. Therefore, there are limitedness for realization of result technologies or sustainable operation & management of test-bed after projects finished. So, sustainable operation & management system and guideline of test-bed are necessary. Therefore, this study reviews the strengths and weaknesses of existing test-bed cases and intelligent security researches. After reviewing, the concept of a Intelligent Security Test-bed is established and appropriate test-bed selection criteria is also suggested. Based on objective criteria, selected test-bed can achieve sustainable management even after finishing the project and contribute the construction of standard model for citizen's safety.

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

Case Study on the Explosive Demolition of the KOGAS Office Building in Bundang District (한국가스공사 분당사옥 발파해체 시공사례)

  • Kim, Sang-min;Park, Keun-sun;Son, Byung-min;Kim, Ho-jun;Kim, Hee-do;Kim, Gab-soo
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.48-61
    • /
    • 2018
  • This case study is concerned with the project of the explosive demolition for the KOGAS office building located in Bundang district in Seongnam city. Since the office building was a kind of long-span beam structures, a mechanical demolition method using jacking support systems was considered in the beginning of the project. With consideration of the excessive reinforcement cost, uncertainty of safety, and prolonged construction period, however, the original plan was later changed to use an explosive demolition method. For the purpose of protecting nearby buildings and facilities during the collapse process, the explosive initiation sequence was elaborately designed to bring down the building structure towards its front left corner. A total of over 550 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate columns in the first, second, and fifth floors. To diminish dust production, water bags of small and large sizes were respectively installed at each column and on the floors to be blasted. As such, every effort was exercised to mitigate overall noise, dust, and shock vibrations that could be generated during the explosive demolition process for the office building.

Productivity analysis using a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 적용시 생산성 분석)

  • Lim, So-Young;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.87-95
    • /
    • 2020
  • With the advent of the 4th industrial revolution and the combination of IoT, there have been diverse domestic and foreign researches for the development of construction industry. Especially, in the large-scale earthwork site where many and various construction equipments are put into, the control system between construction equipments is important for the increase of productivity. Thus, after developing the fleet management system for the optimum operation of construction equipments, the problems were checked and improved for each step in the process of application at site. In order to verify the site application process of the fleet management system for the optimum operation of construction equipments, the analysis on the productivity was performed by inputting the data used for the actual site and the site data using this system and then comparing the data through simulation. The analysis was limited to excavator and dump. In the results of the analysis, the rate of work per hour was increased to the range of 4 % while the cost price was decreased to 4 %. Even though the results of the analysis could be different depending on the site applied, the results showing the increase of workload of equipments and the decrease of cost price in the complex project at earthwork site verify the increase of productivity.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work - (비정형 건축물 공사의 생산성 분석 및 향상방안 - 노출콘크리트 공사를 중심으로 -)

  • Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.38-46
    • /
    • 2014
  • The Global's top five Design Firms selected from BauNetz a German architectural magazine in 2007 designed free form building design which was 25% of the overall design by 2006-2010. Free form building is a landmark of the city and the country so its social and economic impacts are very large. In case of Korea, free form buildings such as Tribowl in Incheon, KINTEX Exhibition hall 2 and Dongdaemun Design Plaza have increased. However, those the increase in design trends and, the needs due to the lack of free form building design and construction management experience, free form building projects can't be expected to profitability and have a number of problems after completion. Especially, there are many excessive quality problems and the rising cost due to design changes frequently and lack of experience and data. Thus an initial plan regardless of considering of free form building's characteristics can be a huge risk because of the difference with the plan and actual projects, yet there aren't free form building project's performance data and case studies related to productivity. In this study, through selection of low-construction productivity works and an analysis of the work process and productivity data, hope to propose an actual field productivity of free form building and the ways to improve productivity.

Impact of a Large Water Control on Environment of Surrounding Cultural Heritage (대규모 치수(治水) 사업이 주변 문화재 환경에 미치는 영향)

  • Jeong, Seon Hye;Kim, Si Hyun;Han, Ye Bin;Lee, Min Young;Lee, Hyun Ju;Chung, Yong Jae
    • Journal of Conservation Science
    • /
    • v.32 no.3
    • /
    • pp.395-402
    • /
    • 2016
  • The impact of a large water control project on surrounding environment(temperature and relative humidity, precipitation, wind speed, present weather and visibility) was monitored. The survey have targeted on Silleuksa temple which is located in the waterside. The number of foggy days emerged as an environmental factor that can cause damage to cultural heritage. Under construction of weir since 2011, monthly relative humidity of Yeoju and Icheon was dropped to 9.6%. It depends on decrease in the number of raining days and precipitation of each year. Silleuksa temple is contiguous to Namhan River and only 100 m away from the waterside. Average wind speed is 0.5 m/s. Silleuksa has a site environmental factors which is often foggy. The number of foggy days of Silleuksa temple declined to 53 days soon after weir's completion. In case of fog, relative humidity of outside was higher than that of outside and inside of Josadang Shrine. Relative humidity difference of outside and inside of Josadang Shrine was 5.4% on average. Relative humidity of the number of foggy days is 6.3% higher on average than that of fine days. The width and dimensions of Namhan River increased by 1.45 times after weir's construction. It can change the number of foggy days. A long-term monitoring is positively necessary on fog occurrence and relative humidity.