• Title/Summary/Keyword: large construction project

Search Result 603, Processing Time 0.025 seconds

Vegetation Change Detection in the Sihwa Embankment using Multi-Temporal Satellite Data (다중시기 위성영상을 이용한 시화 방조제 내만 식생변화탐지)

  • Jeong, Jong-Chul;Suh, Young-Sang;Kim, Sang-Wook
    • Journal of Environmental Science International
    • /
    • v.15 no.4
    • /
    • pp.373-378
    • /
    • 2006
  • The western coast of South Korea is famous for its large and broad tidal lands. Nevertheless, land reclamation, which has been conducted on a large scale, such as Sihwa embankment construction project has accelerated coastal environmental changes in the embankment inland. For monitoring of environmental change, vegetation change detecting of the embankment inland were carried out and field survey data compared with Landsat TM, ETM+, IKONOS, and EOC satellite remotely sensed data. In order to utilize multi-temporal remotely sensed images effectively, all data set with pixel size were analyzed by same geometric correction method. To detect the tidal land vegetation change, the spectral characteristics and spatial resolution of Landsat TM and ETM+ images were analyzed by SMA(spectral mixture analysis). We obtained the 78.96% classification accuracy and Kappa index 0.2376 using March 2000 Landsat data. The SMA(spectral mixture analysis) results were considered with comparing of vegetation seasonal change detection method.

Drivability Monitoring of Large Diameter Underwater Steel Pipe Pile Using Pile Driving Analyzer. (수중 대구경강관말뚝의 항타관입성 모니터링을 위한 PDA 적용 사례)

  • Kim, Dae-Hak;Park, Min-Chul;Kang, Hyung-Sun;Lee, Won-Je
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.11-19
    • /
    • 2004
  • When pile foundation constructed by driving method, it is desirable to perform monitoring and estimation of pile drivability and bearing capacity using some suitable tools. Dynamic Pile Monitoring yields information regarding the hammer, driving system, and pile and soil behaviour that can be used to confirm the assumptions of wave equation analysis. Dynamic Pile Monitoring is performed with the Pile Driving Analyser. The Pile Driving Analyser (PDA) uses wave propagation theory to compute numerous variables that fully describe the condition of the hammer-pile-soil system in real time, following each hammer impact. This approach allows immediate field verification of hammer performance, driving efficiency, and an estimate of pile capacity. The PDA has been used widely as a most effective control method of pile installations. A set of PDA test was performed at the site of Donghea-1 Gas Platform Jacket which is located east of Ulsan. The drilling core sediments of location of jacket subsoil are composed of mud and sand, silt. In this case study, the results of PDA test which was applied to measurement and estimation of large diameter open ended steel pipe pile driven by underwater hydraulic hammer, MHU-800S, at the marine sediments were summarized.

  • PDF

Study on large tonnage pile foundation load test system and field test of long rock-socketed pile

  • Zhang, Xue-feng;Ni, Ying-sheng;Song, Chun-xia;Xu, Dong
    • Geomechanics and Engineering
    • /
    • v.21 no.6
    • /
    • pp.565-570
    • /
    • 2020
  • Large tonnage pile foundation load test system is designed in this paper by using pre-stressed technique to optimize the design of anchor pile reaction beam system, in which project pile can be successfully taken as anchor pile. The test results show that the cracks and excessive deformations of the prestressed anti-force device designed in this study have not occurred, and the prestressed tendons of the anchor pile ensure that the anchor pile will not be pulled and fractured, and the prestressed tendons can be reused, thus ensuring the safety and reliability of the test. This test method can directly test bearing capacity of long rock-socketed piles, and analysis bearing behaviors from test results of sensors which embedded in the pile. Through test studied, authors summarized the vertical bearing characteristics of long rock-socketed piles and the main problems that should be paid attention to during design and construction, and provided reliable solutions.

A Study on the Component and Interior Design of the Underground Space - Focused on the Banwoldang Hetero Center of the 2 Subway Line in Daegu - (지하공간의 구성요소 및 실내디자인에 관한 연구 - 대구지하철2호선 반월당 메트로센타를 중심으로 -)

  • Kim Wan-Jun;Lee Sang-Ho
    • Korean Institute of Interior Design Journal
    • /
    • v.15 no.3 s.56
    • /
    • pp.163-172
    • /
    • 2006
  • The underground space of the Banwoldang in Daegu is the private enterprise historical development project that Daegu City & The forth construction company of the Samsung, Kolon, Daewoo, Hwasung promote, and take a role as the underground bridgehead that links east and west of the Daegu as the lunction of the 2 subway line. Accordingly, the underground space of the Banwoldang in Daegu have a import significance in that not only the alternative of the solution about the simple commercial formation or the limited ground but also compose the important axis of the city develoment. But, When I see the variety of problems, especially see the negative import in Daegu, the solution of the problems is the large underlying cause that revitalize the city. Consequently, in the study I would like to analyze the characteristics of the large underground space and the directivity of the interior design, to assistant for the develement plan of the more safe, comfort underground space.

Comparison of Characteristics of Drone LiDAR for Construction of Geospatial Information in Large-scale Development Project Area (대규모 개발지역의 공간정보 구축을 위한 드론 라이다의 특징 비교)

  • Park, Joon-Kyu;Lee, Keun-Wang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.768-773
    • /
    • 2020
  • In large-scale land development for the rational use and management of national land resources, the use of geospatial information is essential for the efficient management of projects. Recently, drone LiDAR (Light Detection And Ranging) has attracted attention as an effective geospatial information construction technique for large-scale development areas, such as housing site construction and open-pit mines. Drone LiDAR can be classified into a method using SLAM (Simultaneous Localization And Mapping) technology and a GNSS (Global Navigation Satellite System)/IMU (Inertial Measurement Unit) method. On the other hand, there is a lack of analytical research on the application of drone LiDAR or the characteristics of each method. Therefore, in this study, data acquisition, processing, and analysis using SLAM and GNSS/IMU type drone LiDAR were performed, and the characteristics and utilization of each were evaluated. As a result, the height direction accuracy of drone LiDAR was -0.052~0.044m, which satisfies the allowable accuracy of geospatial information for mapping. In addition, the characteristics of each method were presented through a comparison of data acquisition and processing. Geospatial information constructed through drone LiDAR can be used in several ways, such as measuring the distance, area, and inclination. Based on such information, it is possible to evaluate the safety of large-scale development areas, and this method is expected to be utilized in the future.

Three dimensional finite element analysis of 4 inch smart flange on offshore pipeline

  • Moghaddam, Ali Shaghaghi;Mohammadnia, Saeid
    • Ocean Systems Engineering
    • /
    • v.4 no.4
    • /
    • pp.279-291
    • /
    • 2014
  • Smart flanges are used for pipeline and riser repair in subsea. In a typical case in the gas export pipeline project, the end cap bolts of a 4inch smart flange were broken during operation, and in turn leakage occurred. This work presents the detail of three dimensional finite element analysis of the smart flange to support the observed end cap bolts failure. From finite element analysis it turns out that in the presence of external bending moment, an uneven contact distribution is present between seal and end cap, which in turn changes the uniform load distribution on bolts and threaten the integrity of bolts. On the other hand, 3D finite element analysis of interaction between pipeline and seabed is presented by means of Abaqus to explore the distribution of bending moment along the pipeline route. It is found that lateral buckling occurs in the pipeline which introduces large bending moment.

Discussion On the Strategy for the Rail Transportation Recently Developed in Shanghai

  • Tan, Fuxing;Zhang, Quanfu;Weng, Meng-Xing
    • Proceedings of the KOR-KST Conference
    • /
    • 1996.06a
    • /
    • pp.131-137
    • /
    • 1996
  • This paper discusses the necessity, strategy and objectives of the rail transportation recently developed in Shanghai. The objective should not be regarded just as a term project, but should be taken as an urgent mission with the 21st century, Shanghai should possess a network of about 100km of rail transport lines. To this end, the following measures are suggested : grade separation of all lines on elevated structures ; developing the rail car industries ; full utilization of all available transportation facilities ; optimizing the use of the space resources of highways ; bringing into play the initiatives of all parties concerned. Recently, it has become a popular consensus that the development of high-speed, safe, punctual, comfortable, non-pollution rail transport with large capacity is the best and only solution to Shanghai urban transportation. In this respect, this dissertation deals with the development strategy for current Shanghai rail construction, together with the infractructure in Shanghai, positioning the developing target; meanwhile, some proposals and solutions to hit this target will be put forward for the reference of leaders and experts.

  • PDF

Comparisons of methods determining preconsolidation pressure for western marine clay of korea (서해점토에 대한 선행압밀하중 선정기법 비교)

  • Im, Eun-Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.960-963
    • /
    • 2010
  • In recent days, the development project for industry or housing complex at west coast of Korea is on an increasing trend. the design of soft ground is necessarily required. So, the evaluation of consolidation characteristics for soft ground is very important in design and construction. Especially, the correct evaluation of preconsolidation pressure or OCR for given soft ground is essential at the west coast that has a large tidal range, since it affects the settlement of soft ground. In this study, various methods determining preconsolidation pressure were carried out to investigate the application of each method. The preconsolidation pressure that evaluated from the results of conventional consolidation tests on the songsan clay were compared.

  • PDF

Experimental Estimation of the Early Strength of Belite Cement Mortar Using Microwave (저열 포틀랜드(4종)시멘트 모르터의 마이크로파를 이용한 조기강도 추정에 관한 실험적 연구)

  • 김민석;박재한;정근호;이종균;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.1077-1082
    • /
    • 2001
  • The most recent building trend is going large, high rise, high strength as overlarge project is developing in domestic construction business. Belite cement has properties like low heat, excellent long term strength, and durability without admixture(fly ash, silica fume). so, Belite cement is suitable for mass structure which is needed high strength, high fluidity and low heat property. This study is to examine the possibility of site adoption microwave-use early strength estimation method. Based on the existed study related the portland cement, the interrelation between Belite cement and microwave-use early strength estimation method is required. In this study, interrelation between mortar and Evaluating strength estimation method is investigated before the concrete experiment.

  • PDF

Construction of the Busan-Geoje Fixed Links Immersed tunnel (기획특집 - 거가대교 침매터널의 시공)

  • Cho, Bong-Hyun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.2
    • /
    • pp.34-38
    • /
    • 2010
  • The Busan-Geoje Fixed Link is an 8.2 km long motorway connecting Busan to the island of Geoje where the Korean big two shipbuilding yard locate on. This motorway includes a 3,300m immersed tunnel which is one of the longest immersed tunnel in the world and two cablestayed bridges each of 2km in length. The site locates in a exposed offshore, which is subjected to strong winds, large swell waves and strong tidal currents. These conditions together with the tunnel being at a deepest immersed tunnel ever built and the foundation condition is consisting of a very soft, normally to slightly over consolidated marine clay, makes the project unique and one of the most challenging immersed tunnels ever built.

  • PDF