Modified Approaches to Delay Estimation for the Work Zones in the Proximity of the Signalized Intersections (공사구간이 있는 신호교차로의 지체산정을 위한 새로운 접근)

  • Shin, Chi-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.269-281
    • /
    • 2018
  • Unlike its archetype predecessor such as the Highway Capacity Manual of the United States, the Korean Highway Capacity Manual of 2013 provides the analytical models for estimating the saturation flow rates for the lane-occupying work-zones in the proximity of the signalized intersections. Direct application of the revised saturation flow rates into the classic control delay models, however, appears to produce unreasonable delay amount as traffic demand approaches lane-group capacities and surpasses them, which is common phenomena in the work-zones. Complex interaction among vehicles, lane-dropping work-zone geometry and signal operations were never accounted in the traditional control delay models, and considerable differences between the delay model outcomes and field observations are repeatedly experienced. This paper proposes the modified approaches to the delay models in the manual, exerted on all three elements of control delay, and particularly focuses on the temporal and spatial boundary expansion in comparing the simulated results to the estimated ones. Extensive microscopic simulation work and calibration effort supports the modified approaches well enough to use them in the work-zone planning and evaluation.

Optimal Signal Times for Active Bus Signal Priority on Median Bus Lane Using Deterministic Delay Model (중앙버스전용차로상에서 결정적 지체모형을 이용한 능동형 버스우선신호의 최적 신호시간 산출방안)

  • Kim, Tae-Woon;Jeong, Young-Je;Kim, Young-Chan
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.13 no.1
    • /
    • pp.15-25
    • /
    • 2014
  • Bus signal priority is a name for various techniques to speed up bus public transport services at intersections with traffic signals. In this study propose methodology to optimize signal times for Early green, Green extension out of the active bus signal priority using deterministic delay model in isolated intersection on median bus lane. Fluctuation is found in the vehicle delay and person delay in the event that using this methodology redistributed to green time and checking slack green time is correct value by sensitivity analysis. As a result of the study, car delay is increased a little and person delay is decreased. As a result of slack green time sensitivity, delay is not much in it if variation of slack green time under 30%. But this methodology effectiveness is under claimed capacity if variation of slack green time over 30%.

A study of signal control with COSMOS on National Highway (신신호시스템(COSMOS)의 일반국도 적용에 대한 연구)

  • Baek Hyon-Su;Kim Young-Chan;Moon Hak-Yong;Kim Jong-Sik
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.3 no.2 s.5
    • /
    • pp.29-40
    • /
    • 2004
  • The performance of the National Highway is raised, but the capacity of the signalized intersection on the National Highway is low. It's operated by TOD(Time Of Day) mode. To evaluate of the performance of COSMOS(Cycle, Offset, Split Model for Seoul), a real time traffic adaptive signal control system, on the National Highway, studied volume, travel time and queuing length at TOD control and TRC(Traffic responsive Control). Consequently, the average travel speed at TRC is high $2.9\~16.7$km/h then the average travel speed at TOD control. And te queuing length at TRC is low $15\~196m$ then the queuing length at TOD control.

  • PDF

A Study on Standardization of UPS (Uninterruptible Power Supply) for Traffic Signal Controller (교통신호제어기용 무정전전원장치 용량기준 연구)

  • Ko, Kwang-Yong;Lee, Choul-Ki;Kim, Min-Sung;Heo, Nak-Won;Jeong, Jun-Ha
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.11 no.5
    • /
    • pp.1-6
    • /
    • 2012
  • Unlike the past, modern urban intersections have dramatic growth in size and utilizations. As a result, continual traffic signal control is essential. Hence the individual or regional electrical blackout may bring about uncontrollable traffic congestion. Late summer of 2011 a regional blackout brought about traffic nightmare not including time and revenue loss associated with this disaster. Due to this disaster our national police agency and other government agencies are in process of introducing an UPS (uninterruptible power supply) system into essential intersections. This study estimates the power consumption necessary to sustain at least 2 continuous hours for a standard four-legged intersection. Prototype was studied using these standards. The field experiment of prototype showed positive results and was able to meet standard guidelines set forth. Prototype tested was able to meet standards in medium to large capacity of traffic size.

Green-Split Coordination Strategy in Oversaturated Signal System (과포화교통상태에서의 SPLIT COORDINATION신호제어전략)

  • 이광훈
    • Journal of Korean Society of Transportation
    • /
    • v.11 no.1
    • /
    • pp.87-103
    • /
    • 1993
  • The subject this paper is the signal control strategy under oversaturated conditions. The nature of traffic control for oversaturation is essentially different from the standard control modes. While under non-saturated situation traffic control is needed for the sake of safety and efficiency, the throughput is essential under oversaturated conditions. Therefore berth objective and strategies differ. For an oversaturated stream the cycle time and the signal offset are thought to be of rather secondary importance. For this case the green split may well be the most important control variable to serve the excessive demand. Up to now, however, most efforts have concentrated on the strategy with the concept which lies just on the extension of Webster's. "Green-split Coordination Strategy for Over-Saturated Networks", presents newly contrived three types of strategies named Forward-coordination, Backward-coordination and Network-coordination respectively and describes the algorithms with the evaluations. The forward coordination strategy treats the forward wave of flow between two signals. The aim is to prevent the outbreak of queue due to the accumulation of temporary excess of demand in near-saturation or saturation flow. The backward coordination strategy treats the backward rave of flow between two signals. The goal is to prevent the waste of green time caused by the exit block at the upstream signal. for this purpose a feedback regulation is provided of the upstream green-split so that the inflow-outflow balance is kept zero. The resultant surplus of green time is alloted to other signal stages. Also here the examination is made of the appropriate value of the feedback control parameter. The network coordination strategy is operated to maximize the network throughput in a specific direction applying a bang-bang control at the bottleneck intersection. This is a type of intervenient control for policy reasons. For this strategy the green-split coordinations, particuarly the backward coordination, are essential as the tactical elements. In order to evaluate the preposed strategies those are compared with the latest existing strategy called saturation-degree-ratio control by the simulation experiments in an assumed 4$\times$4 grid network. The results are satisfactory showing a 10-15% reduction in delays and a 15% increase in network capacity.

  • PDF

Performance Comparison of Signalized Intersections Analysis Tools in Estimating Control Delays (신호교차로 분석도구별 제어지체 산출 성능 비교 연구)

  • Yun, Ilsoo;Oh, Cheol;Ahn, Hyunkyung;Kim, Kyunghyun;Han, Eum;Kang, Nam Won;Yoon, Jung Eun
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.109-119
    • /
    • 2014
  • PURPOSES : The control delay in seconds per vehicle is the most important traffic operational index to evaluate the level of service of signalized intersections. Thus, it is very critical to calculate accurate control delay because it is used as a basic quantitative evidence for decision makings regarding to investments on traffic facilities. The control delay consists of time-in-queue delay, acceleration delay, and deceleration delay so that it is technically difficult to directly measure it from fields. Thus, diverse analysis tools, including CORSIM, SYNCHRO, T7F, VISTRO, etc. have been utilized so far. However, each analysis tool may use a unique methodology in calculating control delays. Therefore, the estimated values of control delays may be different by the selection of an analysis tool, which has provided difficulties to traffic engineers in making solid judgments. METHODS : This study was initiated to verify the feasibility of diverse analysis tools, including HCM methodology, CORSIM, SYNCHRO, T7F, VISTRO, in calculating control delays by comparing estimated control delays with that measured from a field. RESULTS : As a result, the selected tools produced quite different values of control delay. In addition, the control delay value estimated using a calibrated CORSIM model was closest to that measured from the field. CONCLUSIONS : First, through the in-depth experiment, it was explicitly verified that the estimated values of control delay may depend on the selection of an analysis tool. Second, among the diverse tools, the value of control delay estimated using the calibrated microscopic traffic simulation model was most close to that measured from the field. Conclusively, analysts should take into account the variability of control delay values according to the selection of a tool in the case of signalized intersection analysis.

Position of Stop Line according to the Left Turn Trajectory at Intersection (교차로 좌회전 궤적에 따른 정지선 위치에 관한 연구)

  • 김기용;김동녕
    • Journal of Korean Society of Transportation
    • /
    • v.18 no.3
    • /
    • pp.29-39
    • /
    • 2000
  • Position of stop line according to left turn trajectory at intersections was studied. The Purpose of this study is to suggest a design guideline of left turn trajectory at intersections which is related to the Position of cross road stop line. Distance from the curb line to the stop line at each lane was calculated and discussed for various combination of road widths. Three design vehicle type and three control radii were considered. Setbacks of stop line from the curb line are Proportional to the control radius which depends on type of design vehicle. 8m, lim and 19m setback for control radius of 12m, 15m and 23m were calculated respectively as their maximum value. This result will be helpful to Paint the road marking on the Pavement which is usually difficult to fit to the designated radius. Field study of the effect of left turn trajectory on flow rate and safety was conducted. It was approved that improperly designed left turn trajectory decreases left turn capacity and increases conflicts among left turn flows of the adjacent lane.

  • PDF

The Earth Pressure Distribution of Crib Wall (Crib Wall의 토압분포)

  • Oh, Sewook;Kwon, Youngcheul;Bae, Wooseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.5
    • /
    • pp.41-48
    • /
    • 2006
  • Crib wall is one of the segmental grid retaining walls using headers and stretchers to establish the framework of the wall. In this method, grids formed by the intersection of headers and stretchers are generally filled with the gravel to maintain the weight of the wall. Therefore, the construction can be carried out with higher speed and much economically when compared with the concrete retaining wall. Furthermore, it has high drain capacity, and environmentally friendly aspects also have been pointed out because the possibility of the planting at the front of the wall. However, in the crib wall method, the relative movement between the individual headers and stretchers was generally recognized, and stress redistribution in the gravel filling was also observed when subjected to the external loading and self-weight of filling. Therefore, it has been thought that the distribution of the earth pressure in the crib wall system differ from that of the concrete retaining wall. In this study, the surcharge tests using the scaled model crib wall was carried out to observe the distribution of the earth pressure in the segmental grid retaining wall. The earth pressure was measured in the six specified height of wall, and the distribution of the pressure was analyzed. Furthermore, the earth pressure by computation or by the test using the concrete retaining wall was also considered to make comparison.

  • PDF

The Exploratory Study on Working Experience of Poor Female-Headed Families in Social Enterprise - Focusing on Empowerment Process - (사회적 기업 활동을 통한 빈곤여성가구주의 취업경험에 관한 탐색적 연구 -임파워먼트 과정을 중심으로-)

  • Kim, Hyo Soon
    • Korean Journal of Social Welfare
    • /
    • v.65 no.1
    • /
    • pp.175-199
    • /
    • 2013
  • This study was to investigate working experience of poor female-headed families in social enterprise focusing on empowerment process. For this study, nine female-headed women were interviewed and the collected qualitative data were analyzed through phenomenological research method. Main results of this study provided eight main construct factors, such as the intersection of hope and unhappy, economic independence through being alone, finding myself strong and worthy, consciousness of horizontal bondage, trouble situation, professionalism and pride, capacity to problem solving and self-importance of contribution to society. Based on the results of this study, working experience of poor female-headed families in social enterprise was strengthened from personal level and relational level to social level. Therefore, various policies and practical programs should be prepared to improve empowerment of female-headed families in poverty working in social enterprise.

  • PDF

Applying the ANFIS to the Analysis of Rain and Dark Effects on the Saturation Headways at Signalized Intersections (강우 및 밝기에 따른 신호교차로 포화차두시간 분석에의 적응 뉴로-퍼지 적용)

  • Kim, Kyung Whan;Chung, Jae Whan;Kim, Daehyon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.573-580
    • /
    • 2006
  • The Saturation headway is a major parameter in estimating the intersection capacity and setting the signal timing. But Existing algorithms are still far from being robust in dealing with factors related to the variation of saturation headways at signalized intersections. So this study apply the fuzzy inference system using ANFIS. The ANFIS provides a method for the fuzzy modeling procedure to learn information about a data set, in order to compute the membership function parameters that best allow the associated fuzzy inference system to track the given input/output data. The climate conditions and the degree of brightness were chosen as the input variables when the rate of heavy vehicles is 10-25 %. These factors have the uncertain nature in quantification, which is the reason why these are chosen as the fuzzy variables. A neuro-fuzzy inference model to estimate saturation headways at signalized intersections was constructed in this study. Evaluating the model using the statistics of $R^2$, MAE and MSE, it was shown that the explainability of the model was very high, the values of the statistics being 0.993, 0.0289, 0.0173 respectively.