• Title/Summary/Keyword: integrated Construction Management

Search Result 754, Processing Time 0.034 seconds

Study on an Integrated System using an ER Diagram for Chungcheong Rural Communities

  • Jang, Hyeon Seok;Park, Hyung keun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.693-694
    • /
    • 2015
  • While urban regeneration projects are currently under active execution in several old cities in Korea, there are few projects to improve the quality of life of rural communities. Considering the decline of the SOC system, deterioration of housing, and degeneration of economic feasibility, the purpose of this study is to provide solutions to realize an improved economic and social environment of rural communities through an integrated management system for traffic safety and water management systems. Therefore, this research used an Entity-Relationship Diagram to construct an integrated system for traffic safety and water management systems for Chungcheong rural communities. The ERD is prepared by depicting 7 relationships for 13 entities, including traffic accidents and agricultural products, and 26 attributes, including soil moisture and underflow storage. Consequently, it will be possible to set up a decision-making support system that can analyze and evaluate the regeneration index, technology, and management of the systems for Chungcheong rural communities, based on supplier and user perspectives

  • PDF

Case Study of Local Government Homepage for Integrated Construction Information Management (건설정보공유를 위한 정부기관 통합 홈페이지 구축사례 연구)

  • Kang, Leen-Seok;Lee, Hong-Gi;Kim, Hyun-Soo;Kwon, Jung-Hui
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.563-566
    • /
    • 2006
  • Generally, integrated information of construction project is managed by government. However, homepage cases for operating each construction project by government are still unusual in the construction site. This study introduces a case study of construction project homepage for the integrated project information, and then suggests an improved functions that need in homepage for using construction information in common in local area. The homepage used in the study is operated by Gyeongsangnam-do. The results can be used as improved contents of construction project homepage by local government.

  • PDF

An advanced nation's case study considering integrated control for construction work quality.safety.environment (건설공사 품질.안전.환경 통합관리를 고려한 해외 사례 고찰)

  • Kim, Dong-Hee;Kim, Woon-Soo;Jeong, Han-Gyo;Noh, Joung-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.819-823
    • /
    • 2008
  • Currently, the quality management, safety management and environment management of domestic construction work does not form a infrastructure for integrated control which have been developed according to the unique characteristics based on respective the law. In other words, the quality manager and safety manager of human resources is set to a legal arrangement personnel, but environment manager of human resources is not. In addition, quality management standard is to perform the work to PDCA(Plan-Do-Check-Action) system which is reflected in all of the requirements of KS A ISO 9001 standard, but safety management plan and hazard harmfulness prevention plan are not properly reflected P(Plan), C(Check) and A(Action) system and focusing on only 4 section Do(D) in KOSHA 18001 standard requirement. Moreover environmental management plan is not even established requirement. Through examining the operation practices of an advanced nation prior to building the integrated control standard for construction work qualify safety.environment, the possibility of applying domestic is reviewed, and then this study is going to research the operation practices of Singapore.

  • PDF

A System Development for Management of On-the-spot Using the Event Management Theory (EVENT 관리기법을 응용한 건설현장관리시스템에 관한 연구)

  • Yoon, In;Jeong, Chang-Won;Choi, Young-Sik;Yoon, Min
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.2 no.1
    • /
    • pp.113-119
    • /
    • 1999
  • In order to accomplish either information system with future estimate or scientic management, application package of integrated detail management is required for Construction Company. The application package of integrated detail management is based on management of estimation, management of account. management of tax bill, management of on the spot, management of equipment and management of labor. This research focuses on the basic survey for this system such as circumstance of information system for construction company, a barrier of progress, development dirction, development article.

  • PDF

Development and Application of Integrated Settlement Management System for Construction and Maintenance of Concrete Railway (콘크리트 궤도의 시공 및 유지관리를 위한 침하관리 통합 시스템의 구축 및 활용)

  • Woo, Sang-Inn;Chun, Sung-Ho;Chung, Choong-Ki;Lee, Il-Hwa;Kwon, Oh-Jung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1196-1202
    • /
    • 2007
  • In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.

  • PDF

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

Developing Computer Integrated Construction Methodologies to Improve Quality of Asphalt Pavement (아스팔트 포장의 품질향상을 위한 정보화 시공법 개발)

  • Lee Heejune
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.208-213
    • /
    • 2001
  • The current progress in computer and electrical engineering has enabled the construction industry to implement innovative technologies in design and engineering. However, the construction segment is still largely based on experience, and this makes it difficult to meet the recent rigorous specifications, especially in the highway construction. This paper describes the current progress and the findings in the development of the computer integrated asphalt paving system, which is expected to assist the equipment operators to construct the quality pavement. The technologies to collect the required information, preferably in real-time, were reviewed comprehensively, and the selected technologies are proposed for the future development. Positional and thermal data were collected at the sample project in real-time to verify the capability of the available technologies. The collected data was analyzed using multiple regression method to confirm the significant factors for the compaction of the sample project, and to develop the empirical model, which can be adopted in the future system.

  • PDF

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF