• Title/Summary/Keyword: integrated Construction Management

Search Result 788, Processing Time 0.026 seconds

A Study on the Improvement of Safety Management at the Construction Stage using Design for Safety Results - Focusing on the Connection between Design for Safety and Safety Management Plan (설계 안전성 검토 결과를 활용한 시공단계 안전관리 업무 개선 - 설계 안전성 검토와 안전관리계획의 연계를 중심으로)

  • Lee, Goon Jae
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.6
    • /
    • pp.54-60
    • /
    • 2020
  • Recently, the issue of construction safety is growing. In the construction industry, accidents have continued to increase since 2000. In particular, the number of accident deaths at small and medium-sized construction sites accounts for 72.11% of the total number of accident deaths in the construction industry. For construction safety, prior safety evaluation systems such as Design for safety and safety management plan preparation are in place. However, at construction sites, these systems are recognized as formal legal documents, and their effectiveness is greatly reduced. Therefore, in this study, a linkage model that links design safety review information and safety management plan information was presented so that the safety management plan can be efficiently established. In addition, the effectiveness of the proposed process was verified as an example of actual work. The linkage model will contribute to improving the safety management environment at the site by increasing the productivity of safety management work by enabling easy sharing of risk factor information in the construction stage safety management work. The results of this study will be used as basic information for the development of the integrated safety management system.

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

Integrated Information System for Environmental and Economic Evaluation (경제성 환경성 통합평가를 위한 정보통합시스템)

  • Kim, Chang-Hak;Shin, Min Ho;Kang, In Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.615-622
    • /
    • 2010
  • Recent years, the construction projects of a world-wide have changed toward integrated evaluation considering all environmental and economic aspect for ecological construction.. The object of this study is to suggest the method and system for integrated analysis VE/LCC and LCA. In order to integrate and analyze environmental and economic aspects of alternative design elements, decision maker should handle simultaneously much information such as cost, document and drawing. This study presents applicative methods of WBS for integrated management of these information. Also, this study presents a decision support system that can manage DB easily by using VE, LCC and LCA analysis module separately.

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

Importance analysis of BIM utilization by construction management companies

  • Seo-Hee Jeong;Da-Yeon Yang;Gwang-Hee Kim
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1289-1289
    • /
    • 2024
  • As the construction industry has recently transitioned to smart construction, the importance of project management using Building Information Modeling(BIM) is increasing. BIM and Construction Management(CM) share integrated management of various information that may arise in a project, allowing BIM to be utilized in various ways in CM. In this study, an Analytic Hierarchy Process(AHP) survey was conducted targeting BIM users at CM companies. The items of the AHP survey were divided into company-level factors and project-stage factors of BIM to measure utilization. This study analyzes the importance of BIM utilization factors used by CM companies through an AHP survey of BIM users and identifies the current status of the most utilized BIM. As a result of the AHP survey of company-level factors, the BIM application project showed the highest importance for BIM activation in CM. Furthermore, as a result of the AHP survey of factors by project stage, constructability review, interference review, and design change management showed the highest importance in that order. This implies that for BIM to be activated, CM companies need to increase the number of BIM-applied projects. Additionally, besides the factors most commonly used in current practice, there is a need to examine whether there are fewer factors utilizing BIM in a variety of applications. This study is expected to contribute to the activation and introduction of BIM in future construction project management.

Method of RFID Network System Application for Improving of Construction Productivity in Construction Site (건설생산성 향상을 위한 건설현장 내 RFID 네트워크 시스템 적용 방안)

  • Kim, Shin-Gu;Lee, Choong-Hee;Lee, Sung-Hyung;Kim, Jae-Hyun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.8B
    • /
    • pp.1224-1231
    • /
    • 2010
  • We study the RFID network system in a construction site, and study the connection method between the RFID network system and the integrated information system of construction material. Moreover, we developed a prototype of the construction site RFID server for the management of construction materials and performed the pilot application in a construction site. Through the pilot application, it was known that the proposed RFID network system can be more usefully applied in the construction sites. The results of the pilot application show that the RFID network system is faster, more accurate, and more reliable than the existing system of information management and achieves improvement in construction productivity.

A Study on the ANP Application for the Construction of Integrated CEM Model (CEM통합모델 구축을 위한 ANP활용에 관한 연구)

  • Jin, Han-Xin;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.171-184
    • /
    • 2005
  • Today, the usage of DB already becomes an important issue for many companies' survival, especially, for the companies who have adopted CRM(Customer Relationship Management). CEM(Customer Experience Management), as a practical alternative, can settle it. In this paper, we use QFD(Quality Function Deployment) and GA(Genetic Algorithm)-based Group ANP(Analytic Network Process) to construct the Integrated CEM Model to help company decide the priorities of investment in customer experiences.

  • PDF

Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction (철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출)

  • Ryu Si-Wook;Ahn Byung-Jun;Ryu Myung-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

Development of Technology for Network Construction using Wide Area Energy (광역에너지이용 네트워크 구축 기술개발)

  • Kim, Lae-Hyun;Chang, Won-Seok;Hong, Jae-Jun
    • Journal of Energy Engineering
    • /
    • v.17 no.3
    • /
    • pp.125-138
    • /
    • 2008
  • In order to diversify energy source and to utilize it effectively, it requires to construct an integrated energy management system in a wide area. This research paper explores the core technology of network construction using wide area energy and applies the technology to the field. In specific, it examines the business model by developing l) construction technology of optimum integrated system for thermal supply on wide area network related IT technology, 2) technology of unutilized energy as heat pump using exhaust gas latent heat, and 3) thermal transportation and storage technology using various sources, and by evaluating the applicability and marketability of the model in the field.