• Title/Summary/Keyword: installation effort

Search Result 81, Processing Time 0.02 seconds

Design of a High Stiffness Machining Robot Arm with Double Parallel Mechanism (기계가공작업을 위한 강성이 큰 2단 평행구조 로보트 암 설계)

  • 이민기
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.19 no.1
    • /
    • pp.22-37
    • /
    • 1995
  • Industrial robot has played a central role in the production automation such as welding, assembling, and painting. There has been, however, little effort to the application of robots in machining work(grinding, cutting, milling, etc.) which is typical 3D work. The machining automation requires a high stiffness robot arm to reduce deformation and vibration. Conventional articulated robots have serially connecting links from the base to the gripper. So, they have very weak structure for he machining work. Stewart Platform is a typical parallel robotic mechanism with a very high stiffness but it has a small work space and a large installation space. This research proposes a new machining robot arm with a double parallel mechanism. It is composed of two platforms and a central axis. The central axis will connect the motions between the first and the second platforms. Therefore, the robot has a large range of work space as well as a high stiffness. This paper will introduce the machining work using the robot and design the proposed robot arm.

ICT Convergence Public Bicycle System using Smart Phones (스마트폰을 이용한 융복합 공공자전거 시스템)

  • Jeong, Kyu-Man
    • Journal of Digital Convergence
    • /
    • v.13 no.4
    • /
    • pp.247-252
    • /
    • 2015
  • The earth has been suffering from global warming and experiencing unusual weather caused by increased fossil fuel usage in the industrialization period. In spite of the continuous effort to resolve the problem, the amount of fossil fuel usage is increasing constantly. Public bicycle system has been introduced as a solution to the fundamental problem of the existing public transportation systems. Also public bicycle system has another advantage that riding bicycle can keep the users in good health. In this paper, a new ICT convergence public bicycle system is presented which resolves the problems of existing public bicycle systems. The presented system has strong points in low installation fee and low maintenance expenses. The effectiveness of the presented system will be proven by analyzing case studies.

A Study of Bubble Pump that is applied Solar Heating Water System (태양열 온수 시스템에 적용한 기포펌프의 동작특성에 관한 연구)

  • Park, G.T.;Song, L.;Shim, K.J.;Jeong, H.M.;Chung, H.S.
    • Journal of Power System Engineering
    • /
    • v.11 no.4
    • /
    • pp.32-37
    • /
    • 2007
  • Regarding the need of energy in advance and the depletion of fossil fuel energy, all researches around the world now are trying to extract energy from many alternative sources especially the renewable one. Solar, ocean tidal, wind and geothermal energy are renewable energy fields which many researches are focused on. This paper explains about effort to replace electric pump used in solar water heating system by bubble pump. The utilization of bubble pump in this system is very efficient since it needs heat energy for its operation that can be obtained easily. In addition, it can also simplify the construction of the system. Bubble pump also functions as a controller to circulate water inside the system. Before the installation of bubble pump, the special quality and performance of bubble pump should be analyzed. The result got from the analysis could show the fluctuation of water flow rate occurred because it sensitively reacts to the heat quantity. Here the heat quantity is taken from the solar that, as we know, is not stable in a whole day. Problems often occurred are the flow rate in this system is very low moreover it could be stop if the pressure exceeds the limit.

  • PDF

A Study on the Development of an Interactive Web Based Resource Center for K-12 Mathematics Teachers (초.중등 수학교사를 위한 상호 작용적 웹기반 자료센터 개발 연구)

  • 김민경;노선숙
    • The Mathematical Education
    • /
    • v.39 no.1
    • /
    • pp.71-80
    • /
    • 2000
  • As the new century begins, it is clear that K-l2 education is going through a major change. The increasing power and affordability of personal computers along with wide spread use of the Internet has not only changed the landscape for communication but it has opened up new and exciting opportunities for education. One of the ways that Internet could help improve education is to act as an interactive communication link to gather the knowledge and experience of all the teachers and to serve as an open forum for discussing and exchanging innovative ideas. But developing a successful site is not an easy task since the success of the site depends on the level of participation and cooperation of teachers. In this paper, learnings derived from the development of an interactive web based resource center for K-12 mathematics teacher are described and recommendations for developing an effective site for teachers are suggested. The development of an interactive resource center for mathematics teachers showed that while interest for a web based resource is very high, the main obstacle for effective teacher participation is lack of easy accessibility of internet by teachers, and lack of computer and internet training for teachers. The technical issues regarding hardware installation, software development and cost were minimal. Accessibility will improve in time as more and more schools are connected to the internet, but this alone will not be enough. The study suggests that in order to bring together teachers on the internet more effort needs to be made in training teachers on the use of computers and the internet.

  • PDF

Development of Computational Tools for Seismic Design of Architectural Components in Negative Pressure Isolation Wards (음압격리병동의 건축 비구조요소 내진설계를 위한 전산도구 개발)

  • Chu, Yu Rim;Kim, Tae Jin
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.26 no.3
    • /
    • pp.127-136
    • /
    • 2022
  • Recently, an unprecedented emerging infectious disease has rapidly spread, causing a global shortage of wards. Although various temporary beds have appeared, the supply of wards specializing in infectious diseases is required. Negative pressure isolation wards should maintain their function even after an earthquake. However, the current seismic design standards do not guarantee the negative pressure isolation wards' operational (OP) performance level. For this reason, some are not included in the design target even though they are non-structural elements that require seismic design. Also, the details of non-structural elements are usually determined during the construction phase. It is often necessary to complete the stability review and reinforcement design for non-structural elements within a short period. Against this background, enhanced performance objectives were set to guarantee the OP non-structural performance level, and a computerized tool was developed to quickly perform the seismic design of non-structural elements in the negative pressure isolation wards. This study created a spreadsheet-based computer tool that reflects the components, installation spacing, and design procedures of non-structural elements. Seismic performance review and design of the example non-structural elements were conducted using the computerized tool. The strength of some components was not sufficient, and it was reinforced. As a result, the time and effort required for strength evaluation, displacement evaluation, and reinforcement design were reduced through computerized tools.

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

Study of the Effect of the Point-to-Point Speed Enforcement System Using a Comparison-Group Method (비교그룹방법을 이용한 무인구간속도위반단속시스템 설치 효과 분석)

  • Yun, Il-Soo;Park, Sung-Ho;Oh, Bong-Sik;Oh, Young-Tae
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.177-185
    • /
    • 2011
  • In order to reduce traffic accidents at long road sections involving high risks of traffic accidents, including tunnels, bridges or curves, the National Police Agency have decided a tentative installation and operation of an automated point-to-point speed enforcement system based on cameras at January, 2007. The first system was established at the direction to Kangreung of Dunnae Tunnel at December, 2007. Currently, the automated point-to-point speed enforcement system operates at 11 sections including eight sections on expressways and three sections on national highways. However, there have been few researches on the effects of the system upon the reduction of traffic accidents in a scientific way. To this end, this research effort was initiated to evaluate the effect of the automated point-to-point speed enforcement system on traffic safety by comparing the number of traffic accidents before and after the installation of the system using a comparison-group(C-G) method. Three-year-long traffic accident data for the expressways were collected in order to evaluate the system. As a result, the installation of the system was found to reduce traffic accidents by 49.97% in average.

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.

Security Problem of National Major Facility's Parking Lot and its Improvement Method -Focused on Doonchi(Waterside) Parking Lot of National (국가중요시설의 주차장 보안의 문제점과 개선방안: 국회둔치주차장을 중심으로)

  • Lee, Sang-Hun;Lee, Sang-Yeol
    • Korean Security Journal
    • /
    • no.50
    • /
    • pp.61-87
    • /
    • 2017
  • National Assembly is a constitutional institution that is required to first consult the will of the people and it should do its effort continuously so that security of citizens using parking lot would be enhanced at the same time while improving parking service in order to increase customer satisfaction of the people. Under this recognition, in this study, Doonchi parking lot of National Assembly under consigned management was first reviewed in a perspective of criminal prevention through environmental design(CPTED) and particularly, fence installation and reinforcement work for securing 'territoriality' and operation of all round shooting camera and installation of No-trespassing warning board at entrance were suggested. Second, it was recommended to change independent control system in which CCTV security system of National Assembly Doonchi parking lot is operated separately from National Assembly safety situation room and integrate it with National Assembly safety situation room(revised to double safety system) and performance of CCTV camera was made to be increased to over 2m. In addition, video recording mode was converted to NVR mode for application to IP camera in the future and in order to avoid dead zone of security monitoring area and based on site inspection result, addition 3 places of newly installing CCTV were indicated. Third, it was recommended to introduce parking fare billing and management system through unmanned equipment in parking lot management and operation.(specialized management of professional parking service provider was reviewed). By doing so, risk of cash handling by charging personnel was removed by reducing current 7 working personnel to 3 and particularly, by converting parking lot management mode being operated temporarily from 9 A.M. to 9 P.M. at present to 24 hours operation mode and providing more specialized parking service, citizens visiting National Assembly were provided with convenience and image of National Assembly was also enhanced. This study was carried out in parallel with various literature and case studies, including data from the Office of the Defense Protection in the National Assembly.

  • PDF

A Study on Policy Alternatives for Major Changes in the Korea's Agricultural Energy System (우리나라 농업 에너지체계의 전환을 위한 정책대안 연구)

  • Jung, In-Whan;Ko, Soon-Chul
    • Journal of Agricultural Extension & Community Development
    • /
    • v.11 no.2
    • /
    • pp.251-265
    • /
    • 2004
  • The agricultural sector's economic structure in Korea is regarded to encounter major barriers on the way toward revitalizing its economic prosperity. Among many, the energy-related problem is one of prime nuclei embedded in the country's agricultural sector. The ought-to-come structural changes in the country's agricultural energy system hinge upon the central government's policy direction as well as efforts of local governments and local farming community members. The indirect aids via 'cross subsidy' of electricity tariff rate and 'tax-exempt price' of oil fuels are two notable causes of the unsustainable energy consumption pattern in the country's agricultural sector. As measures, demand-side management(DSM) and energy-efficiency promotions are regarded to be the most attractive methods for energy conservation and economic productivity as well. Development of renewable energy sources are also receiving a great deal of attention for the long-term alternatives to the country's existing oil-based agricultural production mode. This study examines the contributive potential of DSM approaches and renewables-based technologies. With the critical evaluation on the concurrent adversities of the country's agricultural energy system, various sources of renewable energy-solar power, wind power, biomass, etc.-are examined for the purpose of technological and economical viability. As sufficient potentials of renewable energy sources are being estimated, both the system production cost and the installation cost for the county's rural areas are expected to lower in the long term. DSM options are also evaluated to be fruitful even in the short term. Both the public and civil arenas must galvanise each side's effort in order to promote these policy options and community potentials.

  • PDF